1 Type of Question
Task-oriented Question that should eventually result in a new Recommendation.
2 Motivation
Apart from the distribution of television programmes, the
cable television infrastructure can provide a powerful tool for
the capillary distribution of various other services to the
home, including services that are based on interactivity and
require a return channel.
The cable television infrastructure can thus also be used
with advantage to connect home users to such additional services
as the Internet, as an extension of the public switched network
or of similar delivery systems. Connections via the cable
television network can provide high speed and good quality
performance for the delivery of such additional services, to the
benefit of both the providers of the services and of their users
in the home.
Interconnection of cable television users to the public
switched network or to similar delivery systems requires the use
of an appropriate modem at the user premises, to be designed in
such a way as to optimally meet the operating requirements of
those additional services.
The purpose of the present Question is to initiate the study
of the operating requirements that characterize the additional
services that cable television networks could carry with
advantage to the home, when interconnected with the public
switched network and with similar delivery systems. The aim is
to specify the functional characteristics (e.g. latency) to
be recommended for the modems intended to be placed at the
user's premises to perform such interconnections.
3 Questions
- Which additional services could be carried with
advantage to the user's premises by a cable television
network properly interconnected with the public switched
network or with similar delivery systems?
- Which operating requirements should be met for the
delivery of those additional services to the user's premises
by cable television networks?
- Which functional characteristics should be
recommended for the modems to be placed at the user's
premises in order that those operating requirements may be
optimally met?
4 Expected results and anticipated target dates
It is expected that studies based on this Question will
result in the preparation of a new Recommendation by the year
2002.
5 Relationships
Liaison should be established with Study Groups 13, 15 and 16