PaginaUniónEnglish Français
NuestrosNoticiasEventosPublicacionesMapaInfo
Copia Imprimible
Pagina
Pagina Principal : Publicaciones
Delayed Contributions. Meeting: 22-26 February 1999. From D23 to D36

List of Delayed Contributions (Meeting 1-19 March 1999)
[COM5-D23] Sweden (Q1/5): Comments on draft revised Recommendation K.37
[COM5-D24] Australia (Q12/5): Comments and proposal to change text of COM 5-20, COM5-21 and TD7
[COM5-D25] Australia (Q1/5): Proposed changes to incorporate K.ran into K.20 and to appendix 1 of K.res
[COM5-D26] Australia (Q1/5): Proposed text for K.20 "resistibility of access network equipment to overvoltages and overcurrents"
[COM5-D27] China (Q9/5): Calculation of maximum levels of demodulated noise in K.rfi
[COM5-D28] Nippon Telegraph and Telephone Corp. (NTT), (Q12/5): Consideration of equipment safety limits and present situation at NTT
[COM5-D29] Nippon Telegraph and Telephone Corp. (NTT), (Q6/5): Proposal for revision of Recommendation K.34
[COM5-D30] Nippon Telegraph and Telephone Corp. (Japan), (Q1/5): Draft amendment to Recommendation K.20
[COM5-D31] Nippon Telegraph and Telephone (Q1/5): Proposed amendment to draft Recommendation K.res
[COM5-D32] Nippon Telegraph and Telephone Corp. (Q4/5): Proposed text for chapter 5 of the earthing handbook (Testing and maintenance methods for earthing and bonding)
[COM5-D33] Nippon Telegraph and Telephone Corp. and Fujitsu Ltd (Japan): Proposal of K.res definition
[COM5-D34] Fujitsu Ltd. (Japan), (Q1/5): Principle of coordination between primary and secondary protection
[COM5-D35] Bellcore (United States), (Q1/5, Q3/5): Proposal for lightning resistibility tests for equipment on HFC networks
[COM5-D36] Australia (Q1/5): Proposed changes to K.ran to incorporate K.20

Comienzo de la página - Comentarios - Confidencial - Copyright © ITU 2001 Reservados todos los derechos
Contacto public : webmaster@itu.int
Puesto al dia el 2007-03-30