[289] Annex 16- Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A (copy to ITU-R WP 5B for information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect
to work on Recommendation ITU-T G.FAST
[289] Annex 08- Inclusion of an additional methodology into the draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY]-0 - Methodology to calculate spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)
for aeronautical mobile-satellite (R) service communications related to
the priority categories 1 to 6 of Article 44 of the Radio Regulations
[289] Annex 07- Working document towards a preliminary draft new Report ITU-R M.[MSS SHARE] - Sharing between GSO MSS and other services in the allocations in the 22-26 GHz range
[289] Annex 06- Preliminary draft new Report ITU-R M.[RNSS_MULTI_EESS] - Consideration of aggregate radio frequency interference (RFI) event
potentials from multiple EESS systems on RNSS receivers
operating in the 1 215-1 300 MHz frequency band
[289] Annex 04- Preliminary draft new report itu-r M.[MMSS 7/8 GHz Sharing - Possible allocations to the maritime mobile-satellite service in the 7/8 GHz range
[289] Annex 03- Preliminary draft new [Recommendation] [Report] ITU-R M.[MSS-RDSS-SHARE] - Determination of the impact on the fixed service based on the revision of the power flux-density coordination trigger levels in the 2 483.5-2 500 MHz band
[289] Annex 01- Preliminary draft revision of Recommendation ITU-R M.1478-2 - Protection criteria for Cospas-Sarsat search and rescue instruments in the band 406-406.1 MHz