Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:133 documents
Résultats :  Précédent -  1 - 2 - 3  - Suivant Next
Contributions  [ AI/Question: Q10/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 782 ]  
 
Proposal to withdraw G.8011.1     PMC-Sierra, Inc.   Q10/15   2014-10-29
[ 735 ]  
 
Proposal on Synchronization OAM in packet networks     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q10/15   2014-03-11
[ 673 ]  
 
The requirement and use case for OAM SD/SF messages in multi-layer converged networks     Ministry of Industry and Information Technology (MIIT)   Q12/15, Q11/15, Q10/15   2014-03-11
[ 608 ]  
 
Comments to Recommendation G.8121 (11/2013)     Deutsche Telekom AG   Q14/15, Q10/15   2014-03-10
[ 547 ]  
 
Proposed Supplement for the guidance to performance measurement by ETH OAM     Fujitsu Limited , NEC Corporation   Q14/15, Q10/15   2014-03-10
[ 546 ]  
 
Draft guidance to performance measurement by ETH OAM     Fujitsu Limited , NEC Corporation   Q14/15, Q10/15   2014-03-10
[ 545 ]  
 
Proposed corrections to G.8121 series and G.8151 for alignment     Fujitsu Limited   Q14/15, Q10/15   2014-03-10
[ 544 ]  
 
Proposed update items to G.8121 series in align with G.8151 and G.8152     Fujitsu Limited   Q14/15, Q10/15   2014-03-10
[ 483 ]  
 
MEF Mobile Backhaul     Ericsson Canada, Inc.   Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15   2014-03-07
[ 482 ]  
 
Adoption of MEF technical specifications     Canada   Q10/15   2014-03-07
[ 465 ]  
 
Network optimization based on bandwidth message signalling     Telefon AB - LM Ericsson   Q10/15   2014-03-06
[ 464 ]  
 
Signalling bandwidth adaptation     Telefon AB - LM Ericsson   Q10/15   2014-03-06
[ 449 ]  
 
Text changes in G.8021 for Expected Defect signalling     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 447 ]  
 
Text changes in G.8013 for Expected Defect signalling     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 446 ]  
 
Expected Defect signalling in G.8013 Ethernet OAM     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 445 ]  
 
Text changes in G.8021 for Adaptive Bandwidth Notifications     Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 444 ]  
 
Text changes in G.8013 for Adaptive Bandwidth Notifications     Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 443 ]  
 
Adaptive Bandwidth Notifications in G.8013 Ethernet OAM     China Mobile Communications Corporation , Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 422 ]  
(Rev.1) 
MAC DA setting for Ethernet OAM frames     Alcatel-Lucent Italia S.p.A.   Q9/15, Q10/15   2013-06-18
[ 421 ]  
(Rev.1) 
Considerations regarding ETH-VSP and ETH-EXP OAM functions     Alcatel-Lucent Italia S.p.A.   Q10/15   2013-06-18
[ 420 ]  
 
Proposed update to ITU-T Y.1731 TLVs registry     Telecom Italia S.p.A.   Q10/15   2013-06-18
[ 416 ]  
 
Recent progress and discussion on MPLS-TP P2MP     Nippon Telegraph and Telephone Corporation (NTT)   Q12/15, Q10/15   2013-06-18
[ 391 ]  
 
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731     Alcatel-Lucent USA Inc.   Q10/15   2013-06-18
[ 349 ]  
 
Proposal to support OAM on rooted-multipoint connection in G.8013     Electronics and Telecommunications Research Institute (ETRI)   Q10/15   2013-06-18
[ 348 ]  
 
Comments on the draft revised G.8011.4     Electronics and Telecommunications Research Institute (ETRI)   Q10/15   2013-06-18
[ 343 ]  
 
Proposal for developing a new draft for EP-Tree     Hitachi, Ltd.   Q10/15   2013-06-18
[ 300 ]  
 
Proposal to add an appendix for MPLS-TP packet data throughput to G.8112     Electronics and Telecommunications Research Institute (ETRI) , SK Telecom   Q10/15   2013-06-17
[ 290 ]  
(Rev.1) 
Proposal to update Figure 9-1 of G.8021     NEC Corporation   Q14/15, Q10/15   2013-06-17
[ 289 ]  
(Rev.1) 
Proposed modification of PM terminologies in G.8021     NEC Corporation   Q10/15   2013-06-17
[ 288 ]  
(Rev.1) 
Proposed correction of MAC DA specification in G.8013     NEC Corporation   Q9/15, Q10/15   2013-06-17
[ 232 ]  
 
Proposal on adding bandwidth degradation message in Y.1731     Huawei Technologies Co. Ltd.   Q10/15   2013-06-17
[ 227 ]  
 
Enhancements of OTN hybrid equipment     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 214 ]  
 
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function     Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 204 ]  
 
Proposal to modify clause 7.1.2 for an Amendment to G.8113.1     Korea (Rep. of)   Q10/15   2013-06-17
[ 164 ]  
 
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052     Fujitsu Limited   Q14/15, Q10/15   2013-06-17
[ 163 ]  
 
Proposed solution for SP#26 in G.8013/Y.1731 Living List     Fujitsu Limited   Q10/15   2013-06-17
[ 162 ]  
 
Usage for MI_GAL_ENABLE in PW     Fujitsu Limited   Q14/15, Q12/15, Q10/15   2013-06-17
[ 161 ]  
 
Comments and Proposed update OAM Process descriptions for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 160 ]  
 
Proposed re-structure of Clause 8.8.3 for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 159 ]  
 
Proposed update items to draft G.8121.1 (Clause 8 and 9)     Fujitsu Limited   Q10/15   2013-06-17
[ 158 ]  
(Rev.1) 
Proposed Definitions and Abbreviations to draft G.8121.1     Fujitsu Limited   Q10/15   2013-06-17
[ 157 ]  
 
Comments and proposed update for draft revised G.8121     Fujitsu Limited   Q10/15   2013-06-17
[ 156 ]  
 
Proposed MPLS-TP Linear protection models for Appendix in G.8121     Fujitsu Limited   Q9/15, Q10/15   2013-06-17
[ 76 ]  
 
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP     Canada   Q10/15   2013-06-13
[ 60 ]  
(Rev.1-3) 
Comments on CCCV mode in G.8121.2     FiberHome Technologies Group   Q10/15   2013-06-13
[ 18 ]  
 
Text Changes in G.8021 for At Risk signalling     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2013-05-31
[ 17 ]  
 
Text changes in Y.1731 for At Risk signalling     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-31
[ 16 ]  
 
"At Risk" signalling in Y.1731 Ethernet OAM     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2013-05-31
[ 14 ]  
 
LCK/AIS Reception Process in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 12 ]  
 
Clarification regarding Dataplane Loopback in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
Resultats:133 documents
Résultats :  Précédent -  1 - 2 - 3  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-3-29