Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2006-02-06 : Contributions Tardives  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  D (2006-02-06) 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Réunion  du 2006-02-06 au 2006-02-17

Lieu : Suisse [Genève]

Autres réunions : 2009-09-28  2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Resultats:217 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions Tardives  Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 648 ]  
 
2006-01-27 MII China   Characteristics of optical fibre submarine cable     Q8/15  
[ 647 ]  
 
2006-01-27 BT   Draft Liaison Statement for Synchronous Ethernet OUI     Q13/15  
[ 646 ]  
 
2006-01-27 USA   Input to G.pactiming on DS1 network limits for CES     Q13/15  
[ 645 ]  
 
2006-01-27 Nortel Networks   Missing words in G.707     Q11/15  
[ 644 ]  
 
2006-01-27 Nortel Networks   Client Service Management Methodology considerations     Q11/15  
[ 643 ]  
 
2006-01-27 Nortel Networks   Ethernet timing flows     Q13/15  
[ 642 ]  
 
2006-01-27 Tellabs   Comments on Transport MPLS SCN     Q12/15  
[ 641 ]  
 
2006-01-27 Tellabs   Synchronous Connection Points     Q12/15  
[ 640 ]  
 
2006-01-27 Tellabs   Comment on Appendix on PWE3 - MPLS Interworking     Q12/15  
[ 639 ]  
 
2006-01-27 Tellabs   Modelling Terminology Mapping     Q12/15  
[ 638 ]  
 
2006-01-27 Infineon   G.shdsl, G.selt: SHDSL Test Parameters     Q4/15  
[ 637 ]  
 
2006-01-27 BSNL   ADSL: Working Text for India Annex     Q4/15  
[ 636 ]  
 
2006-01-27 LM Ericsson AB   PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application     Q4/15  
[ 635 ]  
 
2006-01-27 Deutsche Telekom   Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach     Q6/15  
[ 634 ]  
 
2006-01-27 MII India   Clash of SNC-P protection within TCM section and addendum to ITU-T G.803     Q12/15  
[ 633 ]  
 
2006-01-27 Alcatel   Reserved Labels for Transport MPLS     Q12/15, Q11/15, Q9/15  
[ 632 ]  
 
2006-01-27 Alcatel   Control of a T-MPLS packet transport network     Q14/15, Q12/15  
[ 631 ]  
 
2006-01-27 Lucent Technologies Germany   Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks     Q13/15  
[ 630 ]  
 
2006-01-27 Lucent Technologies Germany   Improvement of clause 10 of G.pactiming in respect to normative and informative content     Q13/15  
[ 629 ]  
 
2006-01-27 Lucent Technologies Germany   Requirements of 10GE LAN signal transport over OTN ODU connections     Q11/15, Q12/15  
[ 628 ]  
 
2006-01-27 N/A   WITHDRAWN (same as D596)  
Same as D.596
 
Q12/15  
[ 627 ]  
 
2006-01-27 BT   Line diagnostics functionality     Q4/15  
[ 626 ]  
 
2006-01-27 BT   G.VDSL Capacity Simulations using Band Plans for 7 MHz and above     Q4/15  
[ 625 ]  
 
2006-01-27 BT   Ethernet Clock extraction and insertion     Q13/15, Q12/15, Q9/15  
[ 624 ]  
 
2006-01-27 BT   Comments/additions to G.7714.1     Q14/15  
Resultats:217 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2006-02-02