Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG11 : Réunion 2004-03-01 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG11  TD (2004-03-01) 

UIT-T SG11

Spécifications et protocoles de signalisation

Période d'études 2001

Réunion  du 2004-03-01 au 2004-03-12

Lieu : Suisse [Genève]

Autres réunions : [ 2004-03-01 ]  2003-09-01  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Documents Temporaires  (GEN)  [ Questions: Q8/11 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 73-GEN ]  
 
2004-03-09 WP2/11 Chairman (G. Ratta)   Discussions of WP 2/11 plenary session     Q9/11, Q8/11, Q7/11, Q6/11  
[ 62-GEN ]  
(Rev.1) 
2004-03-08 WP2/11 Chairman (G. Ratta)   Draft Discussion summary of Q8/11 meetings on 4-5 March 2004     Q8/11  
[ 59-GEN ]  
 
2004-03-05 Editor (T. Tsou)   TRQ.IPQOS.SIG.CS1 (Editing Output)     Q8/11  
[ 50-GEN ]  
 
2004-03-04 Temporary Editor (R. Jesske)   Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Q12/11, Q16/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11  
[ 49-GEN ]  
 
2004-03-04 Temporary Editor (R. Jesske)   TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Q16/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11  
Documents affichés : 5 sur un total de 14  relatifs à cette réunion (en voir plus...)  

 
Documents Temporaires  (PLEN)  [ Questions: Q8/11 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 30-PLEN ]  
 
2004-03-10 WP2/11 Chairman (G. Ratta)   WP2/11 Document Roadmap for SG 11 Plenary     Q9/11, Q8/11, Q7/11, Q6/11  
[ 29-PLEN ]  
(Rev.1-2) 
2004-03-10 WP2/11 Chairman (G. Ratta)   WP2/11 PART I Report     Q9/11, Q8/11, Q7/11, Q6/11  
[ 18-PLEN ]  
(Rev.1-3) 
2004-03-08 WP2/11 Chairman (G. Ratta)   Terms of Reference for Interim Meeting on IP QoS Signalling Requirements     Q8/11  
[ 8-PLEN ]  
 
2004-02-29 WP2/11 Chairman (G. Ratta)   Roadmap for documents associated with discussions of Questions assigned to WP2/11     Q9/11, Q8/11, Q7/11, Q6/11  
 

 
Documents Temporaires  (WP2)  [ Questions: Q8/11 ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 26-WP2 ]  
 
2004-03-05 WP 2/11 Chairman (G. Ratta)   Draft discussion summary of Q8/11 meetings on 4-5 March 2004     Q8/11  
[ 19-WP2 ]  
 
2004-02-29 WP2/11 Chairman (G. Ratta)   Proposed Agenda for Q8/11 Discussions     Q8/11  
[ 15-WP2 ]  
 
2003-10-07 SG 17 (GVA, 10-19 Sept. 2003)   Reply to Proposal on control plane interworking between FR and MPLS     Q5/17, Q8/11  
[ 14-WP2 ]  
(Rev.1) 
2004-02-23 Editor pro tem (G. Ratta)   Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS     Q9/11, Q8/11, Q7/11  
[ 13-WP2 ]  
(Rev.1) 
2004-02-21 WP2/11 Vice-Chairman (D. Knight)   WP 2/11 Work Programme     Q9/11, Q8/11, Q7/11, Q6/11  
Documents affichés : 5 sur un total de 11  relatifs à cette réunion (en voir plus...)  

 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2013-6-19