ITUInternationalFrançais Español
OurNewsEventsPublicationsSiteAbout
Print Version
ITU
Home Page : Publications
Delayed Contributions. Meeting: 20 - 24 September 1999. From D60 to D73

List of Delayed Contributions. Meeting: 20-24 September 1999
[COM6-D60] Telkom-Indonesia (Q6/6): Optical fiber cable operation and maintenance support system
[COM6-D61] Korea Telecom (Q5/6): A new method of mid-span branching of optical fiber cable not required a slack loop
[COM6-D62] LM Ericsson and Telia AB (Sweden) (Q1/6): Environmental issues for the outside plant - A "cradle to the grave" approach for environmental impact from a transmission line based on LCA
[COM6-D63] Telecommunication Administration of Ukraine (Q8/6): Test method and acceptance criteria for optical fibre cables
[COM6-D64] Telecommunication Administration of Ukraine (Q3/6): Telecommunication fibre optic cable lines along the railways - General requirements
[COM6-D65] NTT (JAPAN) (Q6/6): Comments on COM 6-52 related to optical cable networks
[COM6-D66] NTT (Japan) (Q4/6, Q10/6, Q13/6): Proposed revisions to draft new Recommendation: COM 6-53
[COM6-D67] NTT (Japan) (Q5/6, Q10/6): Proposed revisions to draft new Recommendation: COM 6-55
[COM6-D68] Brazil (Q4/6, Q13/6): Transmission requirements for HDSL and ADSL systems
[COM6-D69] Brazil (Q4/6, Q13/6): Transmission requirements for ISDN basic access - narrow band
[COM6-D70] PLLB Elettronica SpA (Q6/6): Draft contents on new Recommendation "Optical fibre cable maintenance support system"
[COM6-D71] Brazil (Q7/6): Aerial optical fiber cables - Application and Technology - Brazilian experience
[COM6-D72] Brazil (Q7/6, Q8/6): Creep in aerial optical fiber cables
[COM6-D73] Korea (Q12/6): Case study of buried objects detection by GPR
Top - Feedback - Privacy - Copyright © ITU 2001 All Rights Reserved
Contact for this page : webmaster@itu.int
Updated : 2007-03-30