Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5D : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP5D  C 

UIT-R WP5D

Systèmes IMT

Resultats:729 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 554 ]  
 
2014-01-15 Alcatel-Lucent USA Inc.   Sharing information from the ITU-R Working Party 5A Disaster Relief Rapporteur's " Report on Disaster Relief"     N/A  
[ 553 ]  
 
2014-01-13 Germany (Federal Republic of)   Proposal for a revised Recommendation on global circulation of IMT terminals     N/A  
[ 552 ]  
 
2013-12-11 European Telecommunications Standards Institute   DECT information regarding the update of Recommendation ITU-R M.1457     N/A  
[ 551 ]  
 
2013-12-06 WP 5A   Liaison statement to Working Party 5D - Radio interface standards for broadband wireless access systems in the fixed service operating below 66 GHz     N/A  
[ 550 ]  
 
2013-12-06 WP 5A   Reply liaison statement to Working Party 5C (copy to Working Party 5D and ITU-T Study Groups 13 and 15) - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems     N/A  
[ 549 ]  
 
2013-12-05 WPs 5A and 5C   Liaison statement to ITU-R Study Group 15 (copied for information to ITU-R Working Parties 1A, 5B, 5D and 6A) - Determination of the ITU-T G.fast PSD specification     N/A  
[ 548 ]  
 
2013-12-05 WP 5B   Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D por information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)     N/A  
[ 547 ]  
 
2013-12-05 WP 5A   Liaison statement to Working Parties 5C, 5D and 6A - The use of mobile braoadband networks for electronic news gathering (ENG) applications in the mobile service     N/A  
[ 546 ]  
 
2013-12-04 WPs 5A and 5C   Liaison statement to Working Party 5C (copied to Joint Task Group 4-5-6-7) - Draft revision of Recommendation ITU-R F.1336-3 - Reference radiation patterns of omnidirectional, sectoral and other antennas     N/A  
[ 545 ]  
 
2013-12-03 WP 5B   Liaison statement to Study Group 6 (copy to Working Parties 4A, 4B, 4C, 5A, 5C, 5D and 6A) - Development of Question ITU-R 136-2/6 on Worldwide broadcasting roaming     136-2/6  
[ 544 ]  
 
2013-12-03 WP 5B   Liaison statement to Working Party 5D (copy for information to Working Party 4A) - Revision of Recommendations ITU-R M.1580-4 and ITU-R M.1581-4 and start of work towards - Two preliminary draft new Recommendations ITU-R M.[IMT.OOBE.X] on generic unwanted emission characteristics of base stations and mobile stations using the terrestrial radio interfaces of IMT-Advanced     N/A  
[ 543 ]  
 
2013-12-03 WP 5C   Liaison statement to Working Party 5A (copy for information to Working Party 5D) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     N/A  
[ 542 ]  
 
2013-12-03 WP 5C   Liaison statement to Working Parties 5A, 5D and ITU-T JCA-AHF - Working document towards a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems     N/A  
[ 541 ]  
 
2013-11-26 ITU-T SG 13   Liaison statement on WTSA-12 Resolution 38     N/A  
[ 540 ]  
 
2013-11-26 ITU-T SG 13   Liaison statement on Recommendation ITU-T Y.3022     N/A  
[ 539 ]  
 
2013-11-26 ITU-T SG 13   Liaison statement on work progress on development of a Handbook on "Global trends in IMT"     N/A  
[ 538 ]  
 
2013-11-26 ITU-T SG 13   Liaison statement on request for update the status about Recommendation ITU-R M.1457 (referencing of 3GPP Release 11)     N/A  
[ 537 ]  
 
2013-11-21 WP 6A   Liaison statement to Working Party 1A and ITU-T Study Groups 9 and 5 (and for information to ITU-R Working Parties 5A, 5B, 5C & 5D) - Coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU T J.195.1 (J.HINOC-REQ)     N/A  
[ 536 ]  
 
2013-11-05 Chairman, SG 5   Work on the Recommendation database search facility     N/A  
[ 535 ]  
 
2013-11-05 Chairman, SG 5   Updating of the progress of the studies requested in the ITU-R Resolutions     N/A  
[ 534 ]  
 
2013-10-22 SG 6   Question ITU-R 136-2/6     N/A  
[ 533 ]  
 
2013-10-18 Chairmen, WPs 3K and 3M   Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 6A and 5D for information)     N/A  
[ 532 ]  
+Ch.1-7 
2013-10-17 Chairman, WP 5D   Report on the seventeenth meeting of Working Party 5D (Geneva, 9 -16 October 2013)     N/A  
[ 531 ]  
 
2013-10-16 Director, BR   Final list of participants - Working Party 5D (Geneva, 9-16 October 2013)     N/A  
[ 530 ]  
 
2013-10-14 ITU Region 1 (ATU) Rapporteur   Update on recent activities within ATU     N/A  
Resultats:729 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2014-07-11