Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 309 ]
|
Power flux-density limits to protect the fixed service from HEO FSS satellites emissions in the 4, 11 and 18 GHz bands
|
France
|
|
2003-03-26 |
|
[ 308 ]
|
Working document on maximum allowable values of power flux-density at the surface of the earth produced by non-geostationary satellites in the Fixed-Satellite Service using highly elliptical orbits and operating in the 3 700-4 200 MHz and 10.7-12.7 GHz bands shared with the Fixed Service
|
United States of America
|
|
2003-03-18 |
|
[ 307 ]
|
Report of the WP 4-9S Correspondence Group on HEO
|
Coordinator, WP 4-9S CG
|
209/9, 240/4
|
2003-03-17 |
|
[ 306 ]
|
Liaison statement to Working Party 4A and copied to Working Parties 1A, 7C, 7D and Joint Working Party 4-9S - Compatibility analysis between the EESS (passive) in the band 50.2-50.4 GHz and a possible new allocation to the FSS (space-to-Earth) in parts of the band 47.2-50.2 GHz
|
N/A
|
|
2002-12-13 |
|
[ 305 ]
|
Liaison statement to JWP 4-9S, WP 4A and TG 1/7 - Compatibility issues between the radio astronomy service and possible new allocations to the fixed-satellite service (space-to-Earth)
|
WP 7D
|
|
2002-10-09 |
|
[ 304 ]
|
Liaison statement to WPs 4A and 4-9S - Compatibility analysis between the EESS (passive) in the band 50.2-50.4 GHz and a possible new allocation to the FSS (space-to-Earth) in parts of the band 47.2-50.2 GHz
|
WP 7C
|
|
2002-10-09 |
|
[ 303 ]
|
Liaison statement to Task Group 1/7 and Working Parties 4A, 4-9S, 7C, 7D, 8B and 8D - Further comments on CPM text for Agenda items 1.82 and 1.32 (WRC-03) and on preliminary draft Recommendation ITU-R SM.[BbB]
|
WP 6S
|
|
2002-09-19 |
|
[ 302 ]
|
Response from WP 6E to liaison statements from WP 4A, WP 6S and TG 6/8 and liaison statement to WP 7D, WP 8A, WP 8B, WP 8D and WP 9D
|
WP 6E
|
268/11
|
2002-09-10 |
|
[ 301 ]
|
Chairman's Report on the meeting of Working Party 4-9S - Geneva, 17-25 April 2002
|
Ch. WP 4-9S
|
|
2001-10-15 |
|
[ 300 ]
|
Liaison statement from WP 3J and 3M - Additional information concerning rain fade events and statistics in the bands
|
WP 3J & 3M
|
|
2001-10-15 |
|
[ 299 ]
|
Liaison statement to WP 4-9S concerning the percentage of time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting ..
|
WP 3M
|
|
2001-10-15 |
|
[ 298 ]
|
Liaison statement to JWP 4-9S for action and WP 6S for information - WRC-03 Agenda Item 1.25 concerning HD-FSS at 17-22 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 297 ]
|
Liaison statement to WP 4-9S - Draft CPM text for WRC-03 Agenda item 1.37
|
WP 4A
|
|
2001-10-15 |
|
[ 296 ]
|
Liaison statement to WP 4-9S - FSS parameters for interference studies relevant to the FSS and HAPS in the band 27.5-28.35 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 295 ]
|
Liaison statement to Working Party 4-9S - The current regulatory situation of typical FSS and BSS earth stations
|
WP 4A
|
|
2001-10-15 |
|
[ 294 ]
|
LS on compatibility analysis between the EESS (passive) in the band 50.2-50.4 GHz and a possible new allocation to the GSS (space-to-Earth) in parts of the band 47.2-50.2 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 293 ]
|
Liaison statement to JWP 4-9S - Sharing between FSS (Earth-to-space) and a possible new allocation to the FSS (space-to-Earth) in parts of the band 47.2-50.2 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 292 ]
|
Liaison statement on mitigation techniques proposed for fixed-satellite service (FSS) to facilitate sharing with fixed service (FS) in the band 17.7-19.7 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 291 ]
|
Liaison statement to WP 7D and JWP 4-9S - Compatibility analysis between radio astronomy in the band 48.94-49.04 GHz and a possible new allocation to the FSS (space-to-earth) in parts of the band 47.2-50.2 GHz
|
WP 4A
|
|
2001-10-15 |
|
[ 290 ]
(Rev.2) |
Reply liaison statement to Working Party 4-9S - Simplified coordination/and recording of assignments of earth stations of high density systems in the FSS
|
WP 4A
|
|
2001-10-15 |
|
[ 289 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-15 |
|
[ 288 ]
|
Regulatory considerations on WRC-03 Agenda item 1.26
|
Iran
|
|
2001-10-15 |
|
[ 287 ]
|
Satellite systems based on highly elliptical orbits
|
Israel
|
|
2001-10-15 |
|
[ 286 ]
|
Power flux-density values for satellites in the fixed-satellite service using highly elliptical orbits in the 4 and 11 GHz bands
|
Finland
|
|
2001-10-15 |
|
[ 285 ]
|
Regulatory issues and CPM text related to agenda item 1.26
|
France
|
|
2001-10-15 |
|
[ 284 ]
|
Preliminary draft CPM-02 text on WRC-03 agenda item 1.26
|
United Kingdom
|
|
2001-10-15 |
|
[ 283 ]
+Corr.1 |
Liaison statement to WP 4-9S - Proposed elements of the CPM texts on Agenda item 1.13 (Resolutions 122 and 734)
|
WP 9B & 9D
|
|
2001-10-15 |
|
[ 282 ]
|
Use of downlink power control by GSO FSS satellites in the bands 37.5-40 GHz and 40.5-42.5 GHz
|
France
|
|
2001-10-15 |
|
[ 281 ]
|
Liaison statement to WP 4-9S - Use of the 18 GHz band by the FS for mobile infrastructure networks
|
WP 9B
|
|
2001-10-15 |
|
[ 280 ]
|
Liaison statement to Working Parties 4A, 4-9S, 6S, 8A, 8D, 8F and the Speical Committee - The current regulatory situation of typical FSS and BSS earth stations
|
WP 9D
|
|
2001-10-15 |
|
[ 279 ]
|
Liaison statement to WP 4-9S - Power flux-density limits to be applied to FSS, MSS and BSS in the 37.5-42.5 GHz range (WRC-03 Agenda item 1.32)
|
WP 9D
|
|
2001-10-15 |
|
[ 278 ]
|
Liaison statement to Working Party 4-9S - Interference criteria to protect the fixed wireless systems from interference produced by GSO and non-GSO satellites in the 37-40 GHz and 40.5-43.5 GHz bands
|
WP 9A
|
|
2001-10-15 |
|
[ 277 ]
|
Liaison statement to WP 4-9S - Draft new Recommendation ITU-R SF.[Doc.4/80-9/101]
|
WP 9D
|
|
2001-10-15 |
|
[ 276 ]
|
ESV-Future operation and protection
|
Telenor SA
|
|
2001-10-15 |
|
[ 275 ]
|
Necessary limits for earth stations on board vessels
|
INMARSAT
|
|
2001-10-15 |
|
[ 274 ]
|
Study into the effect of the interference from certain NGSO systems into fixed services in the 11 GHz band considering 4 m, 1.8 m and 1.2 m antennas
|
Australia
|
|
2001-10-15 |
|
[ 273 ]
|
Efficiency study on shared use of the 17.7-19.7 GHz band by high-density applications in the FSS in the space-to-earth direction and the fixed service
|
United Kingdom
|
|
2001-10-15 |
|
[ 272 ]
|
Impact of the use of adaptive coding technique on potentially interfered FSS earth stations
|
Francia
|
|
2001-10-15 |
|
[ 271 ]
|
Sharing between fixed service and fixed satellite service (space-to-earth) for HDFSS application in the 47.250.2 GHz band
|
France
|
|
2001-10-15 |
|
[ 270 ]
|
Preliminary draft CPM text (chapter 4.3) on WRC-03 agenda item 1.25
|
France
|
|
2001-10-15 |
|
[ 269 ]
|
Working document towards a PDNR - Guidelines for the implementation of GSO and non-GSO FSS earth stations without individual site coordination in the 17.7-20.2 and 27.5-30 GHz bands
|
France
|
|
2001-10-15 |
|
[ 268 ]
|
Comments on PDNR SF.[4-9S/ESV-C] - Guidance for determination of the interference potential ESVs and FS stations when the ESV is operating close to shore
|
Brazil
|
|
2001-10-15 |
|
[ 267 ]
|
Proposal for deletion of Recommendation ITU-R SF.615-1
|
Brazil
|
|
2001-10-15 |
|
[ 266 ]
|
Possible use of 6 GHz central band by the ESV transmitters as a mitigation technique to reduce potential interference to FS receivers
|
Brazil
|
|
2001-10-15 |
|
[ 265 ]
|
Information document on agenda item 1.26 - Earth stations on board vessels
|
Brazil
|
|
2001-10-15 |
|
[ 264 ]
|
Comments on & revisions to working document toward a preliminary draft new Recommendation [ITU-R SF.[PFD-MULTISAT]] - General considerations on assessment of power flux-density limits to protect the FS stations in a multi-satellite environment
|
USA
|
|
2001-10-15 |
|
[ 263 ]
|
Working Document - Additional information concerning rain fade events and statistics in the bands 37.5-40.0 GHz and 42.0-42.5 GHz
|
USA
|
|
2001-10-15 |
|
[ 262 ]
|
Modification to PDNR SF.[4-9S/ESV-A] - Methods for assessing the minimum distance form the coastline beyond which in-motion earth stations located on board vessels would not cause unacceptable interference to the fixed service
|
USA
|
|
2001-10-15 |
|
[ 261 ]
|
Modification of preliminary draft CPM text for Agenda 1.26
|
USA
|
|
2001-10-15 |
|
[ 260 ]
|
DNR - 4-9S/ESV-FREQ - Use of frequencies by Earth stations on board vessels transmitting in certain bands allocated to the fixed-satellite service
|
USA
|
|
2001-10-15 |
Resultats:334 documents Résultats :
-
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):