1
Scope and purpose
1.1 Scope
1.2 Introduction and
overview
2 References
2.1 Normative references
2.2 Informative references
2.3 Reference acquisition
3 Terms and definitions
3.1 Terms defined
elsewhere
3.2 Terms defined in this
Recommendation
4 Abbreviations, acronyms and
conventions
4.1 Abbreviations and
acronyms
4.2 Conventions
5 Technical overview
5.1 Background
5.2 Principal technical
considerations
5.3 Devices/Interfaces
5.4 Architecture
5.5 Network environment
6 Technical specification
6.1 General requirements
6.2 TDM-IP network
interworking
6.3 Payload formats
6.4 Timing aspects
6.5 Defects and monitoring
6.6 Security
6.7 Provisioning and
service initiation
6.8 Management
Annex A – Event, SYSLOG, and SNMP trap extensions
A.1 TEA events description
A.2 DOCSIS events
extensions
Annex B – TEA MIB definition
B.1 CL-PW-TC-MIB
B.2 CL-PW-MIB
B.3 CL-PW-TDM-MIB
Appendix I – Operator recommendations
I.1 Preferential treatment
for TE‑CMs
I.2 Service level
agreement considerations
I.3 Standard DOCSIS
operations
Appendix II – Delay aspects
II.1 Upstream delay
II.2 Downstream delay
Appendix III – Bandwidth usage
III.1 Upstream bandwidth
usage
III.2 Downstream bandwidth
usage
Appendix IV – eTEA configuration example
IV.1 Structure
agnostic T1 configuration
IV.2 Structure
agnostic E1 configuration
IV.3 Structure aware 5xDS0
configuration
IV.4 Structure aware 5xDS0
configuration with CAS
IV.5 Structure aware T1
with RTP configuration
Appendix V – Clocking options, by example
V.1 Background
V.2 Clocking modes
V.3 Clocking decision tree
Bibliography