International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP9A : Meeting 2001-10-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP9A  C (2001-10-01) 

ITU-R WP9A

Performance and availability, interference objectives and analysis, effects of propagation, and terminology

Meeting  from 2001-10-01 to 2001-10-08

held in Switzerland [Geneva]

Results:108 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 58 ]  
 
Liaison statement to WP 9A concerning multipath fading prediction for link hop lengths less than 7 km     WP 3M   2001-10-01
[ 57 ]  
 
Liaison statement to WP 9A concerning conversion from average worst month to shorter worst periods of time     WP 3M   2001-10-01
[ 56 ]  
 
Chairman's Report of the meeting of Working Party 9A held in Geneva from 12-19 March 2001     Chairman, WP 9A   2001-10-01
[ 55 ]  
 
Liaison Statement to WP 9A     WP 4-9S   2001-10-01
[ 54 ]  
 
LS to WP 9A - Interference criteria to protect the fixed service systems from interference produced by GSO and Non-GSO satellites in the 37-40 GHz and 40.5-43.5 GHz bands     WP 4-9S   2001-10-01
[ 53 ]  
 
Liaison statement to Working Parties 4A, 4B, 9A and 9B - Fixed service and fixed-satellite service parameters and characteristics in the 38 GHz and 40 GHz bands to be considered under agenda item 1.32 (WRC-03)     WP 4-9S   2001-10-01
[ 52 ]  
 
List of documents issued     BR Secretariat   2001-10-01
[ 51 ]  
 
Draft Revision of Recommendation ITU-R F.592-2     SG 9   2001-10-01
[ 50 ]  
 
Proposed preliminary draft new Recommendation - Evaluation and planning of Fixed Service Radio System in a multipath fading environment     Tele-IP   2001-10-01
[ 49 ]  
 
An introduction to the proposed preliminary draft new Recommendation evaluation and planning of radio systems in a multipath fading environment     Tele-IP   2001-10-01
[ 48 ]  
 
Preliminary Draft Revision of Rec. ITU-R F.592 - Terminology used for Radio-Relay Systems     Russian Federation   2001-10-01
[ 47 ]  
 
Inconsistency between error performance objectives approaches for bit rates below and above the primary rate     Russian Federation   2001-10-01
[ 46 ]  
 
FS interference criteria in the 28 and 40 GHz band     France   2001-10-01
[ 45 ]  
 
Working document toward DNR - Interference criteria to protect broadband wireless access systems in the fixed service from aggregate interference from GSO satellites of other services sharing the 37-40 GHz frequency band on a co-primary basis     United States of America   2001-10-01
[ 44 ]  
 
DNR ITU-R F.[9A/PDIR]-Perform. degradation due to interfer. from other services sharing the same frequ. bands with real digital radio-relay links used in the intern. and nat. portions of a 27 500 km hypothetical ref. path at or above the prim. rat     United States of America   2001-10-01
[ 43 ]  
 
Proposed amendments to PDNR ITU-R [9A/NGSO-3] - Interference criteria to protect the fixed service from time varying aggregate interference from other services sharing the 37-40 and 40.5-43.5 GHz bands on a co-primary basis     United States of America   2001-10-01
[ 42 ]  
 
Comparison between the established and newly proposed methodologies for the evaluation of FSS interference impact on FS systems in frequency bands where precipitation attenuation is the predominant fading mechanism     United States of America   2001-10-01
[ 41 ]  
 
Fixed Service parameters and future use of the frequency range 37.5 to 42.5 GHz     France   2001-10-01
[ 40 ]  
 
Protection criteria for FS systems in the 6 GHz and 14 GHz band     France   2001-10-01
[ 39 ]  
 
A process for incorporation of QoS into F-Series Recommendations     Canada   2001-10-01
[ 38 ]  
 
Review of Recommendation ITU-R F.745 (Resolution ITU-R 44)     Brazil (Federative Republic of)   2001-10-01
[ 37 ]  
 
Proposal for deletion of Recommendations ITU-R F.1189 and ITU-R F.1092     Brazil (Federative Republic of)   2001-10-01
[ 36 ]  
 
Proposed modification to Recommendations ITU-R F.1491 and ITU-R F.1397     Brazil (Federative Republic of)   2001-10-01
[ 35 ]  
 
Proposal for advancing the work on models for planning, evaluating the operation and estimating error performance of fixed radio systems     Telia AB, Farsta   2001-10-01
[ 34 ]  
 
Proposed updating of certain Recommendations which are not reprinted including Recommendation ITU-R F.745     Japan   2001-10-01
[ 33 ]  
 
Liaison statement to ITU-T Study Group 4 (Q.3/4, SG 11 (Q.BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B     ITU-T SG 13   2001-10-01
[ 32 ]  
 
Liaison statement - Progress on Recommendations on availability of the physical layer     ITU-T SG 13   2001-10-01
[ 31 ]  
 
Liaison statement to WP 9A - Derivation of fixed service interference criteria in the 5 925-6 425 MHz band     WP 4-9S   2001-10-01
[ 30 ]  
 
Liaison to Study Group 9 - Conclusions of Study Group 9 meeting concerning future status of Joint Rapporteur Group 8A-9B and restructuring of SG 9 related activities     SG 8   2001-10-01
[ 29 ]  
 
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ...     WP 4-9S   2001-10-01
[ 28 ]  
 
Chairman's Report of the meeting of Working Party 9A held in Geneva (18-25 September 2000)     Chairman, WP 9A   2001-10-01
[ 27 ]  
 
List of documents issued     BRSGD   2001-10-01
[ 26 ]  
 
Consideration of the structure of ITU-R Study Group 9     Canada   2001-10-01
[ 25 ]  
 
Elements for preliminary draft new Recommendation ITU-R F.[PFWA] - Error performance objectives for real digital radio links used in the access network section of the international or national portions of the synchronous hypothetical reference ...     Canada   2001-10-01
[ 24 ]  
 
FS interference criteria in the 38 and 40 GHz band     France   2001-10-01
[ 23 ]  
 
Draft revision of Recommendation ITU-R F.1491 - Error performance objectives for real digital radio links used in the national portion of a 27 500 km hypothetical reference path at or above the primary rate     Russian Federation   2001-10-01
[ 22 ]  
 
Draft revision of Rec. ITU-R F.1189-1 - Error performance objectives for constant bit rate digital paths at or above the primary rate carried by digital radio-relay systems which may form part or all of the national portion of a 27 500 km ...     Russian Federation   2001-10-01
[ 21 ]  
 
Draft revision of Rec. ITU-R F.1092 - Error performance objectives for constant bit rate digital path at or above the primary rate carried by digital radio-relay systems which may form part of the international portion of a 27 500 km ...     Russian Federation   2001-10-01
[ 20 ]  
 
Draft revision of Recommendation ITU-R F.1397 - Error performance objectives for real digital radio links used in the international portion of a 27 500 km hypothetical reference path at or above the primary rate     Russian Federation   2001-10-01
[ 19 ]  
 
Review of scopes of Working Parties within Study Group 9 - Considerations on merging WP 9B and JRG 8A-9B into a unique WP 8-9W     Siemens Information and Communication Networks SpA   2001-10-01
[ 18 ]  
 
Impact of the new ITU-T Recommendation G.828 on design of digital radio-relay links     Russian Federation   2001-10-01
[ 17 ]  
 
Proposed amendments to preliminary draft new Recommendation [9A/NGSO-3] - Interference criteria to protect the fixed service time varying aggregate interference from other services sharing the 37-40 GHz and 40.5-43.5 GHz bands on a co-primary basi     United States of America   2001-10-01
[ 16 ]  
 
Potential upgrade of JRG 8A-9B to a Joint Working Party     United States of America   2001-10-01
[ 15 ]  
 
Review of Study Group 9 questions for applicability of the provisional alternate approval procedure     United States of America   2001-10-01
[ 14 ]  
 
Proposed deletion of certain Recommendations which are not reprinted and proposed revision of Recommendation ITU-R F.745     Japan   2001-10-01
[ 13 ]  
+Add.1 
Additional report to the next Working Party 9A meeting     Chairman, WP 9A   2001-10-01
[ 12 ]  
 
Updating of certain maintained Recommendations in Section 9A     Chairman, WP 9A   2001-10-01
[ 11 ]  
 
Questions identified as suitable for approval by the alternative procedure according to Resolution ITU-R 45     Chairman, SG 9   2001-10-01
[ 10 ]  
 
Recommendations to be brought to the attention of Study Group 9 Working Parties     Chairman, SG 9   2001-10-01
[ 9 ]  
+Add.1 
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9     Chairman, WP 9B   2001-10-01
Results:108 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-11-2