Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2007-06-04 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2007-06-04) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2007-06-04 au 2007-06-15

Lieu : Suisse [Genève]

Autres réunions : 2008-12-01  2008-02-11  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Resultats:332 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 499 ]  
 
Proposals for EEC Jitter Limits in G.paclock     Ericsson   Q13/15   2007-05-24
[ 498 ]  
 
Proposals for Appendix IX in G.8261     Ericsson   Q13/15   2007-05-24
[ 497 ]  
 
Proposals for Test Cases in appendix VI in G.8261     Ericsson   Q13/15   2007-05-24
[ 496 ]  
 
Proposals for clause 8.1 in G.8261     Ericsson   Q13/15   2007-05-24
[ 495 ]  
 
Proposals for models in Appendix V in G.8261     Ericsson , Cisco   Q13/15   2007-05-24
[ 494 ]  
 
Proposal to include PMD limit of 40G system for several modulation formats in G.696.1     NTT   Q6/15   2007-05-24
[ 493 ]  
 
Proposed modification for G.8131 Amendment     Fujitsu   Q9/15   2007-05-24
[ 492 ]  
 
Consideration on T-MPLS connections and its server layer     Fujitsu   Q12/15   2007-05-24
[ 491 ]  
 
Proposed update for G.8112     Fujitsu   Q12/15, Q11/15   2007-05-24
[ 490 ]  
 
Consideration for GFP UPI in T-MPLS and MPLS     Fujitsu   Q11/15   2007-05-24
[ 489 ]  
 
APS protocol for Ethernet Ring Protection (G.8032)     Fujitsu   Q9/15   2007-05-24
[ 488 ]  
 
Comments and proposed modification for draft G.8132     Fujitsu   Q9/15   2007-05-24
[ 487 ]  
 
Proposed work plan for Q9     Fujitsu   Q9/15   2007-05-24
[ 486 ]  
 
Comments on APS MEG level in G.8032     Hitachi   Q9/15   2007-05-24
[ 485 ]  
 
Proposal of text modification in G.8031     Hitachi   Q9/15   2007-05-24
[ 484 ]  
 
Comment on Connectivity Monitoring in G.8011.4     Hitachi   Q11/15   2007-05-24
[ 483 ]  
 
Proposed structure for G.pacmod     Nortel   Q13/15   2007-05-24
[ 482 ]  
 
Clarification to sections in current draft of G.paclock     Nortel   Q13/15   2007-05-24
[ 481 ]  
 
Additional considerations for specification of STM-256 jitter in G.783 and G.825     Nortel   Q13/15   2007-05-24
[ 480 ]  
 
SSM processing time considerations     Nortel   Q13/15   2007-05-24
[ 479 ]  
 
G.vdsl: VDSL2 FEXT Cancellation Performance Estimates in Remote Deployments     Actelis Networks   Q4/15   2007-05-24
[ 478 ]  
 
Request for Home Nework study in SG15     Japan   Q1/15   2007-05-24
[ 477 ]  
 
ADSL2plus Performance Impact Experiments with L2 Mode Fluctuating Crosstalk     BT   Q4/15   2007-05-24
[ 476 ]  
 
Powerline Channel Data     Intel Corp. , Intellon Corp. , Gigle Semiconductor , Conexant Systems, Inc.   Q4/15   2007-05-24
[ 475 ]  
 
G.hn System Requirements     Intel Corp.   Q4/15   2007-05-24
[ 474 ]  
 
A proposed modification to Signal Degrade in G.8031v2     ETRI   Q9/15   2007-05-24
[ 473 ]  
 
G.hn: A Proposal to incorporate CCMP encryption for Network Security     Infineon Technologies AG   Q4/15   2007-05-24
[ 472 ]  
 
Relations between interface types of Packet Transport Networks     Deutsche Telekom   Q11/15   2007-05-24
[ 471 ]  
 
VS Technical Clarification     Huawei Technologies Co., Ltd , China Telecom Co., Ltd   Q12/15   2007-05-24
[ 470 ]  
 
Trigger events for auditing process     Huawei Technologies Co., Ltd   Q14/15   2007-05-24
[ 469 ]  
 
1+1/1:1 protection switching mechanism for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 468 ]  
 
Requirement of partial protection switching for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 467 ]  
 
Proposal for an over-clocked OTN structure (supplement) recommendation     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 466 ]  
 
Proposals for multi-lane 100GE transport     Huawei   Q11/15   2007-05-24
[ 465 ]  
 
Proposal on OAM model and Ring APS for Ethernet ring protection     Huawei   Q9/15   2007-05-24
[ 464 ]  
 
Proposal on OAM Model for T-MPLS SPRing     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 463 ]  
 
Proposal for Application Code and Parameter Values in G.dapp2     MII , China Telecom, China United Telecom , China Mobile , ZTE Corporation , P.R. China Huawei Technologies Co., Ltd   Q6/15   2007-05-24
[ 462 ]  
 
Proposal for FC over T-MPLS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 461 ]  
 
Considerations in Sync Ethernet over OTN     Huawei Technologies Co., Ltd   Q13/15, Q11/15, Q9/15   2007-05-24
[ 460 ]  
 
Consideration about the time requirement     Huawei Technologies Co., Ltd   Q13/15   2007-05-24
[ 459 ]  
 
Connections between ring nodes on T-MPLS ring     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 458 ]  
 
Proposals on a flexible multiplexing/mapping scheme     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 457 ]  
 
Considerations on the evolution of OTN     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 456 ]  
 
G.VDSL: Further information for the SOS proposal     Ministry of Information Industry of the P.R. China , Huawei Technologies Co., Ltd.   Q4/15   2007-05-24
[ 455 ]  
 
G.vdsl: More Results on Performance of a Physical-Layer Retransmission Scheme     Huawei Technologies Co., Ltd. , Ministry of Information Industry of the P.R. China   Q4/15   2007-05-24
[ 454 ]  
 
G.VDSL,Ploam: Modifications in G.993.2 and G.997.1 for SOS functionality     Ministry of Information Industry, P.R. China, Huaw   Q4/15   2007-05-24
[ 453 ]  
 
G.vdsl: Proposal for New Recommendation on FEXT Cancellation for use with VDSL2 Transceivers     Huawei Technologies Co., Ltd   Q4/15   2007-05-24
[ 452 ]  
 
G.vdsl: More Information about Bivariate Histogram for Impulse Noise Monitor     Huawei Technologies Co., Ltd, P.R. China   Q4/15   2007-05-24
[ 451 ]  
 
OMCI for 802.1ad QoS support     Huawei Technologies (Ltd), China   Q2/15   2007-05-24
[ 450 ]  
 
3GPP contributions addressing the need for a clarification of the synchronization requirement at the input of the base stations (for information)     France Telecom   Q13/15   2007-05-24
Resultats:332 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-25