Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1C : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1C  C 

UIT-R WP1C

Contrôle du Spectre

Resultats:174 documents
Résultats :  Précédent -  1 - 2 - 3 - 4
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 24 ]  
 
Human exposure to electromagnetic fields: Measurement and assessment     Israel (State of)     2012-05-29
[ 23 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[MAJOR_EVENTS] - Spectrum management and monitoring during major events     Chairman, CG on Major Events     2012-05-28
[ 22 ]  
 
Working document towards a preliminary draft new Report - Technologies on detection of weak signals     China (People's Republic of)   235/1   2012-05-24
[ 21 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals     China (People's Republic of)     2012-05-24
[ 20 ]  
 
Working document towards a preliminary draft new Report - Technologies on co-frequency signal separation     China (People's Republic of)     2012-05-24
[ 19 ]  
 
Working document towards a draft new Question - Timely and dynamic spectrum database     China (People's Republic of)     2012-05-24
[ 18 ]  
 
Working document towards a draft new Question - VHF/UHF Spectrum monitoring station planning     China (People's Republic of)     2012-05-24
[ 17 ]  
 
Working document towards a preliminary draft new Recommendation - Evolutionary spectrum monitoring system     China (People's Republic of)     2012-05-24
[ 16 ]  
 
Comments on working document towards a preliminary draft new Report - Spectrum occupancy     China (People's Republic of)     2012-05-24
[ 15 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1600 Technical identification of digital signals     United States of America     2012-05-21
[ 14 ]  
 
Working document towards a preliminary draft new Report: Overview of interference source detection and geolocation affecting the 406.0 - 406.1 MHz band used by emergency beacons     United States of America     2012-05-21
[ 13 ]  
 
Issues concerning Regular Monitoring in the HF band and the list of International Monitoring Stations (List VIII)     Director, BR     2012-05-18
[ 12 ]  
 
Working document towards a preliminary draft new Report - Spectrum occupancy     Chairman, CG Spectrum Occup.     2012-05-16
[ 11 ]  
 
Summary of the Results of RA-12 and CPM15-1     Chairman, SG 1     2012-05-15
[ 10 ]  
 
Preliminary draft new Recommendation ITU-R SM.[Doc. _ _ _ _] - Test procedure for measuring the DF accuracy     R0HDE & SCHWARZ GmbH & Co. KG     2012-05-15
[ 9 ]  
 
Revision of Recommendation ITU-R M.1177     Germany (Federal Republic of)     2012-05-10
[ 8 ]  
 
Draft revision of Recommendation ITU-R SM.1267 - Collection and publication of monitoring data to assist frequency assignment for geostationary satellite systems     Saudi Arabia (Kingdom of)     2012-05-09
[ 7 ]  
 
Liaison statement - Consent on new Recommendation ITU-T K.91 (K.guide)     ITU-T SG 5     2012-05-02
[ 6 ]  
 
Study Group 5 Question ITU-R 212-4/5 to be brought to the attention of Study Groups 1, 4 and 7     SG 5     2012-04-24
[ 5 ]  
 
WRC Resolutions and Recommendations related to the work of Study Group 1     Chairman, SG 1     2012-04-19
[ 4 ]  
 
Assignment of the Study Group 1 texts to the Working Parties     Chairman, SG 1     2012-04-19
[ 3 ]  
 
New Annex 4 to the working document towards a preliminary draft new Report ITU-R SM.[MAJOR_EVENTS] - Spectrum management and monitoring during major events     Germany (Federal Republic of)     2012-04-18
[ 2 ]  
 
Spectrum occupancy     Russian Federation     2012-03-02
[ 1 ]  
 
Documents to be carried over from the 2007-2011 study period     WP 1C     2012-01-26
Resultats:174 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2015-08-28