Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : SG01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R SG01  C 

UIT-R SG01

Gestion du spectre

Resultats:104 documents
Résultats :  Précédent -  1 - 2 - 3  -  Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 29 ]  
 
Liaison statement to Working Parties 4A, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C and TG 6/6 - Rapporteur's Group on WRC-03 agenda item 1.8.1 - Spurious domain boundary     TG 1/5     2001-11-14
[ 28 ]  
 
Draft liaison statement to Study Groups 4, 6, 7, 8 and 9 - Proposals for reviewing the definitions of the spectral properties of transmitter emissions     WP 1A     2001-11-14
[ 27 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[OAB] - Unwanted emissions in the out-of-band domain falling into adjacent allocated bands     TG 1/5     2001-11-14
[ 26 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[Boundary] - Variation of the boundary between the out-of-band and spurious domains required for the application of Recommendations ITU-R SM.329 and ITU-R SM.[OOB]     TG 1/5     2001-11-14
[ 25 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM. 329-8 - Spurious emissions     TG 1/5     2001-11-14
[ 24 ]  
 
Executive Report form Working Party 1B     Chairman, WP 1B     2001-11-14
[ 23 ]  
 
Liaison statement to Working Parties 4A, 6S, 7C, 7D and 8D concerning a working document towards a methodology for the interference analysis between transmitters and the passive service operating in different bands     TG 1/5     2001-11-14
[ 22 ]  
 
Liaison statement of Working Party 1B to Joint Task Group 1-6-8-9 and Working Parties 6M, 6E, 8A, 8F, 9B and JRG 8A-9B     WP 1B     2001-11-14
[ 21 ]  
 
Projet de modification du Rapport UIT-R SM.2012-1 - Aspects économiques de la gestion du spectre     WP 1B     2001-11-14
[ 20 ]  
 
Proposal to revise the Handbook on national spectrum management     Chairman, SG 1     2001-11-14
[ 19 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[DOC.1/19] - Technical operating parameters and spectrum requirements for short-range radiocommunication devices     WP 1A     2001-11-14
[ 18 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM. [Doc.1/18] Automationand integration of spectrum monitoring systems with automated spectrum management     WP 1C     2001-11-14
[ 17 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[Doc. 1/17] - Frequency channel occupancy measurements     WP 1C     2001-11-14
[ 16 ]  
 
Questions, Resolutions, Recommendations and Opinions of WP 1A and WP 1B     WPs 1A & 1B     2001-11-14
[ 15 ]  
 
Progress Report of the first meeting of JTG 1-6-8-9     JTG 1-6-8-9     2001-11-14
[ 14 ]  
(Rev.1) 
Draft new Report - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems     TG 1/5     2001-11-14
[ 13 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[SAF] - The protection of safety services from unwanted emissions     TG 1/5     2001-11-14
[ 12 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1370 - Design guidelines for developing advanced automated spectrum management systems (ASMS)     WP 1A     2001-11-14
[ 11 ]  
(Rev.1) 
Draft modification of Recommendation ITU-R SM. 1265 - Alternative allocation methods     WP 1A     2001-11-14
[ 10 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM. 1047 - National Spectrum Management     WP 1A     2001-11-14
[ 9 ]  
 
Draft new Question ITU-R [Doc.1/9] - Technical convergence with respect to terrestrial, fixed, mobile and broadcasting interactive multimedia applications and the associated regulatory environment     WP 1B     2001-11-14
[ 8 ]  
 
Draft new Question ITU-R [DOC. 1/8] - Guidance on the regulatory framework for national spectrum managment     WP 1B     2001-11-14
[ 7 ]  
 
Charging for the spectrum     ITU-D SG 1     2001-11-14
[ 6 ]  
+Add.1 
WTDC-98 Resolution 9 : Draft report     Co-Chairmen, Joint Gp on Res. 9     2001-11-14
[ 5 ]  
 
Liaison statement to Working Party 6S - Coordination between transmitting terrestrial stations and broadcasting-satellite service earth stations in non-planned BSS bands     WP 9D     2001-11-14
[ 4 ]  
 
Evaluation of Questions for the application of the alternative approval process     USA     2001-11-14
[ 3 ]  
 
Liaison statement to ITU-R Study Group 1 and Working Parties 6M, 6E, 7E, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems     JTG 1-6-8-9     2001-11-14
[ 2 ]  
 
Rapport de la réunion de la Commission d'études 1 de l'UIT-R (Assen, 25 et 26 août 1999)     Chairman, SG 1     2001-11-14
[ 1 ]  
+Add.1-2 
Questions assignées à la Commission d'études 1 par l'Assemblée des radiocommunications     SG 1     2001-11-14
Resultats:104 documents
Résultats :  Précédent -  1 - 2 - 3  -  Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2003-04-28