Committed to connecting the world

Girls in ICT

Determination of the interference potential, and its possible reduction by mitigation techniques, between earth stations in the fixed-satellite service operating with non-geostationary satellites and stations in the fixed service in the 18/19 GHz band

Report SF.2046-0 (2005)

Status : In force (Main)

Access : Free Download


Available languages and formats :

 

Click on the selected format
and language to get the document

   
Format Size Posted Article Number
English

Word for Windows

1579008 bytes 2005-03-29 E 70000 

PDF (acrobat)

448357 bytes 2005-03-29  
Français

Word for Windows

1440256 bytes 2005-03-29 F 70000 

PDF (acrobat)

460408 bytes 2005-03-29  
Español

Word for Windows

1458688 bytes 2005-03-29 S 70000 

PDF (acrobat)

459200 bytes 2005-03-29