Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5B : Contributions : 62 Ajoutés récemment -  Recherche de documents de réunion
   
[62]  Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)

Format

Taille

Mise à disposition

English

Word  

70094 octets 2012-06-05 [62] Annex 32- List of documents issued - Documents 5B/810 - 5B/813 (carried forward from 2007-2012 study period) and Documents 5B/1 - 5B/60 (from the current 2012-2015 study period)

Word  

51514 octets 2012-07-02 [62] Annex 31 Revision 1- List of output documents (Documents 5B/TEMP/1-5B/TEMP/44)

Word  

3783593 octets 2012-06-05 [62] Annex 30- Liaison statement to the International Maritime Organization (IMO) - Revision of Recommendation ITU-R M.1371-4 - Technical characteristics for an automatic identification system using time-division multiple access in the VHF maritime mobile band

Word  

2524068 octets 2012-06-05 [62] Annex 29- Liaison statement to International Maritime Organization (IMO) and International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC)-15 - Agenda item 1.16

Word  

67912 octets 2012-06-05 [62] Annex 28- Liaison statement to ICAO - Use of satellite radio links for the control and non-payload communications of unmanned aircraft systems under WRC-15 Agenda item 1.5

Word  

187016 octets 2012-06-05 [62] Annex 27- Work Plan and milestones for consideration of Recommendation ITU-R M.493 "Digital selective-calling system for use in the maritime mobile service"

Word  

115698 octets 2012-06-28 [62] Annex 26 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[MAR-UMS] - Characteristics of unmanned maritime systems

Word  

1394747 octets 2012-06-28 [62] Annex 25 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[COM-ENVIRO] - Worldwide maritime radiocommunication plan

Word  

340196 octets 2012-06-28 [62] Annex 24 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Maritime survivor locating systems and devices (man overboard systems) - An overview of systems and their mode of operation

Word  

690122 octets 2012-06-28 [62] Annex 23 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[EXCHANGE-MARITIME-INFOS] - Near-real-time exchange of maritime domain information

Word  

130360 octets 2012-06-28 [62] Annex 22 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[WAIC BANDS] - Analysis of the aeronautical mobile (route), aeronautical mobile, and aeronautical radionavigation services to accommodate wireless avionics intra-communications

Word  

4784613 octets 2012-06-28 [62] Annex 21 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[WAIC_CHAR_SPEC] - Characteristics of WAIC systems and bandwidth requirements to support their safe operation

Word  

655017 octets 2012-06-05 [62] Annex 20- Working document towards a preliminary draft new Report ITU-R M.[AUTOMOTIVE RADARS] - Systems characteristics and compatibility of automotive radars operating in the 77.5-78 GHz band for sharing studies

Word  

80780 octets 2012-06-28 [62] Annex 19 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[UAS-FSS] - Studies to support the beyond line-of-sight command and non-payload communications mobile links for unmanned aerial systems in certain frequency bands allocated to the fixed-satel

Word  

4011380 octets 2012-06-28 [62] Annex 18 Revision 1- Preliminary draft new Report on compatibility of systems operating in the radionavigation-satellite service and radars in the frequency band 1 215-1 300 MHz

Word  

273752 octets 2012-06-28 [62] Annex 17 Revision 1- Preliminary draft new Recommendation - Operational and technical characteristics and protection criteria of radio altimeters utilizing the frequency band 4 200-4 400 MHz

Word  

11710773 octets 2012-06-28 [62] Annex 16 Revision 1- Working document towards a preliminary draft revision of Recommendation ITU-R M.1874 - Technical and operational characteristics of oceanographic radars operating in sub-bands within the frequency range 3-50 MHz

Word  

504767 octets 2012-06-28 [62] Annex 15 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1841 - Compatibility between FM sound-broadcasting systems in the frequency band of about 87-108 MHz and the aeronautical ground-based augmentation system in the frequency band 108-117.975 MHz

Word  

298793 octets 2012-06-28 [62] Annex 14 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1796-1 - Characteristics of and protection criteria for terrestrial radars operating in the radiodetermination service in the frequency band 8 500-10 680 MHz

Word  

57058 octets 2012-06-28 [62] Annex 13 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1176 - Technical parameters of radar target enhancers

Word  

55641 octets 2012-06-27 [62] Annex 12- This Annex is withdrawn - the draft revision of Recommendation ITU-R M.629 was sent to Study Group 5 (see Document 5/9)

Word  

95373 octets 2012-06-28 [62] Annex 11 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1463-1 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency band 1 215-1 400 MHz

Word  

64761 octets 2012-06-04 [62] Annex 10- Work plan for WRC-15 Agenda item 1.18

Word  

54941 octets 2012-07-02 [62] Annex 09 Revision 1- Working document towards draft CPM text - Chapter 3 - Agenda item 1.18

Word  

62681 octets 2012-06-04 [62] Annex 08- Workplan and milestones for WRC-15 Agenda item 1.17

Word  

43940 octets 2012-07-02 [62] Annex 07 Revision 1- Working document towards a draft CPM text - Chapter 3 - Aeronautical, Maritime and radiolocation issues - Agenda item 1.17

Word  

67874 octets 2012-06-04 [62] Annex 06- Draft workplan - Agenda item 1.16

Word  

64589 octets 2012-07-02 [62] Annex 05 Revision 1- Working document towards draft CPM text - Chapter 3 - Agenda item 1.16

Word  

50211 octets 2012-06-04 [62] Annex 04- Draft workplan - Agenda item 1.15

Word  

50123 octets 2012-07-02 [62] Annex 03 Revision 1- Working document towards draft CPM text - Chapter 3 - Aeronautical, Maritime and Radiolocalisation issues (Agenda items 1.5, 1.15, 1.16, 1.17, 1.18) - Agenda item 1.15

Word  

65165 octets 2012-06-01 [62] Annex 02- Working document on the work plan for FSS/UAS studies under WRC-15 Agenda item 1.5

Word  

44395 octets 2012-07-02 [62] Annex 01 Revision 1- Working document towards preliminary draft new CPM text - WRC-15 Agenda item 1.5 - Chapter 3

Word  

101327 octets 2012-06-28 [62] - Report on the ninth meeting of Working Party 5B (Geneva, 22 May - 1st June 2012)
 

Document :

UIT-R WP5B  Contribution  62

Titre :

Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)

Reçu le :

2012-06-01

Source :

Chairman, WP 5B

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2012-07-02