Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:487 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Suivant Next
Contributions  [ Questions: Q13/15 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 2240 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     Q13/15  
[ 2239 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     Q13/15  
[ 2238 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     Q13/15  
[ 2237 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     Q13/15  
[ 2235 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     Q13/15  
[ 2212 ]  
 
2012-08-28 Aviat Networks , Calnex Solutions Limited , Juniper Networks , Sprint , Vitesse Semiconductor Corporation   Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]     Q13/15  
[ 2195 ]  
 
2012-08-27 Rakon Limited   Variable temperature test regime     Q13/15  
[ 2194 ]  
 
2012-08-27 Rakon Limited   G.8263 Clarification     Q13/15  
[ 2172 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Time sync architecture based on multiple PTP domains     Q13/15  
[ 2171 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Hold-off time and interactions between frequency and phase-time planes     Q13/15  
[ 2170 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   A possible solution for multiple GMs and operator intervention     Q13/15  
[ 2169 ]  
 
2012-08-27 China Mobile Communications Corporation , ZTE Corporation   Sync OAM architecture and requirements     Q13/15  
[ 2168 ]  
 
2012-08-27 ZTE Corporation   Further analysis about BMCA of time profile     Q13/15  
[ 2167 ]  
 
2012-08-27 ZTE Corporation   The mapping between ToD and PTP     Q13/15  
[ 2155 ]  
 
2012-08-27 ZTE Corporation   Analysis of interactive mechanism between two layers     Q13/15  
[ 2143 ]  
 
2012-08-27 Calnex Solutions Limited , Deutsche Telekom AG   G.8273: Test methodology annex/appendix     Q13/15  
[ 2106 ]  
 
2012-08-26 ADVA Optical Networking   Architecture Considerations for Time Distribution     Q13/15  
[ 2105 ]  
 
2012-08-26 ADVA Optical Networking   G.8261.1 Network limits     Q13/15  
[ 2104 ]  
 
2012-08-26 ADVA Optical Networking   PTP Network Probe and PTP Clock Probe     Q13/15  
[ 2103 ]  
 
2012-08-26 China Mobile Communications Corporation   Exact PTP clockclass values in application     Q13/15  
[ 2102 ]  
 
2012-08-26 China Mobile Communications Corporation   Proposal on PTP multicast MAC address in 8275.1     Q13/15  
[ 2101 ]  
 
2012-08-26 China Mobile Communications Corporation   Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network     Q13/15  
[ 2100 ]  
 
2012-08-26 China Mobile Communications Corporation   Coordinate mechanism for SyncE and PTP     Q13/15  
[ 2095 ]  
 
2012-08-25 SymmetriCom, Inc.   PRTC Timing Signal Variation for a Particular Design     Q13/15  
[ 2087 ]  
 
2012-08-25 PMC-Sierra, Inc.   Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     Q9/15, Q14/15, Q13/15, Q11/15  
Resultats:487 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2013-6-19