Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP4B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP4B  C 

UIT-R WP4B

Systèmes, interfaces radioélectriques, objectifs de qualité de fonctionnement et de disponibilité pour le SFS, le SRS et le SMS y compris les applications IP et le reportage d'actualités par satellite

Resultats:205 documents
Résultats :   -  1 - 2 - 3 - 4 - 5  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 180 ]  
 
Reply liaison statement to ITU-D Study Group 2 (copy to ITU-R Working Parties 4B and 4C)     WP 5C     2011-06-23
[ 179 ]  
 
Points of contact for satellite news gathering licensing     BR Study Group Department     2011-06-23
[ 178 ]  
 
Liaison statement to ITU-R Working Parties 4B and 5C - Question 26/2 - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects     ITU-D SG 2     2011-06-14
[ 177 ]  
 
Liaison statement (copy to WP 6B for information) - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services     WP 6A     2011-06-08
[ 176 ]  
 
Liaison statement to Working Party 4B - Proposal for modification of Recommendation ITU-R BO.789     WP 6A   60/6   2011-06-08
[ 175 ]  
 
Liaison statement to Working Party 4B - Working document towards a preliminary draft new Recommendation ITU-R F.[FDIRMETH] - Methodology for the calculation of aggregate reduction in throughput and definition of fractional degradation in effective information rate for satellite links including those employing Adaptive Coding and Modulation     WP 4A     2011-05-26
[ 174 ]  
 
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - Example of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links     WP 4A     2011-05-24
[ 173 ]  
 
ITU-R Study Group 5 Recommendation ITU-R M.1177-4 to be brought to the attention of Study Groups 1 and 4     BR Study Group Department     2011-05-18
[ 172 ]  
+Ann.1-11 
Report on the thirtieth meeting of Working Party 4B (Geneva, 2-6 May 2011)     Chairman, WP 4B (W)     2011-05-06
[ 171 ]  
 
Final List of Participants - Working Party 4B (Geneva, 2-6 May 2011)     Director, BR (W)     2011-05-06
[ 170 ]  
 
List of documents issued     BR Study Group Department     2011-04-29
[ 169 ]  
 
Satellite component of IMT     Chairman, WP 4C     2011-04-26
[ 168 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R M.[SATIMT_CIRCUL] - Global circulation of IMT-2000 satellite terminals     France     2011-04-25
[ 167 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R M.1850 - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)     Korea (Republic of)     2011-04-21
[ 166 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): SAT-OFDM     Korea (Republic of)     2011-04-21
[ 165 ]  
 
Liaison statement to ITU-D SG 2, ITU-T SG 13 and ITU-R WP 4B     WP 5D     2011-04-21
[ 164 ]  
 
Liaison statement to Working Party 4B - Plan to revise Recommendation ITU-R M.1579 for Global circulation of IMT-2000 terminals     WP 5D     2011-04-20
[ 163 ]  
 
Future work on the satellite component of IMT     Chairman, WP 4C     2011-04-14
[ 162 ]  
 
ITU-R Study Group 6 Recommendation ITU-R BT.1833-1 to be brought to the attention of Study Group 4     BR Study Group Department     2011-04-14
[ 161 ]  
 
Liaison statement to ITU-R Working Parties 4B and 4A     ITU-D SG 2     2011-03-28
[ 160 ]  
 
Liaison statement to ITU-R Working Parties 5D and 4B, ITU-T Question 13     ITU-D SG 2     2011-03-28
[ 159 ]  
 
Study Group 6 Question 128-1/6 to be brought to the attention of Study Group 4     BR Study Group Department     2011-03-25
[ 158 ]  
 
ITU-R Study Group 6 Report ITU-R BT.2049-4 to be brought to the attention of Study Group 4     BR Study Group Department     2011-03-11
[ 157 ]  
(Rev.1) 
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan     ITU-T SG 15     2011-03-08
[ 156 ]  
 
Liaison statement to Working Parties 4A and 4B - Examples of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links     WP 5B     2010-11-26
[ 155 ]  
 
Liaison statement to Working Party 4B - Proposed revisions of SNG series Recommendations     WP 6B     2010-11-15
[ 154 ]  
 
Liaison statement to Working Party 4B - Proposed editorial revision of Recommendation ITU-R BO.1130-4 - Systems for digital satellite broadcasting to vehicular, portable and fixed receivers in the bands allocated to BSS (sound) in the frequency range 1 400-2 700 MHz     WP 6B     2010-11-15
[ 153 ]  
 
Liaison statement to Working Party 4B - Proposed treatment of BO series of Recommendations and Reports     WP 6B     2010-11-15
[ 152 ]  
 
Liaison statement to Working Party 4C (for information to Working Parties 4A, 4B, 5A, 5D and 6B) - Preliminary draft new Report ITU-R M.[SAT-IMT-ADVANCED], titled "Vision and requirements for the satellite radio interface(S) of IMT-Advanced"     WP 6A     2010-11-05
[ 151 ]  
 
Possible review of Recommendation ITU-R BO.600 - Standardized set of test conditions and measurement procedures for the subjective and objective determination of protection ratios for television in the terrestrial broadcasting and the broadcasting-satellite services     Australia     2010-10-11
[ 150 ]  
 
Note from the Chairman of Study Group 4 to the Chairmen of Study Group 5 and Working Party 5D (copy to Working Parties 4B and 4C) - Satellite component of IMT     SG 4     2010-09-13
[ 149 ]  
 
Liaison statement to Working Party 4B - Former Working Party 6S Questions jointly attributed to Working Parties 4A and 4B and not yet incorporates into Study Group 4     WP 4A     2010-07-26
[ 148 ]  
+Ann.1-11 
Report on the twenty ninth meeting of Working Party 4B (Geneva, 5 - 9 July 2010)     Chairman, WP 4B     2010-07-08
[ 147 ]  
(Rev.1) 
Final List of participants - Working Party 4B (Geneva, 5-9 July 2010)     Director, BR     2010-07-09
[ 146 ]  
 
Liaison statement to Working Parties 4A, 4B, 6A, 6B, 6C - Activities on satellite radio interface technology of IMT-ADVANCED     WP 4C     2010-07-08
[ 145 ]  
 
List of documents issued     BR Study Group Department     2010-07-02
[ 144 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of Radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment     WP 1A     2010-06-29
[ 143 ]  
 
Preliminary draft new Report ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems     Canada , Korea (Republic of)   46-3/4, 73-2/4   2010-06-25
[ 142 ]  
 
Proposed liaison statement to Working Party 6B - Broadcasting of multimedia and data applications for mobile reception     France     2010-06-27
[ 141 ]  
 
Comments on liaison statement from Working Party 6B on proposed revisions of SNG series Recommendations     Japan     2010-06-21
[ 140 ]  
 
Preliminary draft new Report ITU-R S.[IPQOS-RPT] - Quality of service (QoS) architectures, mechanisms and their provisioning in IP-based satellite networks     Japan   263-1/4   2010-06-21
[ 139 ]  
 
Draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems     Canada , Korea (Republic of)   73-2/4, 46-3/4   2010-06-21
[ 138 ]  
 
Proposed modification to working document - Terminology used for networks using both satellite and terrestrial links     Korea (Republic of)     2010-06-21
[ 137 ]  
 
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan     ITU-T SG 15     2010-06-22
[ 136 ]  
 
Liaison statement - Consent of Recommendation G.9971 "Requirements of transport functions in IP home networks"     ITU-T SG 15     2010-06-22
[ 135 ]  
 
Liaison statement to Working Party 4B on the treatment of BO Series Recommendations (copy to Working Party 4A for information) - Response to comments on the proposed treatment of Recommendation of former Working Party 6S     WP 6B     2010-05-20
[ 134 ]  
 
Liaison statement to Working Party 4B on the PDRR ITU-R BO.789-2 (copy to Working Party 4A for information) - Proposed revisions to the working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service requirements for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency...     WP 6B   23/6   2010-05-20
[ 133 ]  
 
Liaison statement to Working Party 4B - Broadcasting of multimedia and data applications for mobile reception     WP 6B     2010-05-20
[ 132 ]  
 
Liaison statement to Working Party 4B on proposed revisions of SNG Series Recommendations     WP 6B     2010-05-20
[ 131 ]  
 
Liaison statement to Study Group 6 (copy to Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/terrestrial system"     Chairman, CCV     2010-05-13
Resultats:205 documents
Résultats :   -  1 - 2 - 3 - 4 - 5  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2011-04-26