Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2013-07-01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2013-07-01) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2013-07-01 au 2013-07-12

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Resultats:59 documents
Résultats :  1 - 2  - Suivant Next
Contributions  [ Questions: Q4/15 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 439 ]  
(Rev.1) 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] Proposal for improvements to draft text for G.fast-psd     Q4/15  
[ 438 ]  
 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware     Q4/15  
[ 437 ]  
 
2013-06-18 Orange   VDSL2 FTTdp annex     Q4/15  
[ 436 ]  
 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] On Aggregate Transmitter Power     Q4/15  
[ 434 ]  
 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] On Power Budget     Q4/15  
[ 431 ]  
(Rev.1) 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] On VHF background noise assumptions for G.FAST     Q4/15  
[ 419 ]  
 
2013-06-18 Sckipio Technologies S.I. Ltd.   G.fast: Discontinuous operation is not always the way to minimize power     Q4/15  
[ 413 ]  
 
2013-06-18 British Telecommunications Public Ltd. Co. (BT Plc)   [FAST] Low Power Mode Requirements for G.FAST     Q4/15  
[ 410 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: OLR procedures during G.fast initialization     Q4/15  
[ 406 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: DRA primitives and interface requirements at the gamma reference point     Q4/15  
[ 405 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: Energy Efficiency-performance trade-offs     Q4/15  
[ 404 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: Vectoring Backchannel Encapsulation     Q4/15  
[ 398 ]  
 
2013-06-18 Alcatel-Lucent Bell N.V.   G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures     Q4/15  
[ 378 ]  
 
2013-06-18 Sckipio Technologies S.I. Ltd.   G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation     Q4/15  
[ 375 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.vdsl2, G.inp: Considerations related to VDSL2 low power mode     Q4/15  
[ 373 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.993.5: Initialization using extended O-P-VECTOR 1     Q4/15  
[ 339 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Operations and maintenance (OAM)     Q4/15  
[ 338 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: G.fast performance over KPN cable     Q4/15  
[ 337 ]  
(Rev.1) 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   G.fast: Proposal for early stages of initialization     Q4/15  
[ 336 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.vdsl2: Proposed corrigendum to G.993.2     Q4/15  
[ 335 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Proposal for G.994.1 tones to be used in G.fast     Q4/15  
[ 334 ]  
 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Update of the working text for PMD section     Q4/15  
[ 333 ]  
(Rev.1) 
2013-06-18 Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   G.fast: Update of the working text for PMS-TC section     Q4/15  
[ 332 ]  
(Rev.1) 
2013-06-18 Deutsche Telekom AG , Lantiq Beteiligungs-GmbH & Co. KG , Telecom Italia S.p.A.   G.lt: MELT accuracy for a multi-component measurement     Q4/15  
[ 307 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: Proposal for discontinuous operation     Q4/15  
[ 306 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: Proposal for Representation of Reported Error Samples     Q4/15  
[ 305 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: DTUs acknowledgment working text     Q4/15  
[ 304 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: Fast OLR behaviour under impulsive noise environment     Q4/15  
[ 303 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: Robust OLR protocol     Q4/15  
[ 286 ]  
 
2013-06-17 Sckipio Technologies S.I. Ltd.   G.fast: TDD-frame and super-frame structure working text     Q4/15  
[ 280 ]  
 
2013-06-17 Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   G.fast: Scrambler working text     Q4/15  
[ 265 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.inp: Extension of ADSL L2 Link State Operation for Retransmission     Q4/15  
[ 264 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast: Multi-Line PSD Mask Constraint     Q4/15  
[ 261 ]  
 
2013-06-17 Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   G.fast: Non-Linear Precoder Ordering     Q4/15  
[ 242 ]  
 
2013-06-17 ADTRAN   G.fast: DRA Timing Requirements     Q4/15  
[ 199 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation , Futurewei Technologies US R&D Center   G.fast: Initialization     Q4/15  
[ 198 ]  
 
2013-06-17 ZTE Corporation   G.hs,G.fast::Additional carrier sets for G.fast     Q4/15  
[ 197 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation   G.fast: Fast OLR proposal.     Q4/15  
[ 196 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation   G.fast:. Improved On Line Reconfiguration for precoder update     Q4/15  
[ 195 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation   G.fast: RMC framing and impact on OLR.     Q4/15  
[ 194 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation   G.vdsl: Low power mode.     Q4/15  
[ 175 ]  
(Rev.1) 
2013-06-17 AT&T, Inc. , Metanoia Technologies, Inc.   G.hn, G.vdsl, G.fast : Powerline Interference Indication and Mitigation for DSL transceivers     Q4/15, Q18/15  
[ 173 ]  
 
2013-06-17 Metanoia Technologies, Inc.   G.inp: Working Text for Power Efficient Transmission     Q4/15  
[ 172 ]  
 
2013-06-17 Metanoia Technologies, Inc.   G.fast: SNR Loss in Discontinuous Operation     Q4/15  
[ 143 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Determining the Time Position of Upstream Probe Sequence     Q4/15  
[ 142 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   G.fast: On Discontinuous Operation     Q4/15  
[ 141 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   On Transition From L2.2 to Other States     Q4/15  
[ 140 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Probe Sequence Modulation and Error Signal Feedback     Q4/15  
[ 139 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   On PSD Control in Vectoring     Q4/15  
[ 138 ]  
 
2013-06-16 Huawei Technologies Co. Ltd.   Asynchronous OLR for PSD Control     Q4/15  
Resultats:59 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2016-9-30