Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 60 ]
(Rev.1) |
Report on the activities of ITU-T Study Group 13
|
EUTELSAT
|
|
2001-10-01 |
|
[ 59 ]
(Rev.1) |
Responses to Circular letter CA/99
|
BR Secretariat
|
|
2001-10-01 |
|
[ 58 ]
(Rev.1) |
Background briefing on secure timestamps
|
EUTELSAT
|
|
2001-10-01 |
|
[ 57 ]
(Rev.1) |
Progress on the revision of Recommendation ITU-R S.579 on availability
|
EUTELSAT
|
|
2001-10-01 |
|
[ 56 ]
(Rev.1) |
Comments in responses to Circular Letter CAR/109
|
BR Secretariat
|
|
2001-10-01 |
|
[ 55 ]
(Rev.1) |
Updating of certain maintained S-series and SNG-series Recommendations
|
BR Secretariat
|
|
2001-10-01 |
|
[ 54 ]
(Rev.1) |
Liaison statement - Reply to concerns relating to the E-model
|
ITU-T SG 12 (Rapporteur Q.8/12)
|
|
2001-10-01 |
|
[ 53 ]
(Rev.1) |
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 52 ]
(Rev.1) |
IP packet transfer delay in ITU-T Recommendation Y.1541
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 51 ]
(Rev.1) |
Draft revised Recomendation I.358 - Call processing performance for switched virtual channel connections (VCCs) in a B-ISDN
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 50 ]
(Rev.1) |
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 49 ]
(Rev.1) |
Rapport du Président sur la réunion du Groupe de travail 4SNG
|
Ch. WP 4SNG
|
|
2001-10-01 |
|
[ 48 ]
(Rev.1) |
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths
|
Wp 3J & 3M
|
|
2001-10-01 |
|
[ 47 ]
(Rev.1) |
Liaison statement to Workin Party 4B - Activities within Q.13/SG 13
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 46 ]
(Rev.1) |
Liaison statement to ITU-R Working Party 4B - Interoperability of satellite and terrestrial networks
|
WP 8D
|
|
2001-10-01 |
|
[ 45 ]
(Rev.1) |
Report of the thirteenth meeting of Working Party 4B (Seattle, Washington, USA, 18-24 April 2001)
|
Ch. WP 4B
|
|
2001-10-01 |
|
[ 44 ]
(Rev.1) |
Liaison statement to ITU-T Study Group 13 - Discussion on relation between physical layer, IP, ATM parameters
|
WP 9A
|
|
2001-10-01 |
|
[ 43 ]
(Rev.1) |
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 42 ]
(Rev.1) |
Working document towards a draft new Recommendation onTCP performance over ATM based satellite network
|
Korea
|
|
2001-10-01 |
|
[ 41 ]
(Rev.1) |
Working document towards a draft new Recommendation on TT&C performance characteristics
|
USA
|
|
2001-10-01 |
|
[ 40 ]
(Rev.1) |
An analysis of the impact of implementing dynamic channel assignment (DCA) in FSS systems in response to a liaison statement from Working Party 4-9S
|
USA
|
|
2001-10-01 |
|
[ 39 ]
(Rev.1) |
Report on ITU-T SG 15 activities
|
EUTELSAT
|
|
2001-10-01 |
|
[ 38 ]
(Rev.1) |
Working document towards a preliminary draft new recommendation - Impact of FSS performance objectives and delay on the transmission of TCP/IP over satellites
|
INTELSAT
|
|
2001-10-01 |
|
[ 37 ]
(Rev.1) |
Working document towards a preliminary draft new Recommendation - Spectrum requirements below 17 GHz for telemetry, tracking and command of FSS satellites operating with service links above 17GHz
|
INTELSAT
|
|
2001-10-01 |
|
[ 36 ]
(Rev.1) |
Report of last ITU-T SG 13 meeting in November 2000
|
EUTELSAT
|
|
2001-10-01 |
|
[ 35 ]
(Rev.1) |
Liaison statement to Working Parties 4A and 4B - The percentage of time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service.....
|
WP 4-9S
|
|
2001-10-01 |
|
[ 34 ]
(Rev.1) |
What can be done to ensure that Internet Protocols evolve in ways which avoid problems in the use of satellite connections?
|
United Kingdom
|
|
2001-10-01 |
|
[ 33 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 4B, 9A and 9B - Fixed service and fixed-satellite service parameters and characteristics in the 38 GHz and 40 GHz bands to be considered under agenda item 1.32 (WRC-03)
|
WP 4-9S
|
|
2001-10-01 |
|
[ 32 ]
(Rev.1) |
Report of ITU-T Study Group 12 Meeting - Geneva 19-23 February 2001
|
ITU-T Rapporteur
|
|
2001-10-01 |
|
[ 31 ]
(Rev.1) |
Comparison of a satellite path availability when designed to Recommendation ITU-R S.579-5 with terrestrial path availability when designed to Recommendation ITU-R G.827 as revised in 2000
|
EUTELSAT
|
|
2001-10-01 |
|
[ 30 ]
(Rev.1) |
Draft revision of Recommendation ITU-R S.579-4 - Availability objectives for hypothetical reference circuits and hypothetical reference digital paths in the fixed-satellite service
|
EUTELSAT
|
|
2001-10-01 |
|
[ 29 ]
(Rev.1) |
Working Document towards a draft new Recommendation on TT&C performance characteristics
|
USA
|
|
2001-10-01 |
|
[ 28 ]
(Rev.1) |
Liaison statement to Working Party 4B - Work on interaction between SPNEs and network breaks
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 27 ]
(Rev.1) |
Liaison statement to Working Parties 4B and 9B and to Joint Rapporteur Group 8A-9B - Revised versions of the access network transport (ANT) standardization plan (issue 4) and work plan (issue#)
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 26 ]
(Rev.1) |
Liaison statement to ITU-R Working Party 4B - Information of a new Recommendation G.IPCME
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 25 ]
(Rev.1) |
Liaison statement to ITU-T Study Group 4 (Q.3/4, SG 11 (Q.BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B
|
ITU-T SG 13 (Q. 6/13)
|
|
2001-10-01 |
|
[ 24 ]
(Rev.1) |
Liaison statement - Progress on Recommendations on availability of the physical layer
|
ITU-T SG 13 (Q. 15/13)
|
|
2001-10-01 |
|
[ 23 ]
(Rev.1) |
Liaison statement- Consequences of the introduction of OTN for synchronization distribution via STM-N
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 22 ]
(Rev.1) |
Report of the twelfth meeting of Working Party 4B - (Geneva, Switzerland, 20-26 September 2000)
|
Ch. WP 4B
|
|
2001-10-01 |
|
[ 21 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 4B, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C, and 9D - Four Draft Recommendations on unwanted emissions and new definitions
|
SG 1
|
|
2001-10-01 |
|
[ 20 ]
(Rev.1) |
Liaison statement to Working Party 4B - Response to WP 4B's proposed modification to Recommendation ITU-R S.1323
|
WP 4A
|
|
2001-10-01 |
|
[ 19 ]
(Rev.1) |
Draft liaison to ITU-T SG 13 on the progress of new Recommendation Y.1231
|
WP 4B
|
|
2001-10-01 |
|
[ 18 ]
(Rev.1) |
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 17 ]
(Rev.1) |
Working Document towards a draft new Recommendation - Achieving quality of service (QoS) for transmission control protocol TCP traffic in satellite networks with differentiated services
|
USA
|
|
2001-10-01 |
|
[ 16 ]
(Rev.1) |
Draft new Recommendation - Considerations for hypothetical reference digital paths when implemented for providing services whose availability are sensitive to synchronisation timing recovery
|
USA
|
|
2001-10-01 |
|
[ 15 ]
(Rev.1) |
Review of WP 4B Questions for cadidates for the provisional alternate approval procedure (AAP)
|
USA
|
|
2001-10-01 |
|
[ 14 ]
(Rev.1) |
Draft liaison statement to ITU-R Study Group 13 on progress of new Recommendations Y.1540 and Y.1541
|
EUTELSAT
|
|
2001-10-01 |
|
[ 13 ]
(Rev.1) |
Chairman, Radiocommunication Study Group 4
|
Ch. SG 4
|
|
2001-10-01 |
|
[ 12 ]
(Rev.1) |
Report of rapporteur on IP matters
|
EUTELSAT
|
|
2001-10-01 |
|
[ 11 ]
(Rev.1) |
QoS activities survey
|
EUTELSAT
|
|
2001-10-01 |
Resultats:135 documents Résultats :
Précédent -
1 -
2 -
3
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):