|
[Agenda] Draft Agenda for the 5th Meeting of the RAG | |
[RAG96-1-35] Working methods of ITU-R | |
[1] Plan opérationnel du Secteur de l'UIT-R pour 1997 | |
[1C1] Cor.1: 1997 Operational Plan of the Radiocommunication Sector | |
[2] ITU-R Sector estimated resource requirements for the period 98-99 | |
[3] Relevant results of the WTSC and the WTPF | |
[4] Progress report on ITU-2000 | |
[5] Refinement (Resolution 16) | |
[6] Rapporteur on Coordination & Cooperation: Report to 5th Meeting of RAG | |
[7] Proposed structure for WRC-97 | |
[8] Draft sectoral objectives and priorities for the period 1999-2003 | |
[9] LUX : Méthodes de travail pour la préparation des conférences | |
[10] Directors, BR/TSB: Coordination on broadcasting matters | |
[11] SG4+9: Proposal from Study Groups 4 and 9 (January 1997) to the RAG | |
[12] Report of the Special Committee to the Director of the BR | |
[13] CAN/LUX: Conference documents on TIES | |
[14] J: Comments on refinement of the Sectors | |
[15] Rapporteur on Res. 18: Financial matters (fees, deposits, penalties) for satellite filings - Res 18 (Kyoto) | |
[16] SG9: Enhanced participation of private Sectors in ITU-R activities | |
[17] USA: Duration of the RA and adoption of an Assembly methodology for "Approval by Exception" of Recommendations | |
[18] USA: Terminology for Sector participants | |
[19] USA: Questions not being actively studied for report to the Radiocommunication Assembly | |
[20] Options for the study of regulatory/procedural matters | |
[21] USA: Status of Opinions of the Radiocommunication Assembly | |
[22] AUS: Resolution 18 (Kyoto) - financial matters | |
[23] Rapporteur on Work Programme & SG Structure: Report to the 5th meeting of the RAG | |
[24] Chairman WP1A: Liaison statement to the RAG | |
[25] Rapporteur on Strategic Planning: Report to the fifth meeting of the Radiocommunication Advisory Group | |
[26] Draft report of the 2nd meeting of ITU-2000: summary and draft Recommendations | |
[27] Information requested of RAG by ITU-2000 | |
[28] ITU-2000 Recommendation R.19: Type A and Type B approval processes | |
[29] G: Terminology for the "Wireless local loop" | |
[30] G: Deadlines for the submission of documents to SG, TG and WP meetings | |
[31] G: Consideration of contributions at Working Party and Task Group meetings | |
[32] USA: Draft strategic plan for 1999-2003 | |
[33] USA: Radiocommunication Bureau patent policy | |
[34] Ce document existe seulement en anglais. | |
[35] Chairman SG3: Draft revision of Resolution ITU-R 1 | |
[36] USA: Resources for processing of satellite network publications in the BR | |
[37] USA: Consideration of Resolution 18 | |
[38] CAN: Resolution 18 - the likelihood of success | |
[39] Ch. ICG for IMT-2000: ITU-R and ITU-T joint standardization work on IMT-2000 | |
[40] Revision of Resolution ITU-R 1-1 | |
[41] Rapporteur on Working Methods: Report to the fifth meeting of the RAG | |
[42] Acting Chairman, ICG-SAT: Status report on activities of ICG-SAT | |
[43] Chairman, TSAG/RAG JWP on Refinement of R and T Sectors: Report by JWP on Res. 16 to TSAG/RAG | |
[44] Chairman, ITU-R Study Group 10: Refinement of R and T Sectors and Resolution 28 (WTSC96) | |
[45] Rapporteur on Strategic Planning: Draft strategic plan for 1999-2003 | |
[47r1] Ce document existe seulement en anglais. | |