This table gives information about the date of bringing into use of planned and non-planned satellite
network frequency assignments.
The notified frequency assignments appear in this list after their publication
in Part I-S of the BR IFIC.
For more information about the procedure
of bringing into use, please refer to the
Circular letter CR/343.
Meaning of the symbol in the column "Status":
| |
N : |
Not yet confirmed, the date in the column "Date of bringing into
use" is the foreseen date |
| |
I : |
Initial information on bringing into use |
| |
C : |
Confirmed brought into use, No. 11.44B conditions fullfilled. |
For any comments or
information, please contact us
Last update of the database:
21.05.2013
- The update is done normally every 2 weeks. |