Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 13 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 13  C 

UIT-T SG 13

Réseaux futurs, y compris les réseaux mobiles et les réseaux de prochaine génération

Période d'études 2009

Resultats:1485 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 160 ]  
 
Proposal for full authentication in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 159 ]  
 
Proposal for security countermeasure between HDF and UE     ZTE Corporation   Q5/13   2009-01-07
[ 158 ]  
 
Proposal for security between UE and HDF in Y.mobsec     ZTE Corporation   Q16/13   2009-01-07
[ 157 ]  
 
Proposal for re-authentication in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 156 ]  
 
Proposal for new work item of Mobility Security Framework in NGN     ZTE Corporation   Q16/13   2009-01-07
[ 155 ]  
 
Proposal for IP mobility security in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 154 ]  
 
Proposed to add the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 153 ]  
 
Proposed to add the nomadicity scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 152 ]  
 
Proposed to add the CPN control for the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 151 ]  
 
Proposed to add an information component in Rh reference point     China Telecom, ZTE Corporation   Q4/13   2009-01-07
[ 150 ]  
 
Proposal to do add new definition, References and Abbreviations and acronyms of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 149 ]  
 
Proposal for the information flow of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 148 ]  
 
Proposal for the id-loc-split-based multihoming of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 147 ]  
 
Proposal for the id-loc-split-based mobility of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 146 ]  
 
Proposal for the architecture model of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 145 ]  
 
Proposal for add the contents of the appendix to the body of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 144 ]  
 
Proposed Initial Text for ITU-T Supplement "Evaluation of Existing Signaling Protocol Extensions to Support Y.2171 Admission Control Priority Levels"     AT&T and Telcordia   Q4/13   2009-01-07
[ 143 ]  
 
Proposed changes to sub-clause 9.3.2 of Y.iptv-control-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 142 ]  
 
Proposal to initiate a work item to study DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
[ 141 ]  
 
Proposed replacement for sub-clauses 7.2.1 and 7.2.2 of draft Y.PTDN     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 140 ]  
 
Proposed text of draft recommendation for iSCP scenarios     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 139 ]  
 
Proposed baseline text of draft recommendation for iSCP requirements     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 138 ]  
 
Proposal for additional text on routing optimization consideration for handover     China Mobile, Huawei Technologies Co. Ltd   Q5/13   2009-01-07
[ 137 ]  
 
Proposal for adding VPN identifier and VPN numbering fields in the header of the network layer user packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 136 ]  
 
Proposal to extend fields of the network layer data packet header.     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 135 ]  
 
Proposal for adding multicast identifier field in the header of the network layer data packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 134 ]  
 
The authentication architecture and requirements to provide mobility in NGN     Korea (Republic of)   Q16/13   2009-01-07
[ 133 ]  
 
Some modifications to the scenarios and flows of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 132 ]  
 
Proposed text for Draft Recommendation on IPv6 Evolvement in NGN     Huawei Technologies CO., LTD.   Q7/13   2009-01-07
[ 131 ]  
 
Proposed Draft Recommendation on prefix and address management for network access in IPv6-based NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 130 ]  
 
Proposal to initiate a work item for IPv6 evolvement in NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 129 ]  
 
Proposed text for sub-clauses 8.4.1 and 8.4.2 of draft Recommendation Y.ngnIdMreq     Huawei Technologies Co., Ltd.   Q16/13   2009-01-07
[ 128 ]  
 
Proposed text for Authentication and Pseudonym Management clauses of draft Y.idmMechanisms     Huawei Technologies Co.,Ltd.   Q16/13   2009-01-07
[ 127 ]  
 
Proposed draft text for DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
[ 126 ]  
 
Proposed changes to sub-clause 9.4.2 of Y.iptv-control-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 125 ]  
 
Clarifications of the role of the Proxy Mobility Location Management Function (P-MLMF) in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 124 ]  
 
More Information on IPTV Overlay Network     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 123 ]  
 
Location of mobility service profile in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 122 ]  
 
Layer 2 handover in Y.MMCF     CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 121 ]  
 
Proposed comments to draft Y.CMR     Huawei Technologies Co.,Ltd   Q14/13   2009-01-07
[ 120 ]  
 
Proposed content for sub-clause 7.2 of draft Y.ipv6-object     Huawei Technologies Co., Ltd.   Q7/13   2009-01-07
[ 119 ]  
 
Integrated versus split mode in Y.MMCF     CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 118 ]  
 
Clarification of the role of the HDF in Y.MMCF     China Mobile, CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 117 ]  
 
Proposed text of unicast and multicast resource reuse     Huawei Technologies Co., Ltd.   Q4/13   2009-01-07
[ 116 ]  
 
Proposed text of resource control for QoS downgrading     Huawei Technologies Co., Ltd.   Q4/13   2009-01-07
[ 115 ]  
 
Proposal of New Work Item on the Scenario of Multi-connection Architecture (Q.SCEN-MCA)     Huawei, China Mobile   Q9/13   2009-01-06
[ 114 ]  
 
Proposed work item for scenarios of DSN     Huawei Technologies Co., Ltd.   Q19/13   2009-01-06
[ 113 ]  
 
Proposed work item for Requirements and capabilities of ITU-T DSN     China Mobile   Q19/13   2009-01-06
[ 112 ]  
 
Proposed work item for requirement of multi-connection     China Mobile   Q9/13   2009-01-06
[ 111 ]  
 
Proposed work item for architecture of multi-connection     China Mobile   Q9/13   2009-01-06
Resultats:1485 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2021-02-08