|
(agreed at May 2002 SG 15 meeting)
For details, confirmations, etc., please contact the relevant Rapporteur
Download the document
| WP 1/15 interim meetings |
|
WP |
Q. |
Topic |
Agenda |
Date |
Location/Host |
|
1/15 |
2/15 |
Progression of draft new Recommendations in the G.983.x series towards
completion and maintenance of existing Recommendations |
1. Opening of the Meeting Introductions and Objectives: Progress
Recommendations in the G983.x series towards completion and maintenance of
existing Recommendations. Progress study items
2. Approval of the Agenda
3. OMCI in support of ISDN, VLAN etc
4. Gigabit(s)/s PON service requirements
5. Gigabit(s)/s PON physical media dependent layer
6. Gigabit(s)/s PON transmission convergence layer
7 Presentation of any other contributions
8. (study items) e.g. impact of new component technology on optical
access
9. Agree way forward for Q.2/15
10 Check Rapporteur’s Report and Closing remarks
|
8 July 2002 |
Chitose, Japan
Hosted by Chitose City |
|
1/15 |
2/15 |
Progression of draft new Recommendations in the G.983.x series towards
completion and maintenance of existing Recommendations |
1. Opening of the Meeting Introductions and Objectives: Progress
Recommendations in the G983.x series towards completion and maintenance of
existing Recommendations. Progress study items
2. Approval of the Agenda
3. OMCI in support of ISDN, VLAN etc
4. Gigabit(s)/s PON service requirements
5. Gigabit(s)/s PON physical media dependent
6. Gigabit(s)/s PON transmission convergence layer
7. Presentation of any other contributions
8. (study items) e.g. impact of new component technology on optical
access
9. Agree way forward for Q.2/15
10. Check Rapporteur’s Report and Closing remarks |
24-25 October 2002 |
Boston, USA
Hosted by Quantum Bridge |
|
1/15 |
4/15 |
Progression of DSL and PNT Recommendations |
1. Progression of draft new Recommendations G.993.2 and G.989.3
2. Progression of draft revised Recommendation G.991.2
3. Progression of bis or ter versions of other DSL
Recommendations as needed
4. Progression of G.pnt series of Recommendations
5. Progression of G.bond series Recommendations
6. Progression of G.selt series Recommendations |
17-21 June 2002 |
Bruges, Belgium
Hosted by Alcatel |
|
1/15 |
4/15 |
Progression of DSL and PNT Recommendations |
1. Progression of draft new Recommendations G.993.2 and G.989.3
2. Progression of draft revised Recommendation G.991.2
3. Progression of bis or ter versions of other DSL
Recommendations as needed
4. Progression of G.pnt series of Recommendations
5. Progression of G.bond series Recommendations
6. Progression of G.selt series Recommendations |
5-9 August 2002 |
Ottawa, Canada
Hosted by Catena |
|
1/15 |
4/15 |
Progression of DSL and PNT Recommendations |
1. Progression of draft new Recommendations G.993.2 and G.989.3
2. Progression of draft revised Recommendation G.991.2
3. Progression of bis or ter versions of other DSL
Recommendations as needed
4. Progression of G.pnt series of Recommendations
5. Progression of G.bond series Recommendations
6. Progression of G.selt series Recommendations |
21-25 October 2002 |
ITU HQ, Geneva, Switzerland |
| WP 2/15 interim meetings |
|
WP |
Q. |
Topic |
Agenda |
Date |
Location/Host |
|
2/15 |
5/15 |
Compression and Classification in SPNE |
1. To advance the drafting work of I.733 for expected AAP consent in
January 2003
2. To discuss the Tandem Avoidance Control issue
3. To start the evaluation of SAMP protocol for G.769 |
11-17 September 2002 |
Sweden
Hosted by LM Ericsson |
|
2/15 |
6/15 |
Voice Enhancement in SPNE |
To progress work on new Recommendation G.VED (Voice Enhancement
Devices) in preparation for Consent in January 2003 |
11-17 September 2002 |
Sweden
Hosted by LM Ericsson |
|
2/15 |
7/15 |
Voice gateway equipment |
To prepare Recommendation G.799.1 for consent at the next SG15 meeting
in January 2003 |
11-17 September 2002 |
Sweden
Hosted by LM Ericsson |
| WP 3/15
interim meetings |
|
WP |
Q. |
Topics |
Agenda |
Date |
Location/Host |
|
3/15 |
9/15 |
OTN Protection, X.msr |
1. Meet jointly with Q.7/17 to decide way forward regarding X.msr
(23 July only)
2. Progress work on Generic and ODUk linear protection Recommendations
3. Progress work on Generic and ODUk ring protection Recommendations |
23-26 July 2002 |
Oslo (Norway)
Hosted by Telenor |
|
3/15 |
12/15 |
G.8080/Y.1304 phase 2
Ethernet Architecture |
1. Refine the Living list and draft text for G.8080/Y.1304 phase 2
2. Review VPN service requirements from Q.11/13 interim meeting.
3. Continue the development of G.etna |
7-11 October 2002 |
Ottawa (Canada)
Hosted by Nortel |
|
3/15 |
14/15 |
G.7713.x (DCM Protocols)
G.7712 Revision (DCN)
G.874 (OTN NE Mgmt)
G.875 and G.otn-snmp (info M)
G.7714.1 (Discovery Protocol)
Examine candidate routing protocol |
1. Finalize Specific Protocol Recommendations for Distributed Call and
Connection Management
- G.7713.1 PNNI
- G.7713.2 GMPLS RSVP-TE
- G.7713.3 GMPLS CR-LDP
2. G.7712 Revision (DCN)
3. G.874 (OTN NE Mgmt)
4. G.875 and G.otn-snmp (info M)
5. G.7714.1 (Discovery Protocol)
6. Examine candidate routing protocol |
7-11 October 2002 |
Ottawa (Canada)
Hosted by Nortel |
| WP 4/15
interim meetings |
|
WP |
Q. |
Topics |
Agenda |
Date |
Location/Host |
|
4/15 |
15/15 |
G.65x, G.scl,
G.650.3 |
1. Create PMDQ values and text to support 40 Gbit/s in the
G65x fibre Recs.
2. Arrive at a first draft text for new Rec. G.scl
3. Consider proposals for test methods for new Rec. G.650.3. |
7-8 October 2002 |
Santa Rosa, CA (USA)
Hosted by Agilent |
|
4/15 |
16/15 |
G.capp, Sup.dsn, G.optmon, G.664, G.693, G.959.1, G.IaDI |
1. Progress the text of draft new Rec. G.cap
2. Progress the text of draft new Sup.dsn towards consent at the
October 2003 meeting
3. Progress the development of text for a new Recommendation on optical
performance measurements for maintenance
4. Progress the texts of draft revised Recs. G.664, G.693 and G.959.1
5. Progress the scope statement of a new Recommendation on IaDI
6. Consider contributions on additional topics within the scope of Q.16/15
depending on constraints imposed by the time available to the meeting |
8-10 October 2002 |
Santa Rosa, CA (USA)
Hosted by Agilent |
|
4/15 |
17/15 |
G.663 / Appendix II,
Sup.raman
G.pmdc
G.661, G.662 |
1. Progress on proposed Annex or Corrigenda to Rec. G.663/Appendix II.
2. Progress on proposed Supplement on Raman amplification
3. Possible new (or revision of existing ) Recommendation on
Polarisation Dispersion Compensators, G.pmdc
4. Future work of Q. 17/15 including revision of Recommendations G.661
and G.662 |
7 October 2002 |
Santa Rosa, CA (USA)
Hosted by Agilent |
|