CONTENTS

 1     Scope
 2     References
 3     Definitions
 4     Abbreviations
 5     Overview of the conformance assessment process
        5.1     Introduction
        5.2     Preparation for testing
        5.3     Test operations
        5.4     Test report production
 6     Preparation for testing
        6.1     Introduction
        6.2     Requirements for testability of the System under Test
        6.3     Communication between the test laboratory and the client
        6.4     Documentation for conformance assessment
 7     Test operations
        7.1     Introduction
        7.2     Static conformance review
        7.3     Test selection
        7.4     Test parameterization
        7.5     Verification of Test Coordination Procedures
        7.6     Test campaign
        7.7     Negotiated exits during the test campaign
 8     Test report production
        8.1     Conformance test reports
        8.2     System Conformance Test Report (SCTR)
        8.3     Protocol Conformance Test Report (PCTR)
 9     Compliance
        9.1     Test laboratory role
        9.2     Client role
Annex A – System Conformance Test Report (SCTR) template
        A.1     Introduction
        A.2     Conformance
        A.3     SCTR proforma
Annex B – Protocol Conformance Test Report (PCTR) template
        B.1     Introduction
        B.2     Conformance
        B.3     PCTR proforma
Appendix I – Skeleton IXIT template
        I.1     Introduction
        I.2     IXIT proforma