| 
							
								| ITU-T Study Group 15 Rapporteurs Interim Meetings |  
								| 
    
    
WP1/15 interregnum activities
 
 
 
          
            | WP | Q. | Topic | Agenda | Date | Location/Host |  
            | 1/15 | 2/15 | Progression of G.983.x and G.984.x series RecommendationsProgression of G.983.VideoReturnPath
 | Introductions and Objectives: Progress G-PON series of
              Recommendations. Updates to B-PON series. Progress study items | 30 September 2004 | San Ramon, CA, USA.Hosted by SBC.
 |  
            | 1/15 | 4/15 | Progression of xDSL and PNT Recommendations | Progression of draft new Recommendations G.vdsl2, G.bond,
              G.selt and G.pnt3
 Progression of draft new Annex C to G.992.5
 
 Progression of bis or ter versions of other DSL
              Recommendations as needed
 | 14-18 June 2004 | Leuven, Belgium. Hosted by Alcatel.
 |  
            | 1/15 | 4/15 | Progression of xDSL and PNT Recommendations | Progression of draft new Recommendations G.vdsl2, G.bond,
              G.selt and G.pnt3 
 Progression of draft new Annex C to G.992.5
 
 Progression of bis or ter versions of other DSL
              Recommendations as needed
 | 2-6 August 2004 | South Lake Tahoe, California, USA. Hosted by SBC Laboratories and Aware Inc.
 |  
            | 1/15 | 4/15 | Progression of xDSL and PNT Recommendations | Progression of draft new Recommendations G.vdsl2, G.bond,
              G.selt and G.pnt3 
 Progression of draft new Annex C to G.992.5
 
 Progression of bis or ter versions of other DSL
              Recommendations as needed
 | 18-22 October 2004 | Italy.Hosted by ST Micro.
 |  WP2/15 interregnum activities
 
 
          
            | WP | Q. | Topic | Agenda | Date | Location/Host |  
            | 2/15 | 5/15 | Finalize Rec. I.733 Progression of G.769
 | Finalizing the draft text for new Recommendation I.733 (VAME) 
 Advance the work on the future enhancement of Recommendation
              G.769 (IP-CME)
 | 29 September - 05 October 2004 | Austin, texas, USA Hosted by Motorola
 |  
            | 2/15 | 6/15 | Progression of G.160 and of G.168 | Progress work on new Recommendation G.160 (Voice Enhancement
              Devices) including: - Test signals, measurement methods & requirements for AEC
              test
 - Fax/VBD/Textphone performance test
 - Requirements for NR convergence/reconvergence test
 - Structure of NR voice quality test
 - Measurement of SNR
 
 Progress work on revised Recommendation G.168 (Echo Cancellers)
              including:
 - Revise Test 8 to explain optional status and include test for
              "forward transfer" signal. Revisit detection time
              requirements.
 - Extension to Test 10 (fax test) for NLP disable option and
              further development of Test 10C
 - Test 11 (tandem echo cancellers)
 - Test 12 (residual acoustic echo)
 - Test 13 (low bit rate coders)
 | 29 September - 05 October 2004 | Austin, texas, USA Hosted by Motorola
 |  
            | 2/15 | 7/15 | Revisions to G.799.1 IP gateways topics
 | Clarification for the need for a new Recommendation regarding
              IP to IP Gateways | 29 September - 05 October 2004 | Austin, Texas, USA Hosted by Motorola
 |  
            | 2/15 | 8/15 | Revision of G.161 Start developing new Rec(s) for SPNE dynamic coordination
 | Revision of draft new Recommendation G.161 "Interaction
              aspects of signal processing network equipment" for the
              consent date in 2006 
 Develop draft new Recommendation(s) on a mechanism for dynamic
              coordination of SPNE to achieve optimal end-to-end voice quality
              for the consent date in 2006.
 | 29 September - 05 October 2004 | Austin, Texas, USA Hosted by Motorola
 |  
        
WP3/15 interregnum activities
 
 
 
          
            | WP | Q. | Topics | Agenda | Date | Location/Host |  
            | 3 | 9 | G.mplseq, Protection Possibly joint w/Q.3/13
 | Progress the work on protection G.808.2 and G.873.2 
 Progress the work on G.mplseq
 
 Progress the work on Y.ethps, if joint with Q.3/13
 | 20-24 September | Sophia Antipolis Hosted by: ETSI
 |  
            | 3 | 9/ 11/12
 | Ethernet topics, G.8021 Release 2
 | Progress the work on Ethernet Equipment recommendations
              (G.8021) R2 
 Development of further Recommendations in the G.8011.x series
              on Ethernet services
 Consider extensions to G.8010, G.8011, G.8012, G.8011.1
 
 Requirements for a COPS server layer network to support EVPL
              and EVPLAN services.
 
 Initiate the work on G.motnni - MPLS over transport NNI
 | 18-22 October | Milan Hosted by: Alcatel
 |  
            | 3 | 12 | G.mta, G.asm, ASON topics | Work on the preparation of revised Recommendation G.8080 (ASON)
              for consent 
 Work on the preparation of new Recommendation G.mta for consent
 
 Develop material on diffsrv, protection/restoration and OAM.
 
 Work on the preparation of new Recommendation G.asm for consent
 
 Initiate work on G.atd
 | 25-29 October | Ottawa Hosted by Nortel
 |  
            | 3 | 13 | TDM over packets, ODUk into SDH, SDH into ODUk virtually
              concatenated, TU-12 transport over SHDSL | TDM over packets. 
 Work on definition of a network model
 
 Address stage 1 and stage 2 issues
 
 Progress on the specifications of test patterns and required
              performance
 
 Progress the work on mapping of ODUk into SDH and SDH into ODU
              virtual concatenated
 
 Finish the work on SDH TU-12 transport over SHDSL.
 | 21-23 September | Roma (Italy) Hosted by Ericsson
 |  
            | 3 | 14 | ASON Management (G.7718) | Control Plane Management (G.7718) | 13-17 September | Holmdel, New Jersey Hosted by Lucent
 |  
            | 3 | 14 | ASON, Equipment Management | ASON (G.7713 series, G.7714 series, G.7715 series, G.7716,
              G.7717, G.7718 series) 
 Transport Equipment Management (SDH, OTN, VCAT/LCAS, Ethernet ,
              G.7710)
 
 DCN (G.7712)
 | 1-5 November | BerlinHosted by Deutsche Telekom
 |  
WP4/15 interregnum activities
 
 
 
          
            | WP | Q. | Topic | Agenda | Date | Location/Host |  
            | 4/15 | 16/15 | Progress on: - revision G.695, G.664
 - preparation of G.696.1, G.dapp, G.fso, G.otf
 | Progress on: - revision of G.695 and G.664;
 - preparation of G.696.1, G.dapp, G.fso and G.otf.
 | 28 (afternoon) September – 1 October 2004
             | Cambridge (UK) Hosted by Nortel Networks
 |  
            | 4/15 | 17/15 | Progress on: - revision of G.661, G.662, G.671
 - preparation of G.665, G.666
 | To discuss and improve on text for the new Draft
              Recommendations G.665 (ex. G.raman) on Raman Optical Amplifiers,
              G.666 (ex. G.pmdc) on PMD Compensators and for a revised
              Recommendation G.671 on Optical components 
 To discuss and develop text for a new recommendation or
              inclusion in Recommendation G.671 on components as expressed in
              draft Recommendation G.otf (Question 16/15)
 
 To discuss and improve on the text for the Revised
              Recommendation G.661, with the conclusion of revised text for
              Recommendation G.662
 
 To discuss text for a possible Appendix, Supplement, or new
              recommendation on accounting for connector loss between components
              and systems in the IEC and ITU-T contexts.
 
 Contributions on other component types for inclusion in a
              future revised G.671 or as a stand alone Recommendation
 | 27-28 (morning) September 2004 |    |  |