Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP6B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP6B  C 

UIT-R WP6B

Service de Radiodiffusion: Assemblage et Accès

Resultats:215 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 90 ]  
 
2013-02-07 ITU-T SG 16   Reply liaison statement on HEVC standardization     N/A  
[ 89 ]  
 
2013-02-06 International Organization for Standardization   Liaison statement on MPEG HEVC development     N/A  
[ 88 ]  
 
2013-02-06 International Organization for Standardization   Response to liaison statement and information about listening tests to be foreseen in MPEG-H 3D-Audio     N/A  
[ 87 ]  
 
2013-02-06 International Organization for Standardization   Liaison statement on system for integrated broadcast-broadband services     N/A  
[ 86 ]  
 
2013-02-01 International Organization for Standardization   Liaison statement on MPEG Media Transport     N/A  
[ 85 ]  
 
2013-02-01 International Organization for Standardization   Liaison statement on HEVC coding of interlaced video     N/A  
[ 84 ]  
 
2013-02-01 Chairman, SG 6   Proposed changes to draft revision of Recommendation ITU-R BR.1352 - File format for the exchange of audio programme materials with metadata on information technology media     N/A  
[ 83 ]  
 
2012-11-22 ITU-T FG AVA   Reply liaison statement to JCA-AHF on audiovisual media accessibility     N/A  
[ 82 ]  
 
2012-11-21 Chairman, SG 6   Liaison statement from ITU-D Study Group 1 on the elaboration of a working definition of the term "ICT"     N/A  
[ 81 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     N/A  
[ 80 ]  
 
2012-11-08 ITU-T FG SmartCable   Liaison statement on FG SmartCable activities and meetings     N/A  
[ 79 ]  
 
2012-11-05 ITU-T FG AVA   Liaison statement from FG-AVA to ISO on media access service     N/A  
[ 78 ]  
+Ann.1-14 
2012-10-31 Chairman, WP 6B   Report on the meeting of Working Party 6B (Geneva, 22-26 October 2012)     N/A  
[ 77 ]  
 
2012-10-26 Director, BR   Final list of participants - Geneva, 22-25 October 2012     N/A  
[ 76 ]  
 
2012-10-24 International Organization for Standardization   Response to ITU-R Study Group 6 on Recommendation ITU-R BS.1196-3     N/A  
[ 75 ]  
 
2012-10-19 WP 6C   Draft liaison statement to ITU-T FG AVA     N/A  
[ 74 ]  
 
2012-10-19 BR Study Groups Department   List of documents issued (Documents 6B/37 - 6B/74)     N/A  
[ 73 ]  
 
2012-10-16 RG on rev. Rec. ITU-R BR.1352   Report of the Rapporteur Group on revision of Recommendation ITU-R BR.1352     N/A  
[ 72 ]  
 
2012-10-15 Zweites Deutsches Fernsehen   Hybrid broadcast broadband television (HbbTV)     N/A  
[ 71 ]  
 
2012-10-11 Germany (Federal Republic of)   Proposed editorial changes to Recommendation ITU-R BS.1548-3 - User requirements for audio coding systems for digital broadcasting     N/A  
[ 70 ]  
 
2012-10-10 SG 6 Rapp. to the CCV   Proposal to add a number of broadcasting terms and/or acronyms and definitions to the ITU terminology database     N/A  
[ 69 ]  
 
2012-10-10 WP 7A   Liaison statement to Working Party 6B - WRC-15 Agenda item 1.14 - Future of the coordinated universal item time-scale     N/A  
[ 68 ]  
 
2012-10-10 RG on Hybrid Broadcasting Systems   General requirements for broadcast centric applications on hybrid broadcasting systems     N/A  
[ 67 ]  
 
2012-10-09 Free TV Australia Ltd.   Proposed draft revision of Question ITU-R 130-1/6 - Digital interfaces for production and post-production applications for international exchange within broadcasting systems     130-1/6  
[ 66 ]  
 
2012-10-08 Society of Motion Picture and Television Engineers   SMPTE closed-captioning standards for online video content     N/A  
Resultats:215 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2014-04-09