Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1663 ]  
 
Communication channel in G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Deutsche Telekom AG , Telefon AB - LM Ericsson   Q14/15   2016-02-01
[ 1662 ]  
 
G.fast, G.hs: G.994.1 tone sets for coax     ADTRAN , AT&T, Inc. , Broadcom Corporation , Qualcomm, Inc. , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-01
[ 1661 ]  
 
G.Fast: Requirements for operation on copper lines extended to include coaxial cables     ZTE Corporation   Q4/15   2016-02-01
[ 1660 ]  
 
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax     ZTE Corporation   Q4/15   2016-02-01
[ 1659 ]  
 
Statistical approach for chromatic link dispersion using G.652.D fibres     Prysmian SpA   Q6/15, Q5/15   2016-02-01
[ 1658 ]  
(Rev.1) 
Proposal of SDN living list update for fault processing on multi-layer control     Nippon Telegraph and Telephone Corporation (NTT)   Q14/15, Q12/15   2016-02-01
[ 1657 ]  
 
Proposal to specify Module Framer Interfaces and DSP Framer Interfaces in a new G.709 supplement     Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1656 ]  
(Rev.1) 
Draft Text: Transport architecture and requirement for Smart Home     Fujitsu Limited , Japan Advanced Institute of Science and Technology , Mitsubishi Electric Corporation , NEC Corporation , Oki Electric Industry Company Ltd. (OKI) , Panasonic Corporation   Q15/15   2016-02-01
[ 1655 ]  
(Rev.1) 
T-SDN control model for delegated network service     Coriant GmbH & Co. KG , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd. , KT Corporation , Telefónica S.A.   Q14/15, Q12/15   2016-02-01
[ 1654 ]  
 
Proposal on synchronization information model     China Mobile Communications Corporation   Q14/15, Q13/15   2016-02-01
[ 1653 ]  
 
Method of time variation detection in T-BC (G.8273.2)     Nippon Telegraph and Telephone Corporation (NTT)   Q13/15   2016-02-01
[ 1652 ]  
 
The planning and monitoring of the synchronization paths     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1651 ]  
 
ePRTC and T-GM function model (G.8272.1)     Nippon Telegraph and Telephone Corporation (NTT)   Q13/15   2016-02-01
[ 1650 ]  
 
Measurement methods of message delay time for time synchronization     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1649 ]  
(Rev.1) 
Transporting CPRI clients with different clock sources  
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Nippon Telegraph and Telephone Corporation (NTT)   Q13/15, Q11/15   2016-02-01
[ 1648 ]  
 
Proposal to include time synchronization defects and performance monitoring functions in G.781.1     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1647 ]  
 
Proposal to include frequency synchronization defects and performance monitoring functions in G.781     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1646 ]  
 
Considerations on the selection of ePRTC/PRTC T-GMs by alternate BMCA     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1645 ]  
 
Addressing Editor's note in G.8264     Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1644 ]  
(Rev.1) 
Comments on the YANG data model for Ethernet Ring Protection     NEC Corporation   Q14/15, Q10/15   2016-02-01
[ 1643 ]  
 
Effect of micro-trenches on road pavements     SIRTI S.p.A.   Q16/15   2016-02-01
[ 1642 ]  
 
Editing improvements in G.8275.2 clause 6.7.5, Clock attribute clockAccuracy     Microsemi Corporation , Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1641 ]  
 
Requirement of evaluation of optical layer protection     China Unicom   Q9/15   2016-02-01
[ 1640 ]  
 
Improving performance in Partial Timing Support     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1639 ]  
 
Comments on latest draft of G.8275.2 (and G.8265.1)     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1638 ]  
 
Comments on Reference model for centralized recovery     China Unicom   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1637 ]  
 
Clarifications on T-TSC in G.8275.1     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1636 ]  
 
Clarification on requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1635 ]  
 
Proposal of requirements for protection scheme in C 1632     Bharti Airtel Limited , China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1634 ]  
 
Comments on latest draft of G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1633 ]  
 
Proposal to indicate the type of ePRTC/PRTC in the PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1632 ]  
 
Proposal of initial a new standardization for Port-based protection in OTN network     Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15   2016-02-01
[ 1631 ]  
 
Proposal to study MPLS-TP service information model pruning and refactoring     China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q14/15, Q10/15   2016-02-01
[ 1630 ]  
 
Proposal to restart working on G.8132 aligned with MPLS working group, IETF     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q9/15   2016-02-01
[ 1629 ]  
 
Proposal on draft outline of Recommendation G.8132     China Mobile Communications Corporation   Q9/15   2016-02-01
[ 1628 ]  
 
Proposal to study OTN data plane pruning and refactoring     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1627 ]  
 
CPRI over OTN phase 2 extension     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1626 ]  
 
Transparency of mapping of CPRI into OTN phase 2     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1625 ]  
 
Proposal on Hold-off timer     Electronics and Telecommunications Research Institute (ETRI) , ZTE Corporation   Q9/15   2016-02-01
[ 1624 ]  
 
CPRI over OTN phase 2 application update     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1623 ]  
 
Proposed texts for G.808.3     ZTE Corporation   Q9/15   2016-02-01
[ 1622 ]  
 
Proposal of new section "8.4 Common interaction between architectural components" of G.cca     FiberHome Technologies Group   Q14/15, Q12/15   2016-02-01
[ 1621 ]  
 
Proposal of move section 8.5 to 9.3 of G.asdtn     FiberHome Technologies Group   Q14/15, Q12/15   2016-02-01
[ 1620 ]  
 
Performance monitoring in Sync OAM     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15   2016-02-01
[ 1619 ]  
 
Proposal of new appendix about network migration of SDTN in G.asdt     China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2016-02-01
[ 1618 ]  
 
G.hn: Auto-Pairing mechanism     ZTE Corporation   Q18/15   2016-02-01
[ 1617 ]  
 
Revised proposal of multi-dimensional modulation format in G.Sup.39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1616 ]  
 
Revised Proposals about the Super-Nyquist DWDM in G.sup39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1615 ]  
(Rev.1) 
Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
ZTE Corporation   Q13/15, Q11/15   2016-02-01
[ 1614 ]  
 
Consideration and proposal on overhead format of FlexO     ZTE Corporation   Q11/15   2016-02-01
Resultados :2210 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2016-09-28