International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site map Contact us Print version
  Home : ITU-R : Space Services : SNL : Bringing into use
Radiocommunication Sector (ITU-R)  
Bringing into use of satellite network frequency assignments 
Bringing into use of satellite network frequency assignments

This table gives information about the date of bringing into use of planned and non-planned satellite network frequency assignments.

The notified frequency assignments appear in this list after their publication in Part I-S of the BR IFIC.

The Bureau is also publishing bringing into use information submitted in conjunction with a submission under § 4.1.12/4.2.16 of Appendices 30 and 30A (Part B) or § 6.17 of Appendix 30B (A6B).

Please note that this table is for information only. The official confirmation of bringing into use is the publication in PART I-S and PART II-S of the BR  IFIC.

For more information about the procedure of bringing into use, please refer to the Circular letter CR/343. 

Meaning of the symbol in the column "Status":

  N : Not yet confirmed, the date in the column "Date of bringing into use" is the foreseen date
  I : Initial information on bringing into use
  C : Confirmed brought into use, No. 11.44B conditions fullfilled.

For any comments or information,  please contact us 

Last update of the database: 15.09.2017 - The update is done normally every 2 weeks.

Your query :  All networks
Query the database  - Print version  - Explanations  - Export in txt format  - Export in Excel format 

Total line = 1200/2521
Go to page : 12345678910111213
Notice ID
(SNS)
Satellite Name
(SNL Part B)
ADMORGLong_nomDate of bringing
into use
StatusExpiry Date for
Bringing Into Use
Provision
up down up down up down  up down up down up down up down up down 
95500511 MILSTAR 8  USA  -68 08.08.1997 C  11.2  
94500335 MINISAT-1  E   N-GSO 21.04.1997 C  11.2  
105500097 MISRSAT-1  EGY  N-GSO 17.04.2007 C  11.2  
107500030 MLA-NEQO  MLA  N-GSO 14.07.2009 C  11.2  
114500018 MMI  IND  N-GSO 05.11.2013 C  11.2  
110500294 MMS  USA  N-GSO 12.03.2015 C  11.2  
115500076 MN35-13  MRC  N-GSO 10.03.2018 N 17.09.2021 11.2  
90504431 MOLNIA-1  RUS  N-GSO 01.09.1967 C  11.2  
90504432 MOLNIA-2  RUS  N-GSO 01.12.1970 C  11.2  
90504874 MOLNIA-3  RUS IK  N-GSO 14.04.1975 C  11.2  
103500030 MONITOR  RUS  N-GSO 26.08.2005 C  11.2  
101500359 MOST-1  CAN  N-GSO 30.06.2003 C  11.2  
104500107 MRO  USA  N-GSO 01.08.2005 C  11.2  
101500597 MSAT  CAN  -106.5 02.06.1996 C  11.2  
99500144 MSATNAV  F  GLS N-GSO 03.03.2006 C  11.2  
100500321 MSATNAV-2  F  GLS N-GSO 03.03.2006 C  11.2  
101500014 MSATNAV-3  F  GLS N-GSO 03.03.2006 C  11.2  
103500093 MSATNAV-4  F  GLS N-GSO 03.03.2006 C  11.2  
101500511 MSG  F  ESA 29.08.2002 C  11.2  
317500109 MSG-3.5E  D  EUM 3.5 01.03.2016 C  11.2  
101500512 MSG-S1  F  ESA 10 01.02.2005 C  11.2  
101500510 MSG-S2  F  ESA -10 30.11.2002 C  11.2  
108500627 MSL  USA  N-GSO 26.11.2011 C  11.2  
112500239 MSV-1A  USA  -101 21.08.2012 C  11.2  
114500155 MTG-D1_3.4W  D  EUM -3.4 02.08.2005 C  11.2  
114500156 MTG-D1_9.5E  D  EUM 9.5 15.10.2015 C  11.2  
105500120 MTI  USA  N-GSO 12.03.2000 C  11.2  
106500136 MTSAT-B-145E  J   145 11.07.2006 C  11.2  
97500353 MUSES-B  J   N-GSO 12.02.1997 C  11.2  
107500169 MUSES-C  J   N-GSO 09.05.2003 C  11.2  
96500487 NAHUEL-C  ARG  -72 01.03.1997 C  11.2  
105500142 NANOSAT-1  E   N-GSO 01.03.2005 C  11.2  
90504609 NAVSTAR GPS  USA  N-GSO 30.06.1986 C  11.2  
90504609 NAVSTAR GPS  USA  N-GSO 01.06.2000 C  11.2  
90504609 NAVSTAR GPS  USA  N-GSO 01.06.2001 C  11.2  
103500110 NAVSTAR GPS-IIRF  USA  N-GSO 10.04.2009 C  11.2  
116500205 NAYIF-1  UAE  N-GSO 15.09.2016 C  11.2  
317500185 MEXSAT113 L-CEXT-X  MEX  -113 13.05.2013 C  11.2  
110500271 MEXSAT-114.9 C-KU  MEX  -114.9 28.07.2006 C  11.2  
113500014 MEXSAT114.9 L-CEXT-X  MEX  -114.9 03.01.2013 C  11.2  
113500137 NILESAT-301-7W  EGY  -7 14.09.2010 C  11.2  
112500158 NIRIS  USA  N-GSO 27.06.2013 C  11.2  
98500127 NMP/EO-1  USA  N-GSO 21.11.2000 C  11.2  
112500015 NOAA N  USA  N-GSO 01.06.2006 C  11.2  
102500348 NOAA-KLM  USA  N-GSO 01.01.1997 C  11.2  
102500348 NOAA-KLM  USA  N-GSO 13.05.1998 C  11.2  
116500198 NORSAT-1  NOR  N-GSO 01.01.2017 N 11.09.2022 11.2  
93500332 ZOHREH-2  IRN  26 08.02.2010 C  11.2  
93500332 ZOHREH-2  IRN  26 14.07.2010 C  11.2  
110500216 NPOESS  USA  N-GSO 28.10.2011 C  11.2  
105500436 NPP  USA  N-GSO 28.10.2011 C  11.2  
101500489 N-SAT-110  J   110 07.10.2000 C  11.2  
108501100 N-SAT-110E  J   110 07.10.2000 C  11.2  
112500026 N-SAT-124E  J   124 10.07.2012 C  11.2  
106500574 N-SAT-127W  J   -127 25.12.2003 C  11.2  
101500531 N-SAT-128  J   128 29.08.1995 C  11.2  
108500022 N-SAT-143.72E  J   143.72 24.11.2008 C  11.2  
97500365 N-SAT-146  J   144 28.07.1997 C  11.2  
115500052 N-SAT-154E  J   154 17.02.2016 C  11.2  
114500016 N-SAT2-162E  J   162 10.12.2015 C  11.2  
112500006 N-SAT-82E  J   82 15.04.2013 C  11.2  
112500244 N-SAT-90.75E  J   90.75 01.11.2012 C  11.2  
113500113 N-SAT-93E  J   93 28.11.2012 C  11.2  
104500548 N-SAT-HEO2  J   N-GSO 28.12.2007 C  11.2  
117500007 N-SAT-Y12-110E  J   110 25.03.2017 C  11.2  
117500008 N-SAT-Y12-128E  J   128 10.02.2019 N 01.03.2019 11.2  
117500009 N-SAT-Y12-136E  J   136 01.03.2019 N 01.03.2019 11.2  
106500323 NSS-16  HOL  -22 16.05.2002 C  11.2  
106500346 NSS-18  HOL  -40.5 15.05.1998 C  11.2  
106500362 NSS-19  HOL  -177 01.01.2003 C  11.2  
109500235 NSS-20  HOL  24.11.2006 C  11.2  
107500153 NSS-31  HOL  -20 01.08.2002 C  11.2  
110500361 NSS-35  HOL  -40.5 15.05.1998 C  11.2  
90501090 ZSSRD-2  RUS  -16 20.04.1994 C  11.2  
90501090 ZSSRD-2  RUS  -16 01.10.1994 C  11.2  
96500437 INTELSAT7 307E  USA  -53 08.07.1995 C  11.2  
95500117 INTELSAT7 310E  USA  -50 08.05.1995 C  11.2  
102500109 INTELSAT7 319.5E  HOL  -40.5 01.05.1994 C  11.2  
102500182 INTELSAT7 325.5E  USA  -34.5 01.12.1999 C  11.2  
102500182 INTELSAT7 325.5E  USA  -34.5 01.03.1996 C  11.2  
102500183 INTELSAT7 332.5E  USA  -27.5 01.03.1996 C  11.2  
102500183 INTELSAT7 332.5E  USA  -27.5 01.12.1999 C  11.2  
102500184 INTELSAT7 335.5E  USA  -24.5 01.03.1996 C  11.2  
102500184 INTELSAT7 335.5E  USA  -24.5 01.12.1999 C  11.2  
102500110 INTELSAT7 338.5E  HOL  -21.5 20.02.1999 C  11.2  
102500055 INTELSAT7 33E  USA  33 01.12.1994 C  11.2  
102500055 INTELSAT7 33E  USA  33 01.01.1995 C  11.2  
101500277 INTELSAT7 340E  USA  -20 10.08.2002 C  11.2  
97500430 INTELSAT7 342E  USA  -18 12.08.1998 C  11.2  
97500430 INTELSAT7 342E  USA  -18 12.08.1996 C  11.2  
94500331 INTELSAT7 359E  USA  -1 20.08.1994 C  11.2  
96500508 INTELSAT7 57E  HOL  57 26.06.1996 C  11.2  
103500005 INTELSAT7 62E  USA  62 29.08.2001 C  11.2  
103500005 INTELSAT7 62E  USA  62 06.01.2003 C  11.2  
103500006 INTELSAT7 64E  USA  64 01.12.1994 C  11.2  
103500006 INTELSAT7 64E  USA  64 01.12.1999 C  11.2  
95500027 INTELSAT7 66E  USA  66 25.02.1995 C  11.2  
95500027 INTELSAT7 66E  USA  66 01.12.1999 C  11.2  
102500011 INTELSAT7 85E  USA  85 01.01.1995 C  11.2  
106500338 YAVIR-1  UKR  N-GSO 02.08.2004 C  11.2  
102500011 INTELSAT7 85E  USA  85 01.12.1994 C  11.2  
102500011 INTELSAT7 85E  USA  85 01.12.1999 C  11.2  
105500699 INTELSAT7 95E  HOL  95 24.11.2001 C  11.2  
103500004 INTELSAT8 157E  USA  157 18.01.2003 C  11.2  
101500408 INTELSAT8 183E  HOL  -177 24.11.2001 C  11.2  
101500003 INTELSAT8 304.5E  USA  -55.5 29.07.2000 C  11.2  
103500100 INTELSAT8 307E  USA  -53 01.04.1996 C  11.2  
103500100 INTELSAT8 307E  USA  -53 17.04.2003 C  11.2  
101500580 INTELSAT8 319.5E  HOL  -40.5 15.05.1998 C  11.2  
101500422 INTELSAT8 325.5E  USA  -34.5 06.02.2000 C  11.2  
101500422 INTELSAT8 325.5E  USA  -34.5 01.01.1999 C  11.2  
101500422 INTELSAT8 325.5E  USA  -34.5 01.04.1996 C  11.2  
300500175 INTELSAT8 328.5E  USA  -31.5 01.12.1999 C  11.2  
102500442 INTELSAT8 330.5E  USA  -29.5 12.11.2002 C  11.2  
102500023 INTELSAT8 332.5E  USA  -27.5 26.03.2003 C  11.2  
102500022 INTELSAT8 335.5E  USA  -24.5 19.04.2003 C  11.2  
101500411 INTELSAT8 338.5E  HOL  -21.5 22.12.1997 C  11.2  
103500069 INTELSAT8 33E  USA  33 01.01.1996 C  11.2  
103500069 INTELSAT8 33E  USA  33 01.12.1996 C  11.2  
103500069 INTELSAT8 33E  USA  33 01.12.1994 C  11.2  
103500007 INTELSAT8 340E  USA  -20 10.08.2002 C  11.2  
101500421 INTELSAT8 342E  USA  -18 01.04.1996 C  11.2  
101500421 INTELSAT8 342E  USA  -18 01.01.1999 C  11.2  
103500098 INTELSAT8 359E  USA  -1 18.04.2003 C  11.2  
111500191 ZIYUAN-3  CHN  N-GSO 09.01.2012 C  11.2  
116500002 ZIYUAN-3-02  CHN  N-GSO 30.11.2015 C  11.2  
102500056 INTELSAT8 60E  USA  60 15.10.2001 C  11.2  
102500056 INTELSAT8 60E  USA  60 04.04.2002 C  11.2  
105500094 INTELSAT8 62E  USA  62 01.01.1999 C  11.2  
105500094 INTELSAT8 62E  USA  62 15.10.2001 C  11.2  
105500094 INTELSAT8 62E  USA  62 11.01.2003 C  11.2  
105500094 INTELSAT8 62E  USA  62 01.04.1996 C  11.2  
99500053 INTELSAT8 64E  USA  64 01.06.1998 C  11.2  
99500053 INTELSAT8 64E  USA  64 01.01.1999 C  11.2  
99500053 INTELSAT8 64E  USA  64 01.06.2000 C  11.2  
102500012 INTELSAT8 85E  USA  85 01.12.1994 C  11.2  
102500012 INTELSAT8 85E  USA  85 01.01.1996 C  11.2  
102500434 INTELSAT8 95E  HOL  95 15.03.2003 C  11.2  
107500311 INTELSAT9 304.5E  USA  -55.5 01.03.2007 C  11.2  
107500312 INTELSAT9 307E  USA  -53 01.03.2007 C  11.2  
107500329 INTELSAT9 310E  USA  -50 01.03.2007 C  11.2  
107500313 INTELSAT9 325.5E  USA  -34.5 01.03.2007 C  11.2  
107500330 INTELSAT9 328.5E  USA  -31.5 01.03.2007 C  11.2  
107500331 INTELSAT9 330.5E  USA  -29.5 01.03.2007 C  11.2  
107500332 INTELSAT9 332.5E  USA  -27.5 01.03.2007 C  11.2  
107500333 INTELSAT9 335.5E  USA  -24.5 01.03.2007 C  11.2  
110500215 INTELSAT9 33E  USA  33 01.03.2007 C  11.2  
107500334 INTELSAT9 340E  USA  -20 01.03.2007 C  11.2  
107500339 INTELSAT9 342E  USA  -18 01.03.2007 C  11.2  
107500335 INTELSAT9 359E  USA  -1 01.03.2007 C  11.2  
112500245 YAMAL-49E  RUS  49 03.11.2012 C  11.2  
117500031 YAMAL-55E  RUS  55 05.08.2015 C  11.2  
107500326 INTELSAT9 62E  USA  62 01.03.2007 C  11.2  
107500327 INTELSAT9 64E  USA  64 01.03.2007 C  11.2  
107500328 INTELSAT9 66E  USA  66 01.03.2007 C  11.2  
101500190 INTERBELAR-2  RUS IK  75 27.09.1999 C  11.2  
116500012 NEMO-HD  SVN  N-GSO 18.06.2018 N 12.04.2020 11.2  
113500077 NEOSSAT-1A  CAN  N-GSO 25.02.2013 C  11.2  
116500091 NEW DAWN 21  PNG  60 02.12.2016 C  11.2  
116500091 NEW DAWN 21  PNG  60 27.08.2016 N 19.11.2017 11.2  
116500100 NEW DAWN 22  PNG  62 30.10.2015 C  11.2  
116500100 NEW DAWN 22  PNG  62 19.11.2017 N 19.11.2017 11.2  
114500129 NEW DAWN 23  PNG  64 28.08.2016 N 19.11.2017 11.2  
114500129 NEW DAWN 23  PNG  64 09.08.2016 C  11.2  
116500253 NEW DAWN 25  PNG  -50 09.05.2016 C  11.2  
104500003 NEW HORIZONS  USA  N-GSO 19.01.2006 C  11.2  
113500037 NILESAT-103  EGY  -7 01.12.2012 C  11.2  
116500276 INTERSPUTNIK-16W-2  RUS IK  -16 13.11.2015 C  11.2  
116500275 INTERSPUTNIK-16W-4  RUS IK  -16 13.11.2015 C  11.2  
109500232 INTERSPUTNIK-17E-CK  RUS IK  17 07.12.2006 C  11.2  
103500095 INTERSPUTNIK-3W  RUS IK  -3 01.06.2003 C  11.2  
112500275 INTERSPUTNIK-3W-CK  RUS IK  -3 24.11.2011 C  11.2  
105500292 INTERSPUTNIK-3W-Q  RUS IK  -3 01.09.2005 C  11.2  
112500149 INTERSPUTNIK-75E-CK  RUS IK  75 25.06.2011 C  11.2  
105500291 INTERSPUTNIK-75E-Q  RUS IK  75 01.09.2005 C  11.2  
101500582 INTNL SPACE STATION  USA  N-GSO 01.02.2001 C  11.2  
101500582 INTNL SPACE STATION  USA  N-GSO 01.04.2002 C  11.2  
96500515 INTNL SPACE STN ACS  USA  N-GSO 30.11.2000 C  11.2  
103500127 INTERSPUTNIK-17E  RUS IK  17 03.04.2003 C  11.2  
117500024 IPS  HOL  N-GSO 31.01.2017 N 06.11.2022 11.2  
114500079 IRIS-2A  USA  -100 01.03.2014 C  11.2  
115500213 IRIS-4A  USA  -15.5 30.09.2015 C  11.2  
116500213 IRIS-6A  USA  75 01.07.2016 C  11.2  
112500263 IRIS-8A  USA  -177 01.12.2012 C  11.2  
90500066 JCSAT-1  J   150 15.06.1991 C  11.2  
90500066 JCSAT-1  J   150 20.07.1995 C  11.2  
103500133 JCSAT-1R  J   150 17.02.1997 C  11.2  
103500133 JCSAT-1R  J   150 31.12.2003 C  11.2  
103500133 JCSAT-1R  J   150 01.12.2005 C  11.2  
90500242 JCSAT-2  J   154 15.06.1991 C  11.2  
90500242 JCSAT-2  J   154 20.07.1995 C  11.2  
103500132 JCSAT-2R  J   154 01.12.2005 C  11.2  
103500132 JCSAT-2R  J   154 28.03.2002 C  11.2  
103500134 JCSAT-3A  J   128 29.08.1995 C  11.2  
103500134 JCSAT-3A  J   128 01.12.2005 C  11.2  
103500135 JCSAT-3B  J   124 01.04.1998 C  11.2  
103500135 JCSAT-3B  J   124 01.12.2005 C  11.2  
109500029 JCSAT-FO-124E  J   124 27.12.2005 C  11.2  
108501222 JCSAT-FO-128E  J   128 27.12.2005 C  11.2  
Total line = 1200/2521
Go to page : 12345678910111213

 

Top - Feedback - Contact us -  Copyright © ITU 2017 All Rights Reserved
Contact for this page : Webmaster
Updated : 2017-09-22