1 Scope
2
References
3
Definitions
4
Abbreviations
5
Overview of the conformance assessment process
5.1 Introduction
5.2 Preparation for testing
5.3 Test operations
5.4 Test report production
6
Preparation for testing
6.1 Introduction
6.2 Requirements for testability of the System under Test
6.3 Communication between the test laboratory and the client
6.4 Documentation for conformance assessment
7
Test operations
7.1 Introduction
7.2 Static conformance review
7.3 Test selection
7.4 Test parameterization
7.5 Verification of Test Coordination Procedures
7.6 Test campaign
7.7 Negotiated exits during the test campaign
8
Test report production
8.1 Conformance test reports
8.2 System Conformance Test Report (SCTR)
8.3 Protocol Conformance Test Report (PCTR)
9
Compliance
9.1 Test laboratory role
9.2 Client role
Annex A – System Conformance Test Report (SCTR) template
A.1 Introduction
A.2 Conformance
A.3 SCTR proforma
Annex B – Protocol Conformance Test Report (PCTR) template
B.1 Introduction
B.2 Conformance
B.3 PCTR proforma
Appendix I – Skeleton IXIT template
I.1 Introduction
I.2 IXIT proforma