Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : SG01 : Circulaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R SG01  CIR 

UIT-R SG01

Gestion du spectre

Resultats:63 documents
Résultats :  1 - 2  - Suivant Next
Circulaires
 
Numéro 
Titre Source Date
[ 111 ]  
 
Meetings of Working Parties 1A, 1B and 1C (Geneva, 12-19 June 2024)     Director, BR   2024-02-08
[ 110 ]  
+Corr.1 
Meetings of Working Parties 1A, 1B and 1C (Thessaloniki, Greece, 29 May - 2 June 2023)     Director, BR   2023-01-30
[ 109 ]  
 
Meetings of Working Parties 1A, 1B and 1C (Geneva, 28 June - 7 July 2022)     BR, Director   2022-02-07
[ 108 ]  
 
Meetings of Working Parties 1A, 1B and 1C (e-Meeting, 3-12 November 2021)     BR, Director   2021-07-27
[ 107 ]  
 
Meetings of Working Parties 1A, 1B and 1C (e-Meeting, 25 May - 2 June 2021)     BR, Director   2021-02-01
[ 106 ]  
+Corr.1 
Meetings of Working Parties 1A, 1B and 1C (e-meeting, 24 November - 2 December 2020)     BR, Director   2020-07-21
[ 105 ]  
+Corr.1 
Meetings of Working Parties 1A, 1B and 1C (29 May - 5 June 2020), postponed until 24 November to 2 December 2020     BR, Director   2020-01-29
[ 104 ]  
 
Meetings of Working Parties 1A, 1B and 1C (28 May - 5 June 2019)     Director, BR   2019-02-04
[ 103 ]  
 
Meeting of Working Party 1B - Spectrum management methodologies and economic strategies (Geneva, 16-20 November 2018)     Director, BR   2018-07-26
[ 102 ]  
 
Meetings of Working Parties 1A, 1B and 1C (4-12 June 2018)     Director, BR   2018-01-19
[ 101 ]  
 
Meetings of Working Parties 1A and 1B (23 - 30 November 2017)     Director, BR   2017-07-25
[ 100 ]  
+Add.1 
Meetings of Working Partes 1A, 1B and 1C (Geneva, 13-20 June 2017)     Directeur, BR   2017-02-10
[ 99 ]  
 
Questionnaire prepared by ITU-R Working Party 1B relating to the operation of ubiquitously deployed earth station terminals in the context of studies under WRC-19 agenda item 9.1, issue 9.1.7     Director, BR   2016-12-14
[ 98 ]  
 
Meetings of Working Parties 1A and 1B and of the Working Party 1A Rapporteur Group on Wireless Power Transmission (22 - 30 November 2016)     Director, BR   2016-07-15
[ 97 ]  
 
Meetings of Working Parties 1A, 1B and 1C (2-9 June 2016)     Director, BR   2016-01-26
[ 96 ]  
 
Meetings of Working Parties 1A, 1B and 1C (3-10 June 2015)     Director, BR   2015-02-06
[ 95 ]  
 
Meetings of Working Parties 1A, 1B and 1C - Geneva, from 3 to 11 June 2014     Director, BR   2014-01-30
[ 94 ]  
 
Meetings of Working Party 1B and of the Working Party 1A Rapporteur Group on the revision of the CAT Handbook (20-28 January 2014)     Director, BR   2013-09-10
[ 93 ]  
+Corr.1 
Meetings of Working Parties 1A, 1B and 1C - Geneva, from 4 to 11 June 2013     Director, BR   2013-01-17
[ 92 ]  
 
Meetings of Working Parties 1A, 1B and 1C - Geneva, from 6 to 13 June 2012     Director, BR   2012-02-10
[ 91 ]  
 
Proposition d'adoption par correcspondance d'un projet de nouvelle Recommandation     SG 1   2011-06-10
[ 90 ]  
 
Meetings of Working Parties 1A, 1B and 1C, Geneva, from 25 May to 1 June 2011     Director, BR   2011-01-19
[ 89 ]  
 
Meeting of Working Party 1C - Spectrum monitoring (20-24 September 2010)     Director, BR   2010-05-07
[ 88 ]  
 
Working Party 1C activities on the review of international monitoring information related to emissions from terrestrial stations in the HF bands     WP 1C   2010-04-01
[ 87 ]  
 
Meetings of Working Parties 1A and 1B (21-28 June 2010)     Director, BR   2010-03-01
[ 86 ]  
 
Proposition d'adoption par correspondance d'un projet de nouvelle Recommandation et d'un projet de Recommandation révisée - Proposition de suppression d'une Recommandation     SG 1   2009-10-23
[ 85 ]  
 
Meetings of Working Parties 1A and 1B and associated meeting of the WP 1C Rapporteur Group on SMH issues     Director, BR   2009-10-12
[ 84 ]  
 
Meetings of Working Parties 1A, 1B and 1C (16-23 September 2009)     Director, BR   2009-04-15
[ 83 ]  
 
Meetings of Working Parties 1A and 1B and associated meetings of WP 1B and WP 1C Rapporteur Groups     Director BR   2008-09-09
[ 82 ]  
 
Proposed adoption by correspondence of 1 draft revised Recommendation     SG 1   2008-07-01
[ 81 ]  
 
Meetings of Working Parties 1A, 1B and 1C in conjunction with a meeting of Radiocommunication Study Group 1     Director, BR   2008-01-30
[ 80 ]  
 
Commission d'études 1 des radiocommunications - Proposition d'adoption par correspondance de 5 projets de nouvelle Recommandation     SG 1   2007-06-21
[ 79 ]  
 
Meetings of Working Parties 1A, 1B and 1C in conjunction with a meeting of Radiocommunication Study Group 1     Director, BR   2007-01-30
[ 78 ]  
 
Commission d'études 1 des radiocommunications - Proposition d'adoption par correspondance d'un projet de nouvelle Recommandation et d'un projet de Recommandation révisée     SG 1   2006-11-02
[ 77 ]  
 
Meetings for Working Parties 1A, 1B and 1C - Munich, 9-13 October 2006     BR, Director   2006-06-29
[ 76 ]  
 
Fifth meeting of Task Group 1/9 on compatibility between passive and active services     SG 1   2006-05-17
[ 75 ]  
 
Meeting of the WP 1C Rapporteur Group - Report on "Technical Specifications Receiver for Spectrum Monitoring"     SG 1   2006-01-11
[ 74 ]  
 
Fourth meeting of Task Group 1/9 on comopatibility between passive and active services     SG 1   2006-01-11
[ 73 ]  
 
Proposition d'adoption par correspondance de 7 projets de nouvelle Recommandation et de 4 projets de Recommandation révisée - Proposition de suppression d'une Recommandation     SG 1   2005-11-08
[ 72 ]  
 
Meetings of Working Parties 1A, 1B and 1C - Geneva, 26-30 September 2005     SG 1   2005-07-12
[ 71 ]  
 
Sixth meeting of Task Group 1/8 on compatibility between ultra-wideband devices (UWB) and radiocommunication services     SG 1   2005-06-13
[ 70 ]  
 
Third meeting of Task Group 1/9 on compatibility between passive and active services     SG 1   2005-06-08
[ 69 ]  
 
Meeting of Study Group 1 Handbook Group on National Spectrum Management     SG 1   2005-01-14
[ 68 ]  
 
Proposition d'adoption par correspondance d'un projet de Recommandation révisée élaboré par la Commission d'études 1 des radiocommunications     SG 1   2004-12-06
[ 67 ]  
 
Second meeting of SG 1 Rapporteur Group to revise the Handbook on Computer-Aided techniques for Spectrum Management     SG 1   2004-11-12
[ 66 ]  
 
Cinquième réunion du Groupe d'action 1/8 sur la compatibilité entre dispositifs à bande ultralarge (UWB) et services de radiocommunication     SG 1   2004-11-12
[ 65 ]  
 
Seconde réunion du Groupe d'action 1/9 sur la compatibilité entre différents services actifs et passifs     SG 1   2004-11-12
[ 64 ]  
+Add.1 
Adoption d'un projet de nouvelle Recommandation et d'un projet de Recommendation révisée par la Commission d'études 1 conformément au § 10.2.3 de la Résolution UIT-R 1-4 (Adoption par une Commission d'études par correspondance)     SG 1   2004-10-21
[ 63 ]  
 
Quatrième réunion du Groupe d'action 1/8 de la Commission d'études 1 des radiocommunications     SG 1   2004-08-11
[ 62 ]  
 
Réunions des Groupes de travail 1A, 1B et 1C en relation avec une réunion de la Commission d'études 1 des radiocommunications     SG 1   2004-07-05
Resultats:63 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2024-02-23