Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG05 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG05  C 

UIT-T SG05

ICT and climate change

Période d'études 2009

Resultats:520 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 70 ]  
 
Different kinds of environmental impacts assessments in the field of ICT, proposal to focus on some of them     France Telecom Orange   Q18/5   2009-10-02
[ 69 ]  
 
Brazil Experience With EMF Measurements, Monitoring and Enforcement     ANATEL, Brazil   Q3/5   2009-10-01
[ 68 ]  
 
Proposal of averaging time reduction for evaluation of human exposure     Republic of Korea   Q3/5   2009-10-01
[ 67 ]  
 
Reference for optical cable usage with metallic parts related to K.25     Republic of Korea   Q5/5   2009-10-01
[ 66 ]  
 
Introduction of "Integrated I/O connection interface for mobile device" standard     Republic of Korea   Q21/5   2009-10-01
[ 65 ]  
 
Proposal for a work item on a method for providing recycling information about the rare metals in ICT products     Republic of Korea   Q21/5   2009-10-01
[ 64 ]  
 
Proposal for development of establishment guidance for green data centers     Republic of Korea   Q19/5   2009-10-01
[ 63 ]  
 
Development of a GHG accounting methodology for ICT projects     Republic of Korea   Q18/5   2009-10-01
[ 62 ]  
 
Development of an ICT environmental labelling standard     Republic of Korea   Q18/5   2009-10-01
[ 61 ]  
 
Development of an ICT-product carbon footprinting methodology     Republic of Korea   Q18/5   2009-10-01
[ 60 ]  
 
The result of ITU Virtual International Symposium on ICTs and Climate Change     Republic of Korea   Q17/5   2009-10-01
[ 59 ]  
 
Proposal for a work item on ICT GHG Inventory System     Republic of Korea   Q18/5   2009-10-01
[ 58 ]  
 
Importance of impact assessment of ICT technologies influencing other sectors     ETRI   Q18/5   2009-10-01
[ 57 ]  
 
Collaboration with ISO TC207 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 56 ]  
 
Collaboration with ISO/IEC JTC 1 for ICT&CC standardization     ETRI   Q17/5   2009-10-01
[ 55 ]  
 
Collaboration with ISO/IEC JTC 1 Study Group on Energy Efficiency of Data Centers     ETRI   Q19/5   2009-10-01
[ 54 ]  
 
Proposal for standardization of Utility Computing services as an energy efficient ICT infrastructure service mechanism     ETRI   Q17/5   2009-10-01
[ 53 ]  
 
A work item proposal for eco-management guidance of ICT equipment for customers     ETRI   Q18/5   2009-10-01
[ 52 ]  
 
Proposal of evaluation method for reduction of environmental loads by improved work efficiency     Japan   Q18/5   2009-10-01
[ 51 ]  
 
Proposed Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 50 ]  
 
Proposed Scope and Study Items for Draft Recommendation of L.methodology     Japan   Q18/5   2009-10-01
[ 49 ]  
 
Proposed Definitions of Terminologies related to ICT and climate change     Japan   Q14/5   2009-10-01
[ 48 ]  
 
Proposal on drafting the key technical points of L.adapter     China   Q21/5   2009-10-01
[ 47 ]  
 
Deficiencies in GDT specifications that hinder coordination design     IEEE   Q4/5, Q13/5   2009-10-01
[ 46 ]  
 
Modelling GDT sparkover     IEEE   Q4/5, Q13/5   2009-10-01
[ 45 ]  
 
EMF exposure assessment - special cases     Telekomunikacja Polska, Poland   Q2/5   2009-10-01
[ 44 ]  
 
Co-endroit, séparation et interopérabilité dans des réseaux de télécommunications     ARPTC   Q1/5   2009-10-01
[ 43 ]  
 
North American wiring simulators     IEEE   Q4/5, Q13/5   2009-09-25
[ 42 ]  
 
Time variation of electromagnetic field strength radiated from IMT-2000 base station antenna     NTT DoCoMo Inc. , NICT   Q3/5   2009-09-17
[ 41 ]  
 
Equipment testing and evaluating methods for the QOE of broadband customer premises equipments within Multi-interference factors     China Telecoms Corp.   Q8/5, Q12/5   2009-09-10
[ 40 ]  
 
Test methods for Resistibility of xDSL modem related to lightning protection     China Telecoms Corp.   Q4/5   2009-09-10
[ 39 ]  
 
Comments and suggestions for an automatic long term EMF measurement system     Swisscom Ltd.   Q3/5   2009-05-19
[ 38 ]  
 
Draft Revision of Rec. K.30rev/K.ocp     Bourns Inc.   Q13/5   2009-05-19
[ 37 ]  
 
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle'     BT , FT , Telecom Italia   QALL/5   2009-05-15
[ 36 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings'     BT   QALL/5   2009-05-15
[ 35 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution'     BT   QALL/5   2009-05-15
[ 34 ]  
 
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle"     BT , NSN Germany   QALL/5   2009-05-15
[ 33 ]  
 
Determination of Relevant Measurement Points     ANATEL, Brazil   Q3/5   2009-05-15
[ 32 ]  
 
Inputs from Brazil to K.Guide     ANATEL, Brazil   Q3/5   2009-05-15
[ 31 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 30 ]  
 
Editorial errors in ITU-T Recommendation K.52     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 29 ]  
 
Comparison between measurement and calculations of the EMF     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 28 ]  
 
A proposal on the structure of a new WP for climate change issues     Republic of Korea   QALL/5   2009-05-14
[ 27 ]  
 
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method     Republic of Korea   Q6/5   2009-05-14
[ 26 ]  
 
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea     KT, Korea   Q9/5   2009-05-14
[ 25 ]  
 
Proposal of measurement time reduction for exposure assessment     Republic of Korea   Q3/5   2009-05-14
[ 24 ]  
 
Proposed new questions and their related Study Groups on ICT and Climate Change     NTT , BT , FT , Fujitsu   QALL/5   2009-05-14
[ 23 ]  
 
Proposed test condition for PTN immunity test     ZTE Corporation   Q12/5   2009-05-14
[ 22 ]  
 
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas     China Mobile Communications Corp.   Q3/5   2009-05-14
[ 21 ]  
 
Conducted electromagnetic environment research in home networking     MIIT, China   Q8/5   2009-05-14
Resultats:520 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2021-02-04