Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 307 ]
|
Further studies on global broadband Internet access via FSS systems
|
United Kingdom of Great Britain and Northern Ireland
|
|
2006-03-15 |
|
[ 306 ]
|
Coordination between terrestrial stations and typical Earth stations in frequency bands of Appendix 30B
|
Russian Federation
|
|
2006-03-14 |
|
[ 305 ]
|
Revision of Annex 4 to Appendix 30B (Protection criteria)
|
AsiaSat
|
|
2006-03-15 |
|
[ 304 ]
|
Impact on FSS receive Earth stations of Broadband Wireless Access systems and future IMT Systems in the 3.5 GHz range
|
AsiaSat
|
|
2006-03-15 |
|
[ 303 ]
|
Revision of technical parameters of Appendix 30B - (Annex 1 and the Plan)
|
AsiaSat
|
|
2006-03-15 |
|
[ 302 ]
|
Preliminary draft revision of Recommendation ITU-R S.727-1 - Cross-polarization isolation from very small aperture terminals (VSATs)
|
Brazil (Federative Republic of)
|
|
2006-03-14 |
|
[ 301 ]
|
Permanent discontinuity of the use of assignments in appendix 30B
|
Director, BR
|
|
2006-03-14 |
|
[ 300 ]
|
Draft CPM text in response to WRC-07 agenda item 1.10
|
Director, BR
|
|
2006-03-14 |
|
[ 299 ]
|
Liaison statement to WP 7D (Copy to WP 4A for information) - Proposed corrections on Recommendations ITU-R S.1586 and ITU-R M.1583
|
WP 8D
|
236/4
|
2006-03-14 |
|
[ 298 ]
|
Draft liaison statement to Working Party Task Group 1/9 - Proposed draft CPM text for WRC-07 Agenda item 1.20 (Resolution 738 (WRC-03), 30-31 and 50.4-51.4 GHz)
|
United States of America
|
|
2006-03-10 |
|
[ 297 ]
|
Preliminary draft revision of Recommendation ITU-R S.742-1 based on the reviews of generalized A, B, C, D parameters in the Appendix 30B
|
Korea (Republic of)
|
|
2006-03-13 |
|
[ 296 ]
|
Earth station matters under consideration by WP 4A
|
United States of America
|
|
2006-03-10 |
|
[ 295 ]
|
Draft reply to liaison statement from Working Party 1A - Bands between 275 and 3 000 GHz
|
United States of America
|
|
2006-03-10 |
|
[ 294 ]
|
Proposed Annex for working document toward preliminary draft new Recommendation on - Possibilities for global broadband Internet access by FSS systems
|
United States of America
|
269/4
|
2006-03-10 |
|
[ 293 ]
|
Sharing considerations between the fixed satellite service and other services in the Band 5091 - 5250 MHz
|
United States of America
|
|
2006-03-10 |
|
[ 292 ]
|
Working document toward CPM text regarding Agenda item 1.12 - Coordination distances for cases involving ground-based Earth stations and aircraft terrestrial stations
|
United States of America
|
|
2006-03-10 |
|
[ 291 ]
|
Working document on potential interference to neighboring satellites resulting from off-axis EIRP emissions subject to motion induced antenna pointing errors
|
United States of America
|
269/4
|
2006-03-10 |
|
[ 290 ]
|
Preliminary draft new Recommendatino ITU-R S.[SHARING_BI-DIRECT_UBIQ]
|
United States of America
|
|
2006-03-10 |
|
[ 289 ]
|
Draft response to Liaison statement from WP 7B - Proposed draft CPM text for WRC-07 Agenda item 1.2 (Resolution 746 (WRC-03), 18 GHz)
|
United States of America
|
|
2006-03-09 |
|
[ 288 ]
|
Draft liaison statement to TG 1/9
|
United States of America
|
|
2006-03-09 |
|
[ 287 ]
|
Draft letter to the Director of the BR concerning the definition of HEO
|
United States of America
|
|
2006-03-09 |
|
[ 286 ]
|
Comments on draft CPM text produced by the Working Party of the Special Committee on Regulatory/Procedural matters
|
United States of America
|
|
2006-03-09 |
|
[ 285 ]
|
Proposal for draft revision of Recommendation ITU-R S.1713 - "Methodology to calculate the minimum separation angle at the Earth's surface between a non-geostationary satellite in a HEO "active" arc and a geostationary satellite"
|
Japan
|
241/4
|
2006-03-09 |
|
[ 284 ]
|
Requested course of action when revising existing Recommendations, developing new Recommendations or new Reports
|
SG 4 Rapporteur on vocabulary
|
|
2006-03-09 |
|
[ 283 ]
|
Impact of a proposed pfd mask on the design and operation of HIO FSS systems
|
Japan
|
|
2006-03-07 |
|
[ 282 ]
|
ABU Views on WRC-07 Agenda item 1.21
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2006-02-28 |
|
[ 281 ]
|
Liaison Statement to WP 4A - Frequency-related matters for IMT-2000 and IMT-Advanced related to WRC-07 Agenda item 1.4
|
WP 8F
|
|
2006-02-24 |
|
[ 280 ]
|
Liaison statement to 4A, 4B, 4-9S, 6S, 7B, 7C, 7D - NGN and satellite work; and intersector coordination group on satellite (ICG-SAT) matters
|
ITU-T Study Group 13
|
ITU-T, 10/13
|
2006-02-07 |
|
[ 279 ]
|
Liaison statement to contributing Working Parties 6E, 8A, 8D and interested Working Parties 3K, 4A, 6S, 7B, 7C and 9D - Frequency-related matters for IMT-2000 and IMT-Advanced related to WRC-07 Agenda item 1.4
|
WP 8F
|
|
2006-02-06 |
|
[ 278 ]
|
Liaison statement to Working Parties 4A, 6S and 8D
|
SC-WP
|
|
2006-01-24 |
|
[ 277 ]
|
Liaison statement to Working Party 4A - Draft CPM Text in response to WRC-07 Agenda item 1.10 (Review of Appendix 30B)
|
SC-WP
|
|
2006-01-24 |
|
[ 276 ]
|
Liaison statement to Working Parties 4A and 4-9S
|
SC-WP
|
|
2006-01-24 |
|
[ 275 ]
|
Liaison statement to Working Parties 4A and 8B
|
WP-SC
|
|
2006-01-23 |
|
[ 274 ]
|
Liaison statement to Working Parties 4A and 6S
|
SC-WP
|
|
2006-01-23 |
|
[ 273 ]
|
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336
|
WP 9D
|
|
2005-12-21 |
|
[ 272 ]
(Rev.1) |
Liaison statement to WP 4A - Steps that may be taken for frequency sharing between bidirectional FSS networks comprising ubiquitously deployed earth stations
|
WP 4-9S
|
|
2005-12-02 |
|
[ 271 ]
|
Agenda item 1.10 - WRC-07
|
Syrian Arab Republic
|
|
2005-11-25 |
|
[ 270 ]
|
Liaison statement to the Working Party of the Special Committee and to Working Party 4A for information - WRC-07 Agenda item 1.12 - Footnote 5.538
|
WP 4-9S
|
|
2005-11-23 |
|
[ 269 ]
|
Liaison statement to Working Parties 4A and 8D - Proposed corrections on two Recommendations ITU-R S.1586 and ITU-R M.1583
|
WP 7D
|
236/4
|
2005-11-21 |
|
[ 268 ]
|
Liaison statement to WPs 4A and 9D - Request for information relating to the use of sea surface temperature measurements taken in the 6-7 GHz band for disaster monitoring and forecasting
|
WP 7C
|
|
2005-11-18 |
|
[ 267 ]
+Ann.1-32 |
Chairman's report - 7-16 November meeting
|
Chairman, WP 4A
|
|
2005-11-17 |
|
[ 266 ]
|
Final List of Participants - Working Party 4A
|
Director, BR
|
|
2005-11-15 |
|
[ 265 ]
|
Liaison statement to WP 4A - Proposed draft CPM text for WRC-07 Agenda item 1.2 (Resolution 746 (WRC-03), 18 GHz)
|
WP 7B
|
|
2005-11-14 |
|
[ 264 ]
(Rev.1) |
This document has been withdrawn
|
WP 4B
|
270/4
|
2005-11-09 |
|
[ 263 ]
(Rev.1) |
Liaison statement to WP 4A - Characteristics of fixed-satellite service systems using wideband spreading signals
|
WP 4B
|
|
2005-11-08 |
|
[ 262 ]
|
Liaison statement to Working Party 4A - Proposed draft revision to Recommendation ITU-R S.1001
|
WP 4B
|
|
2005-11-08 |
|
[ 261 ]
|
Liaison statement to WP 4A - Apportionment of the allowable error perfomance degradations to fixed-satellite service (FSS) hypothetical reference digital paths (HRDP) arising from time invariant interference
|
WP 4B
|
|
2005-11-08 |
|
[ 260 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-11-04 |
|
[ 259 ]
|
Report on the second meeting of CCV
|
SG 4 Rapporteur on Vocabulary
|
|
2005-11-02 |
|
[ 258 ]
|
Impact on the AP30B plan introducing the coordination Arc concept and discussion of the protection criteria
|
Swedish Space Corporation
|
|
2005-11-01 |
Resultats:432 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):