| 
| [GTE99-4/ADM/1] Draft Agenda for the Fourth Meeting of the GTE |  | 
| [GTE99-4/1] Preferred Orbital Positions |  | 
| [GTE99-4/2] On the Bandwidth in BSS Replanning (Japan) |  | 
| [GTE99-4/3] Results of Step 3,4,5 and 6 ot the "Planning Approach" |  | 
| [GTE99-4/3ADD1] Results of Step 3,4,5 and 6 of the "Planning Approach" |  | 
| [GTE99-4/4] Revised Methodology to Implement the New Planning Approach |  | 
| [GTE99-4/5] Amended Technical Assumptions for the Studies Performed by the GTE |  | 
| [GTE99-4/5ADD1] Amended Basic Technical Assumptions for the Studies Performed by the GTE |  | 
| [GTE-4/5Ad1-zip] Amended Basic Technical Assumptions for the Studies Performed by the GTE |  | 
| [GTE99-4/5ADD2] Amended Basic Technical Assumptions for the Studies Performed by the GTE |  | 
| [GTE-4/5Ad2-zip] Amended Basic Technical Assumptions for the Studies Performed by the GTE |  | 
| [GTE99-4/6] Study to Determine the Impact of a Multinational Beam for Germany, Austria, Switzerland and Liechtenstein |  | 
| [GTE99-4/7] Protection of other Services during Replanning Studies Regarding, and any Actual Replanning of the Regions 1 and 3 BSS and Feeder-link Plans (US)  |  | 
| [GTE99-4/8] Study to Determine whether it is Possible to Add two Additional Channels for Each Region 3 Country |  | 
| [GTE99-4/9] Example Dowlink and Feederlink Replanning Exercise for Region 3 (APT) |  | 
| [GTE99-4/9Add1] Example Dowlink and Feederlink Replanning Exercise for Region 3 (APT) |  | 
| [GTE99-4/9ADD2] Example Downlink and Feederlink Planning Exercise for Region 3 (APT) |  | 
| [GTE99-4/10] Request for Inclusion of a Beam for Seychelles in the Replanning Study Under RES.532 |  | 
| [GTE99-4/11] Results of Step 7 of the "Planning Approach" (I.E. Feeder-link analysis) |  | 
| [GTE99-4/12] Results of Compatibility Analyses with Other Services and the Region 2 Plan |  | 
| [GTE99-4/13] Changing of 92E Orbital Position Beam Arrangement (CHN) |  | 
| [GTE99-4/15] Final Report of the Group of Technical Experts (GTE) |  |