PageUnionEnglish Español
NosActualitésEvénementsPublicationsPlanInfo
Copie Imprimable
Page
Home Page : Publications
Contributions to JWP 10-11S (1998-2000)

[10-11S/1] Documents to be considered in the 1998-1999 study period
[10-11S/1-a1] Documents to be considered in the 1998-1999 study period
[10-11S/2] Experimental satellite broadcast of Eureka 147 DAB from Solidaridad 2
[10-11S/3] Restructuring of Report 10-11S/R1
[10-11S/4] Documents of the final acts of the WRC-97 for consideration of JWP 10-11S
[10-11S/5,11/2,10-11R/2,11-5/3,11A/2,11B/2,11C/2,11E/2] Questions to be brought to the attention of Study Group 11, its Working Parties and Task Groups
[10-11S/6,9D/3] Report of Working Party 9D Rapporteur Group and Study Group 9 Correspondence Group on BSS (sound) and FS sharing in the band 1452-1492 MHz
[10-11S/7,11/3,10-11R/3,11-5/5,11A/3,11B/3,11C/3,11E/3] Recommendations to be brought to the attention of Study Group 11, its Working Parties and Task Groups
[10-11S/8] Question brought to the attention of Working Party 10-11S
[10-11S/9] Preliminary terms of reference of joint rapporteur group 9D/10-11S on frequency sharing between the fixed service and the broadcasting-satellite service (sound)
[10-11S/10] Liaison statement - Recommendation of satellite digital sound boadcasting systems being introduced in the developing world
[10-11S/11] Liaison statement from Task Group 11/5 - Interactive satellite broadcasting systems
[10-11S/12] Interactive satellite broadcasting systems
[10-11S/13] Interactive satellite broadcasting - Conclusions of the second meeting of Task Group 11/5
[10-11S/13a1] Interactive satellite broadcasting systems
[10-11S/14] Status of text of Joint Working Party 10-11S
[10-11S/15] Transmission system for satellite ISDB
[10-11S/16] Meeting of 15-23 January, Honolulu, Hawaii - Review and organization of work
[10-11S/17] Information documents from Inter-Conference Representative Group
[10-11S/18] Issues requiring consideration by Joint Working Party 10-11S
[10-11S/19] Development of interactive television systems in Canada
[10-11S/20] Digital sound broadcasting systems - Tests and announced implementation plans in the Pacific hemisphere
[10-11S/21] Working Document towards a preliminary draft new Recommendation - GSO BSS satellite system characteristics to be considered in analyses of frequency sharing with non-GSO FSS satellite systems
[10-11S/22] Suggested studies for GSO/NGSO sharing in the BSS bands
[10-11S/23] Information paper - Non-GSO fixed satellite system charact.to be considered in conducting freq.sharing analyses between geostationary-sat.orbit (GSO) sat.systems operating in the broadcasting-sat.service (BSS) and the fixed-sat.service
[10-11S/24] Liaison statement from Task Group 1/5 - Spurious emission limits for Earth and space stations in the space services
[10-11S/25] Report on performance validation tests conducted using and end-to-end broadcast chain simulator and prototype flight model of the communications payload and the AFRIBSS digital sound broadcasting satellite
[10-11S/26] Worldspace (AFRIBSS) system verifications - Results of helicopter based satellite emulation experiments
[10-11S/27] Digital System X
[10-11S/27c1] Digital System X
[10-11S/27a1] Digital System X
[10-11S/28] An example of a GSO BSS satellite system for frequency sharing studies with non-GSO FSS systems
[10-11S/29] Protection of the BSS plans against GSO systems in the fixed-satellite service
[10-11S/30] Studies in preparation for WRC-99
[10-11S/31] List of Documents
[10-11S/32] Liaison statement from Task Group 1/5 to Study Group 4, 7, 8, 9, 10 and 11
[10-11S/33] Liaison statement to ITU-R Study Groups 4, 7, 8, 9, 10 and 11 and their relevant Working Parties - Out-of-band (OOB) Emission Limits
[10-11S/34] The results of experimental six-programme DVB-S based satellite operation in Russia
[10-11S/35-1] Part 1 - Chairman's report on the first meeting of Joint Working Party 10-11S - 15/23 January 1998 - Honolulu, Hawaii
[10-11S/35-2] Part 2 - Chairman's Report on the first meeting of Joint Working Party 10-11S - 15 to 23 January 1998 - Honolulu, Hawaii
[10-11S/35-3] Part 3 - Chairman's Report on the first meeting of Joint Working Party 10-11S - 15 to 23 January 1998 - Honolulu, Hawaii
[10-11S/35-4] Part 4 - Chairman's Report on the first meeting of Joint Working Party 10-11S - 15 to 23 January 1998 - Honolulu, Hawaii
[10-11S/35-5] Part 5 - Chairman's Report on the first meeting of Joint Working Party 10-11S - 15 to 23 January 1998 - Honolulu, Hawaii
[10-11S/36,11/12,11A/8,11B/12,11C/11,11E/11,10-11R/12,11-5/18] Status of texts of SG 11, WPs and TGs
[10-11S/36R1,11C/11R1,11/12R1,11A/8R1,11B/12R1,10-11/3,10-11Q/8,10-11R/12R1,11-5/18R1] Status of texts of Study Group 11, Working Parties and Task Groups
[10-11S/36R1C1,10-11R/12R1C1,11/12R1C1,11A/8R1C1,11B/12R1C1,11C/11R1C1,10-11Q/8C1,11-5/18R1C1,10-11/3C1] Status of texts of Study Group 11, Working Parties and Task Groups
[10-11S/36R1C2,11/12R1C2,11A/8R1C2,11B/12R1C2,11C/11R1C2,10-11Q/8C2,10-11R/12R1C2,10-11/3C2] Status of texts of Study Group 11, Working Parties and Task Groups
[10-11S/37,10-11R/17,10-4/16,10/8,10A/7,10B/10,10C/5] Status of texts of Study Group 10 Working Parties and Task Groups
[10-11S/37C1, 10/8C1, 10A/7C1, 10B/10C1, 10C/5C1, 10-4/16C1, 10-11R/17C1] Status of texts of Study Group 10 Working Parties and Task Groups
[10-11S/38,10A/10,10B/21,10C/6,10-4/17,10-11R/22] ITU-R patent statements database
[10-11S/39-1] Part 1 - Satellite sound broadcasting - Recent developments in digital sound broadcasting
[10-11S/39-2] Part 2 - Satellite sound broadcasting - Recent developments in digital sound broadcasting
[10-11S/39-3] Part 3 - Satellite sound broadcasting - Recent developments in digital sound broadcasting
[10-11S/39-4] Part 4 - Satellite sound broadcasting - Recent developments in digital sound broadcasting
[10-11S/39-5] Part 5 - Satellite sound broadcasting - Recent developments in digital sound broadcasting
[10-11S/40] Liaison statement to Joint Working Party 10-11S and the IRG - Frequency sharing between the fixed service and the broadcasting-satellite service in the 12 GHz band (Annex 7 to RR Appendix 30)
[10-11S/41,11A/41,11B/27,11C/33] Liaison statement to ITU-R SG 11 - Draft new Recommendation J.94 (J.si)
[10-11S/42] Liaison statement to JWP 10-11S - Parameters required for calculation of the coordination area around Earth stations operating in the broadcasting-satellite service and sharing frequency bands with terrestrial services
[10-11S/43] Liaison statement to JWP 10-11S - Sharing between the broadcasting-satellite service (sound) and mobile aeronautical telemetry systems
[10-11S/44] Liaison statement to JWP 10-11S and its Special Rapporteur SR2
[10-11S/45,4B/22,10B/24,10C/15,11C/35] Liaison statement to ITU-R JWP 10-11S, WP 11C, SG 10, WP 4B and ITU-T SG 9
[10-11S/46] Liaison statement to JWP 10-11S
[10-11S/46C1] Draft corrigendum to liaison statement to GTE
[10-11S/47,11A,11C/36] Liaison statement to JWP 10-11S, WP 11A and WP 11C regarding Recommendation ITU-T J.111(J.INI)
[10-11S/120, 10B/47] Digital sound broadcasting reference receiver
[10-11S/48] Consideration of Annex 7 of Appendix S30 - Liaison statement to the Special Rapporteur Group JWP 10-11S/SRG-1 and to ITU-R Study Groups 4, 8 and 9
[10-11S/49,9D/50] Liaison statement to WP 9D and JWP 10-11S
[10-11S/50] Liaison statement from Working Party 3M to Joint Working Party 10-11S concerning propagation studies for L-band broadcasting satellites providing digital sound services
[10-11S/51] Liaison statement to JWP 10-11S and its Special Rapporteur Group 2
[10-11S/52] Reply to Liaison statement from JWP 10-11S - Monte Carlo method for modeling spurious emissions interference
[10-11S/53,7C/56,4A/90,7B/28,10A/41,10B/29,11C/37] Liaison statement to Working Parties 4A, 7B, 7C, 10A, 10B, 11C and 10-11S - Frequency tolerances
[10-11S/54,4A/91,7D/41,8D/85] Liaison statement to Working Parties 4A, 7D, 8D and 10-11S
[10-11S/55,8D/86] Reply to Joint Working Party 10-11S and for information to Working Party 8D - Limits to spurious emissions, out-of-band emissions, and intermodulation products for earth and space stations in the space services
[10-11S/56,4A/92,7B/29,7C/57,7D/42,8A/60,8B/45,8D/87,9B/59,10A/38,10B/26,11C/38] Liaison statement to WP 4A, 7B, 7C, 7D, 8A, 8B, 8D, 9B, 10A, 10B, 11C and 10-11S - Protection of passive and safety serv. from interf. due to unwanted emissions by other serv.
[10-11S/57,4A/95,7D/44,8A/63,8B/48,8D/90,9B/60,10A/39,10B/27,11C/39]Liaison statement to WPs 4A,7D,8A,8B,8D,9B,10A,10B,11C and 10-11S-Protection of services from interference caused by out-of-band emissions of transmitters operating in adj. allocated bands
[10-11S/58,4A/94,7B/30,7C/59,7D/43,8A/62,8B/47,8D/89,9B/61,10A/40,10B/28,11C/40] Liaison statement to Working Parties 4A, 7B, 7C, 7D, 8A, 8B, 8D, 9B, 10A, 10B, 11C and 10-11S - Maximum necessary bandwidth concept
[10-11S/59] Protection of the BSS plans against long term interference caused by GSO FSS, GSO BSS, NGSO FSS and/terrestrial systems in the case of inter-regional and/or inter-service sharing
[10-11S/59A1] Impact of the interference caused by other services and/or regions into the assignments currently included in Appendices S30 and S30A Plans
[10-11S/59A2] Impact of the interference caused by other services and/or regions into assignments currently included in Appendices S30 and S30A plans
[10-11S/60,1-5/95,4A/100,4B/30,4-9S/50,4-9-11/212,7D/46,8-1/117,8B/50,8D/98,9A/44,9B/62,9D/62,11C/41] Agenda for the World Radiocommunication Conference (WRC-2000)
[10-11S/61,4A/105,1-6/31,7B/33,7C/68] Modifications required to Recommendation ITU-R IS.848 to accomodate earth stations operating to satellites in non-geostationary orbits
[10-11S/62] Part 1 - Draft revision of Recommendation ITU-R BO.1130-1 (Document 10/6(Rev.1)0
[10-11S/62] Part 2 - Draft revision of Recommendation ITU-R BO.1130-1 (Document 10/6(Rev.1)0
[10-11S/63] Coordination procedure for assignments of space operation service in the guardband of BSS ans its associated feederlink plans bands
[10-11S/64] Chairmen's Report for the first meeting of JRG 9D/10-11S (Geneva, 12-13 March 1998)
[10-11S/65] Implementation of the station keeping error with respect to Section 3.11 of Annex 5 to Appendix 30/S30 (WRC-97) and Section 3.15 of Annex 3 to Appendix 30A/S30A (WRC-97
[10-11S/65A1] Implementation of the station keeping error with respect to Section 3.11 of Annex 5 to Appendix 30/S30 (WRC-97) and Section 3.15 of Annex 3 to Appendix 30A/S30A (WRC-97
[10-11S/66] Interference calculation method with respect to sections 3.5.1 and 3.8 of Annex 5 to Appendix 30/S30 (WRC-97) and Section 1.7 of Annex 3 to Appendix 30A/S30A
[10-11S/67] Proposed reponse to TG 1/6 liaison statement - Parameters and methodologies required for the calculation of the coordination area of BSS and BSS feeder link earth stations in the frequency bands covered by Appendices S30 and S30A
[10-11S/68] Maximization of spectrum efficiency from the intra-service interference aspect in the broadcasting satellite service (sound)
[10-11S/69] Comparison between satellite link budgets for digital system A and digital system D
[10-11S/70] Proposed draft new Recommendation for ISDB-S based on framework defined in Annex 7 to Doc. 10-11S/35
[10-11S/71] Measurement results for Region 2B SS receiving Earth station three dimensional antenna patterns
[10-11S/72] A key parameter of NGSO/FSS to check the compliance with the EPFD limit
[10-11S/73] Proposed methodology for analyzing candidate epfd and apfd limits for the broadcasting satellite service and the associated feeder-links
[10-11S/75] Meeting 5-13 October 1998, Geneva - Review and organization of work
[10-11S/75C1] Meeting 5-13 October, 1998, Geneva - Review and organization of work
[10-11S/76] Treatment of internal interference within groups which include adjacent channels
[10-11S/77] Measurements of the effect of EPFD limits on typical BSS GSO earth station receivers
[10-11S/78] Example of the use of the software implementing the proposed methodology for evaluating candidate EPFD and APFD limits for the broadcasting satellite service and the associated feeder-links
[10-11S/78C1] Example of the use of the software implementing the proposed methodology for analyzing candidate EPFD and APFD limits for the broadcasting satellite and the associated feeder-links
[10-11S/79] Considerations of L-Band RF filter complexity and HPA output backoff
[10-11S/80] Proposed preliminary draft new Recommendation - Recommend methodology and principles for calculating PFD levels to protect GSO-BSS networks from NGSO-FSS systems
[10-11S/81- P1] Software implementing the proposed methodology for analyzing candidate EPFD and APFD limits for the broadcasting satellite service and the associated feeder-links
[10-11S/81- P2] Software implementing the proposed methodology for analyzing candidate EPFD and APFD limits for the broadcasting satellite service and the associated feeder-links
[10-11S/82] Proposed revision of Recommendation ITU-R BO.1130-1
[10-11S/83] Protection of broadcasting satellite service in the 12 GHz band from interference caused by non-GSO FSS systems
[10-11S/84] Issues regarding proposed modifications to limits to protect terrestrial services in Region 1 East of longitude 30-degrees East from broadcasting satellite services in Region 2
[10-11S/85] The broadcasting-satellite service (sound) using 2.6 GHz band in Japan
[10-11S/86] Report of the second meeting of the Inter-Conference Representative Group (IRG-2)
[10-11S/87] Protection of other services during replanning studies regarding, and any actual replanning of, the Regions 1 and 3 BSS and feederlinks plans
[10-11S/88] Working Document toward a draft new Recommendation - Multi-dimensional reference patterns for offset-fed BSS earth station antennas in Region 2
[10-11S/89] Preliminary analysis toward using service availability degradation as a broadcasting-satellite service protection criterion
[10-11S/90] Differences between the BSS and the FSS
[10-11S/91] Working document towards a draft new Recommendation - Methodology for establishing protection requirements for digital BSS systems
[10-11S/92] Contribution to the interactive satellite broadcasting Special Rapporteur Group
[10-11S/93] Implementation of protection ratio when wanted and interfered signals are analog
[10-11S/95,10-11Q/12,11-5/48,11C/43,10-11/4] Information document
[10-11S/96] Liaison statement to Joint Working Party 10-11S - Parameters and methodologies required for the determination of the coordination area around BSS and associated feeder link earth stations
[10-11S/97-Part 1] Report on second meeting of Joint Working Party 10-11S - Geneva, 5-13 October 1998
[10-11S/97-Part 2] Report on second meeting of Joint Working Party 10-11S - Geneva, 5-13 October 1998
[10-11S/97-Part 3] Report on second meeting of Joint Working Party 10-11S - Geneva, 5-13 October 1998
[10-11S/97-Part 4] Report on second meeting of Joint Working Party 10-11S - Geneva, 5-13 October 1998
[10-11/98,4-9-11/222,4-9S/93] Liaison statement from WP 4A to JTG 4-9-11 and for information to WPs 4-9S and 10-11S
[10-11S/99,3M/76] Preliminary response from WP 3M to liaison statement from JWP 10-11S concerning rain and cloud attenuation on GSO BSS systems
[10-11S/100,4A/215] Liaison statement to Working Party 4A and Joint Working Party 10-11S - EPFDis
[10-11S/101-P1] Liaison statement to Joint Working Party 10-11S and it Special Rapporteur Group 10-11S/SRG2
[10-11S/101 P2] Liaison statement to Joint Working Party 10-11S and its Special Rapporteur Group 10-11S/SRG2
[10-11S/101-P3] Liaison statement to Joint Working Party 10-11S and it Special Rapporteur Group 10-11S/SRG2
[10-11S/102,SC99-1/6] Coordination procedures between planned and non-planned services in the frequency bands covered by Appendix S30
[10-11S/103,SC99-1/7] Coordination procedures between planned and non-planned services in the frequency bands covered by Appendix S30A
[10-11S/104,8D/201,4A/222,7B/53,8A/100,8B/73,9B/98,9D/108] Liaison statement Working Parties 4A, 7B, 8A, 8B, 8D, 9B and 9D and Joint Working Party 10-11S - Protection of safety services
[10-11S/105,4A/223,7B/54,8D/202] Liaison statement to Working Parties 8D, 4A, 7B and 10-11S on out-of-band emission masks for space services
[10-11S/106, 4A/224, 8D/203] Liaison statement to Working Parties 4A, 8D and 10-11S - Maximum necessary bandwidth concept
[10-11S/107,4A/225,7B/55,7C/106,7D/68,8B/75,8D/204,9B/99,9D/109] Liaison statement to Working Parties 4A, 7B, 7C, 7D, 8B, 9B and 9D and Joint Working Party 10-11S - Protection of passive services
[10-11S/108] Reply to liaison statements from Task Group 1/5 - Unwanted emissions
[10-11S/109] Liaison statement to Joint Working Party 10-11S on frequency sharing between the mobile service and the broadcast-satellite service in the 12 GHz band
[10-11S/110,10B/35,4B/47,7C/157,8A/115, 8B/102,8D/209,9B/102,11C/44] Liaison statement from Task Group 1/5 on preliminary draft new Recommendation and report on intermodulation in transmitters
[10-11S/110r1, 4B/47r1, 7C/157r1, 8A/115r1, 8B/102r1, 8D/209r1, 9B/102r1, 10B/35r1, 11C/44r1] Withdrawal of document
[10-11S/111,9D/111] Coordination between transmitting terrestrial stations and broadcasting satellite service earth stations in non-planned bands
[10-11S/112, 8A/116, 4A/230, 9D/112] Liaison statement to Working Parties 4A, 8A, 9D and Joint Working Party 10-11S
[10-11S/113,10B/36,10/41,10A/56,10C/19,10-11/9,10-11Q/24,10-11R/37] Status of texts of Study Group 10 its Working Parties and Task Group
[10-11S/113R1,10/41R1,10A/56R1,10B/36R1,10C/19R1,10-11/9R1,10-11Q/24R1,10-11R/37R1] Status of text of Study Group 10 Working Parties and Task Group
[10-11/114, 11A/53, 11/65, 11B/32, 11C/45, 11-5/58, 10-11/10, 10-11Q/25, 10-11R/38] Status of texts of Study Group 11, its Working Parties and Task Groups
[10-11S/115] Liaison statement from WP 3M to JWP 10-11S - Building entry loss and vehicle entry loss
[10-11S/116] Liaison statement from Working Party 3M to Joint Working Party 10-11S concerning rain and cloud attenuation on GSO-BSS systems
[10-11S/117] Reply to liaison statements from WP 10-11S
[10-11S/118, 10A/59, 10B/41] Actions from the last 11/5 meeting
[10-11S/119,9D/119,9D/10-11S/19] Chairmen's Report for the second meeting of JRG 9D/10-11S (Geneva, 15-16 October 1998)
[10-11S/120,10B/47] Digital sound broadcasting reference receiver
[10-11S/121, 10B/46] Distortion of DSB (Digital System A) signals caused by on-channel repeaters
[10-11S/122,10/44,11/69,10C/22,11A/57,11B/37,11C/48,11-5/62,10-11/15,10-11Q/29,10-11R/46] Re-organisation of SGs 10 and 11
[10-11S/123,4A/246,4-9S/134,8D/273] Part 1 - Liaison statement to Working Parties 4A, 4-9S, 8D and 10-11S
[10-11S/123,4A/246,4-9S/134,8D/273] Part 2 - Liaison statement to Working Parties 4A, 4-9S, 8D and 10-11S
[10-11S/123,4A/246,4-9S/134,8D/273] Part 3 - Liaison statement to Working Parties 4A, 4-9S, 8D and 10-11S
[10-11S/124,4A/346] Use of the frequency band 18.1-18.4 GHz by NGSO systems in the fixed satellite service (earth-to-space)
[10-11S/125,4A/349] Proposed modification to the reference bandwidth used to express the various EPFD limits contained in Section II of Article S22 and to be applied by NGSO-FSS in the 10-18 GHz band
[10-11S/125a1] Proposed modification to the reference bandwidth used to express the various EPFD limits contained in Section II of Article S22 and to be applied by NGSO-FSS in the 10-18 GHz band
[10-11S/126 - 4A/372] Proposals for the definition of the EPFD up and EPFD is and associated limits in Article S22 in the frequency band 10.7 - 18.4 GHz
[10-11S/127, 4A/404] Geometric conversions for use with the 3D antenna model
[10-11S/128,10A/67,10B/50,10C/23,11A/58,11B/38,11C/50,11-5/63,10-11/17,10-11Q/31,10-11R/48] Collaboration with ITU-R: Category a liaison with ISO/IEC JTC 1/SC 29
[10-11S/129] Liaison statement to JWP 10-11S - Coordination between transmitting terrestrial stations and broadcasting-satellite service earth stations in unplanned bands
[10-11S/130] Liaison statement to JWP 10-11S
[10-11S/131,1-6/86,SC99-1/8] Liaison stat. to JWP10-11S, TG1/6 and to the SC - Method for the determination of the coord.area around a BSS feeder-link transm.earth stations with respect to receiving earth stations in the FSS in the freq.bands 17.7-18.1 GHz
[10-11S/132] Protection of Non-GSO FSS system against GSO BSS system
[10-11S/133] Proposal of modification of Questions ITU-R 93-1/10 and ITU-R 204/10
[10-11S/133r1] Proposal of modification of Questions ITU-R 93-1/10 and ITU-R 204/10
[10-11S/134, 11C/58] Proposed revision to the text of CPM for WRC-2000
[10-11S/135] Amendment to the draft new Report ITU-R BO.[10-11S/R2]
[10-11S/135c1] Amendment to the draft new Report ITU-R BO.[10-11S/R2]
[10-11S/136] Comparison of modulation techniques for hybrid BSS (sound) and gateway antenna
[10-11S/137] Three-dimensional templates scaled for different sizes and frequency bands for offset fed BSS receiving earth station antennae
[10-11S/138] Protection masks and associated calculation methods for interference into broadcast satellite systems involving digital emissions
[10-11S/139] Editorial error in one of the equations that appears in Annex 1 to Recommendation ITU-R BO.1293
[10-11S/140] Information paper - IRG-3 planning approach: channel raster study
[10-11S/141] Geometric conversions for use with the 3D antenna model
[10-11S/142] Evaluating the new JTG 4-9-11 limits and method D against Canadian BSS test points
[10-11S/143] Basis for the development of BSS 3D antenna patterns (PDNR Annex 7 to Doc. 10-11S/97)
[10-11S/144] Effects of solar transits on the performance of broadcast satellite services
[10-11S/145] Compatibility issues between Region 1 BSS and Regions 3 FSS
[10-11S/146, 4-9-11/370] Liaison statement to JTG 4-9-11 (and to JWP 10-11S for information)
[10-11S/147, 4-9-11/371] Liaison statement to JTG 4-9-11 and JWP 10-11S - Definition of the EPFDdown, EPFDup and EPFDis and associted EPFDup and EPFDis limits in article S.22
[10-11S/148, 4-9-11/377] Liaison statement to JWP 10-11S and JTG 4-9-11 - Considerations of the possible use by non-GSO FSS systems (earth to space) of the 18.1-18.4 GHz band
[10-11S/149] Liaison statement to JWP 10-11S - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz
[10-11S/150, SC99-1/9] Liaison statement to JWP 10-11S and to SC - Coordination procedure for the space-operation service in guardbands of Appendices S30 and S30A
[10-11S/151] Level of unwanted emissions generated by GSO space station operating in the band 21.4 - 22.0 GHz into frequency bands allocated to the radio astronomy service
[10-11S/152] Recommendation ITU-R M.1388
[10-11S/153] Revisions to the preliminary draft new Recommendation "Reference antenna radiation patterns for BSS earth station used for individual reception in frequency bands covered by Appendix S30 for use in NGSO frequency sharing studies"
[10-11S/154] Proposed reply from JWP 10-11S to liaison statement from Task Group 1/5 - Out-of-band emission masks for space services
[10-11S/155] Three documents provided by WP 4A and submitted to JWP 10-11S for information
[10-11S/156] Preliminary analysis of co-channel digital-to-digital protection ratios for a variety of modulation formats
[10-11S/157] Impact of the protection of GSO systems on NGSO systems operating co-frequency
[10-11S/158] Possible updated regulatory provisions in the frequency bands covered by Resolution 130 (WRC-97), 131(WRC-97) and 538(WRC-97)
[10-11S/159,10B/51] Proposed addition to the special publication on terrestrial and satellite digital sound broadcasting systems
[10-11S/160] Information on technical changes to GSO BSS links in the 11.7 to 12.75 GHz band to offset interference from certain types of NGSO systems
[10-11S/161] Methodology to estimate long-term EPFD levels as a function of antenna size
[10-11S/162] Development of EPFD limits for NGSO systems operating in the 11.7 to 12.75 GHz BSS bands
[10-11S/163] Protection of Region 2 BSS plan and services via provisions of Annex 7 to Appendix S30 during IRG/GTE studies of re-planning the WRC-97 BSS plan
[10-11S/164] Study of single entry EPFD masks that can be met by the USAKUL1 non-GSO FSS system and the impact on GSO BSS links defined in CR/116
[10-11S/165] Analysis of the EPFD and (APFDup) performance of the USAKU-H2 NGSO FSS system utilizing sub-geosynchronous inclined elliptical orbits
[10-11S/166] BSS sharing with terrestrial services
[10-11S/167] Impact on the allocated BSS service in Region 2 from possible use of the 17.3-17.8 GHz band by NGSO FSS (Earth-to-space)
[10-11S/168] Working document towards a draft new Recommendation - Sharing criteria between BSSTV and terrestrial services at 2 500 MHz
[10-11S/169] Impact of the interference mitigation technique used by the USAKU-M1 Ku-band NGSO system on freeze frame in GSO BSS systems
[10-11S/170] Proposed new Question on technical characteristics to be taken into account in the development of the BSS in the 17.3 to 17.8 GHz band in Region 2
[10-11S/171] Intra-systems and inter-system interference values of CDM-based S-band BSS(sound) system
[10-11S/172] Measured DTH antenna diagrams for evaluation of NGSO interferance into GSO networks
[10-11S/173, 11-5/70] Common characteristics of interactive television broadcasting system services offered to both commercial and emergency response markets
[10-11S/174] Investigation of using axisymmetric versus non-axisymmetric BSS earth station antenna patterns when calculating interference from NGSO FSS systems into GSO BSS systems
[10-11S/175] Review and organization of work - Meeting 19-28 May 1999
[10-11S/175r1] Review and organization of work - Meeting 19-28 May 1999, Geneva
[10-11S/175r2] Review and organization of work - Meeting 19-28 May 1999, Geneva
[10-11S/176] Summary of the identification of possible modifications to the radio regulations to resolve the deficiencies in Articles 4, 6 and 7 of Appendices S30 and S30A in relation to non-planned services
[10-11S/177] Possible modifications to Article S9 and Appendix S5 to resolve the deficiencies in Articles 4, 6 and 7 of Appendices S30 and S30A in relation to non-planned services
[10-11S/178] Further evaluation of reference GSO earth-station radiation patterns for use in interference assessment involving NGSO satellites
[10-11S/179] Cumulated effect of interference from several NGSO FSS systems
[10-11S/180] Intra-system and inter-system interference values of Japanese S-Band BSS(Sound) system
[10-11S/181] Working document towards a preliminary draft new Recommendation on Continuos curves of equivalent power flux-densities to protect earth stations in the broadcasting-satellite service operating to satellites in the geostationary orbit from ...
[10-11S/182] Preliminary draft new Recommendation - Methodology to go from a single entry epfd mask to an aggregate epfd mask and vice-versa
[10-11S/183] Proposed text for the CPM-99 Report - Coexistence between non-GSO FSS and GSO BSS
[10-11S/184] Revised epfd interference protection limits for digital GSO BSS systems in Region 2
[10-11S/185] Inconsistencies in the application of Article 7 of Appendix S30A
[10-11S/186] Sensitivity to interference of BSS carriers of the JTG 4-9-11 data base
[10-11S/187] Application of the proposed preliminary draft new Recommendation on solar transits into GSO links from CR 116
[10-11S/188] Sensitivity of the epfd levels generated by a NGSO FSS network into GSO FSS and BSS networks
[10-11S/189] Impact of NGSO FSS interference into GSO networks operated in slightly inclined orbit
[10-11S/190] Candidate alternative epfd limits in the 1-12 GHz band
[10-11S/191] Derivation of alternative epfd limits in the 10-12 GHz band for GSO BSS
[10-11S/192] Elements for a reply to liaison statements from TG 1/5
[10-11S/193] Coexistence of GSO BSS terminals and NGSO FSS transmit earth stations in the 17 GHz band
[10-11S/194] Sensitivity of GSO-BSS links contained in Circular Letter CR/116
[10-11S/195] APFD and EPFD limits for the protection of GSO/BSS carriers from interference caused by non-GSO systems
[10-11S/196] Definition of the EPFDup and EPFDis and associated limits in Article S22 for the protection of BSS feeder links in the 10.7-18.4 GHz band
[10-11S/197] Static and dynamic analysis of the duration and frequency of occurrence of epfd levels caused by F-SAT MULTI 1B system in relation with synchronisation loss
[10-11S/198] Analysis of the reference antenna patterns defined by JTG 4-9-11 for NGSO/GSO interference analysis
[10-11S/198c1] Analysis of the reference antenna patterns defined by JTG 4-9-11 for NGSO/GSO interference analysis
[10-11S/199] Measurements of the effect of EPFD limits on typical BSS GSO earth station receivers - Region 2
[10-11S/200] Proposed preliminary draft new Recommendation - Impact of the sun interference into a GSO BSS link
[10-11S/201] Proposed revisions to the preliminary draft new Recommendation - Protection of the broadcasting-satellite service in the 12 GHz band and associated feeder links in the 17 GHz band from interference caused by NGSO FSS systems
[10-11S/202] Impact of the geographical location of GSO FSS earth stations on the EPFD level generated by an NGSO FSS system
[10-11S/203], 10/56, 11/75, 10-11/20] Liaison statement to Study Groups 10 and 11, JWP 10-11S and JTG 10-11 - Draft proposal for a Joint Working Party to deal with all aspects of interactive broadcasting
[10-11S/203R1, 10-11/20R1, 10/56R1, 11/75R1] Liaison Statement to Study Groups 10 and 11, JWP 10-11S and JTG 10-11
[10-11S/204] Derivation of alternative EPFD limits in the 10 - 12 GHz band for BSS
[10-11S/205] Revision to the preliminary draft new Recommendation - Protection of the broadcasting-satellite service in the 12 GHz band and associated feeder links in the 17 GHz band from interference caused by NGSO FSS systems
[10-11S/206] Impact of the accuracy of the pointing direction of a GSO antenna towards a GSO Earth station at the edge of coverage
[10-11S/207] List of documents issued
[10-11S/208] Liaison statement to JWP 10-11S
[10-11S/209-1] Report of the third meeting of Working Party 10-11S
[10-11S/209-2] Report of the third meeting of Working Party 10-11S
[10-11S/209-3] Report of the third meeting of Working Party 10-11S
[10-11S/209A1] Report of the third meeting of Working Party 10-11S
[10-11S/210] Liaison statement to ITU-R Joint Working Party 10-11S
[10-11S/211,4A/426] Liaison statement to JWP 10-11S and WP 4A - Regulatory/procedural aspects relating to Appendices 30 and 30A, in the framework of WRC-99 agenda items 1.19, 1.19bis and 1.20
[10-11S/212, 4A/427, 7D/103] Liaison statement to Working Parties 4A, 7D and 10-11S and to the Chairmen of Working Parties 4A, 7D and 10-11S
[10-11S/213] Liaison Statement - Draft new recommendation J.SMATV/MATV
[10-11S/214, 4A/429, 7B/69, 7C/164, 7D/105, 8A/132, 8B/110, 8D/320, 9B/144, 9C/34, 10A/70, 10B/54, 11C/73] Liaison statement to Working Parties 4A, 7B, 7C, 7D, 8A, 8B, 8D, 9B, 9C, 10A, 10B and 11C and Joint Working Party 10-11S
[10-11S/215] Proposed draft modification to Recommendation ITU-R BO.1130-2 on Systems selection for digital sound broadcasting
[10-11S/216] Report of testing results for Digital System [E]
[10-11S/217] Studies on enhanced channel bandwidth and orbital offsets
[10-11S/218] Liaison statement to JWP 10-11S regarding the view of Annexes 1, 4 and 7 to Appendix S30 in the context of BSS replanning
[10-11S/219] Revisions to PDNR on efficient use of the spectrum by BSS (sound)
[10-11S/220] Liaison statement to JWP 10-11S - Request for further studies related to technical parameters for BSS planning exercises (Res. 532)
[10-11S/221] Preliminary analysis toward a preliminary draft new Recommendation regarding transmitting BSS satellites interfering with adjacent receiving BSS satellites in the 17.3 to 17.8 GHz band in Region 2
[10-11S/222] Preliminary draft new Recommendation - Equivalent power flux density limits to protect the broadcasting-satellite service in the 12 GHz band from interference caused by non-GSO FSS systems
[10-11S/223, 9D/153] Liason statement to WP 9D and JWP 10-11S on the limits contained in Section 5 of Annex 1 of Appendix S30
[10-11S/224] epfd limits to protect 1.8 and 2.4 m BSS antennas in the 12.2-12.7 GHz band (WRC-2000 agenda item 1.13)
[10-11S/225] Proposed clarifications and editorial amendments to draft new Rec.: "Functional description to be used in developing software tools for determining conformity of non-GSO FSS networks with limits contained in Article S22 of the radio regulation
[10-11S/226] Proposed reply liaison statement to Working Party 3M concerning - Uplink and downlink modelling of rain and cloud attenuation for GSO BSS systems
[10-11S/227] Issues regarding the draft new Rec.:"Functional description to be in developing software tools for determining conformity of non-GSO FSS networks with power flux-density limits contained in Art.S22 of the radio regulations" (Doc. 11/136)
[10-11S/228] Notes on Questions concerning JWP 10-11S
[10-11S/229] Procedural issues associated with BSS, particularly regarding appendices S30 and S30A (WRC-2000 Agenda item 1.20)
[10-11S/230] Protection of the broadcasting-satellite service from transmitting terrestrial stations and transmitting satellite earth stations
[10-11S/231, 9D/154] Proposed modifications to limits to protect terrestrial services in Region 1 East of longitude 30-degrees east from broadcasting satellite services in Region 2
[10-11S/232] Impact of NGSO gateways on receive BSS earth stations in the 17.3 to 17.8 GHz band for Region 2 and determination of required separation distance
[10-11S/233] Sharing between Region 1 BSS plan systems and REgion 2 FSS networks in the orbital from 37W to 10E
[10-11S/234] Status of texts of Study Group 11, its Working Parties and Task Groups
[10-11S/235, 4A/430, 8A/133, 8B/111, 8D/321] Liaison statement to Working Parties 4A, 8A, 8B, 8D and 10-11S on out of band regions of multicarrier system
[10-11-S/236] Contribution to the report for the DSB special publication (Shadow report: Doc. JWP 10-11S/39)
[10-11S/236r1] Contribution to the Report for the DSB special publication (Shadow Report: Doc. 10-11S/39)
[10-11S/237] Draft new Recommendation ITU-R BO.[DOC.11/136] - Function description to be used in developing software tools for determining conformity of non-GSO FSS networks with limits contained in Article S22 of the Radio Regulations
[10-11S/238] Review and organization of work
[10-11S/238r1] Review and organization of work
[10-11S/239] Analysis of cross-polarization interference to BSS antennas
[10-11S/240] Interim draft report of the Special Rapporteur Group 8
[10-11S/241] Special Rapporteur on consolidation of requirements for digital multi-programme broadcasting-satellite systems; and their evaluation
[10-11S/242] Proposed reply to Working Party 4A
[10-11S/243] Progress report on revisions to update Recommendation ITU-R BO.566-3 on terminology for broadcasting satellites
[10-11S/244] Proposed draft new Recommendation - Digital multi-programme television systems for use by satellites operating in the 11/12 GHz frequency range
[10-11S/245] Draft new Recommendation - Methodology to go from single entry EPFDdown masks to aggregate EPFDdown mask or vice-versa
[10-11S/246] Revised EPDF limits for the protection of BSS antennas with diameters of 1.8, 2.4 and 3.0 meters
[10-11S/247] Technical bases for orbital position limitations on the BSS plan for Regions 1 and 3 to permit sharing the 11.7-12.2 GHz band with Region 2 FSS
[10-11S/248] Comparison of the parameters required for the determination of coordination area around BSS receiving earth stations in the 12 and 17 GHz band
[10-11S/249] Report on interactive broadcasting systems for satellite broadcasting services
[10-11S/250] List of documents issued
[10-11S/251, 1-5/228, 4A/435, 7D/107] The Commission of the allocation of frequencies for radio astronomy and space sciences
[10-11S/252] Liaison statement to Joint Working Party 10-11S - System parameters for the determination of the coordination area around a BSS receive earth station in the bands 17.3-17.8 GHz and 21.4-22 GHz
[10-11S/253] Report of the fourth meeting of Joint Working Party 10-11S (Geneva, 18-27 October 1999)
[10-11S/254, 4A/437, 7B/73, 7C/190, 7D/112, 8B/113, 8D/325, 8F/1] Liaison statement from TG 1 /5 to WPs 4A, 7B, 7C, 7D, 8B, 8D, 8F and JWP 10-11S (Chairman) concerning a prelim.draft new Rec. on the protection of passive services from unwanted emissions
[10-11S/255, 4A/440] Proposed new limits on the power flux-density of BSS assignments in the orbital arc 37°W to 10°ES
[10-11S/256, 4A/534, 8D/328] Liaison statement to Working Parties 4A and 8D, and to JWP 10-11S - Progress on the band-by-band study for the protection of passive services from unwanted emissions
[10-11S/257] Liaison statement to JWP 10-11S on PFD limits in sections 5 b) and 5 c) of Annex 1 to Appendix S30
[10-11S/258, 1-5/274, 7D/122, 8D/332] Liaison statement to Working Parties 7D, 8D, Joint Working Party 10-11S and Task Group 1/5 - Proposal for interference calculations between radio astronomy telescopes and NGSO satellite systems
[10-11S/259] Reply to liaison statement from JWP 10-1S - Further studies related to the application of Recommendation ITU-R S.672-4 to BSS satellite transmit and feeder link satellite receive antennas
[10-11S/260, 8B/121] Liaison statement to Working Party 8B and Joint Working Party 10-11S - Study on characteristics of radars and mitigation techniques for the protection of FSS systems in the 17.3-17.7 GHz band
[10-11S/261, 9D/160, 9D-1011S/29] Chairmen's Report for the third meeting of JRG 9D/10-11S

Début de page - Commentaires - Confidentialité - Droit d'auteur © UIT 2001 Tout droits réservés
Contact pour cette page : webmaster@itu.int
Mis à jour le 2007-03-30