|
|
|
|
COM 9 - LS 25
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00025.zip]
|
|
Reply LS to ITU-R WP 1A and WPs 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems
|
|
Approved on 2013-01-18 in response to ITU-R WP 1A - LS 11.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
-
|
|
For comment to:
|
|
|
For information to:
|
ITU-R WP 5D; ITU-R WP 6A; ITU-R WP 4C; ITU-R WP 7D; SG5; SG15; ITU-R WP 7C; ITU-R WP 3L;
|
|
Deadline:
|
-
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COM 9 - LS 16
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00016.zip]
|
|
Progress of J.svc “Requirements for Scalable Video Transmission System over Cable Network”
|
|
Approved on 2013-01-18.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
-
|
|
For comment to:
|
|
|
For information to:
|
ISO/IEC JTC1/SC29/WG11; SCTE; ITU-R WP 6C; TTA; DVB TM; ETSI TC Cable;
|
|
Deadline:
|
-
|
|
|
|
|
|
|
|
COM 9 - LS 13
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00013.zip]
|
|
Liaison on J.HiNoC-series: high performance network over coax
|
|
Approved on 2013-01-18.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
-
|
|
For comment to:
|
|
|
For information to:
|
ATIS; BROADBAND FORUM; IEC TC 100; SCTE; Metro Ethernet Forum; TTA; TTC; HGI; IEEE SA; DVB TM; Home Grid Forum; JCTEA; SG15; Japan Cable Laboratory; ETSI TC Cable; CCSA;
|
|
Deadline:
|
-
|
|
|
|
|
|
COM 9 - LS 11
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00011.zip]
|
|
Information on and views about the work of Integrated Broadcast and Broadband DTV application control framework Recommendations and revision of Recommendation ITU-T J.201
|
|
Approved on 2013-01-18.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
-
|
|
For comment to:
|
|
|
For information to:
|
ITU-R WP 6B;
|
|
Deadline:
|
-
|
|
|
|
COM 9 - LS 10
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00010.zip]
|
|
LS on progress of draft new Recommendation J.atrans-spec “Advanced digital downstream transmission systems for television, sound and data services for cable distribution”
|
|
Approved on 2013-01-18.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
ARIB; DVB TM; Cable Labs; JCTEA; SCTE DVS; RRA; Japan Cable Laboratory; ETSI TC Cable;
|
|
For comment to:
|
|
|
For information to:
|
-
|
|
Deadline:
|
2013-05-31
|
|
|
|
COM 9 - LS 9
- [http://ifa.itu.int/t/2013/ls/sg9/sp15-sg9-oLS-00009.zip]
|
|
Initiation of the work of draft New Recommendation “Requirements for platform functionalities on the integration of cable STB and mobile second screen devices (J.cab-mob-req)”
|
|
Approved on 2013-01-18.
|
|
Source:
|
ITU-T Study Group 9
|
|
For action to:
|
-
|
|
For comment to:
|
|
|
For information to:
|
FG SmartCable;
|
|
Deadline:
|
-
|
|
|
|
|
|
|
|