Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Reunión 2016-02-15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C (2016-02-15) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reunión  del 2016-02-15 al 2016-02-26

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Resultados :47 documentos
Contribuciones  [ AI/Cuestión: Q4/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1858 ]  
 
Configuration counters in L2 states (G.9701 Amd 1)     Intel Corporation   Q4/15   2016-02-02
[ 1856 ]  
 
Comments on the draft G.9701 Amendment 1     Intel Corporation   Q4/15   2016-02-02
[ 1840 ]  
 
G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters     Proximus PLC   Q4/15   2016-02-02
[ 1838 ]  
 
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   Q4/15   2016-02-02
[ 1817 ]  
 
G.fast: Reduction of number VF samples reporting formats     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1816 ]  
 
G.fast: Clarification on byte order in SOC and EOC messages.     Broadcom Corporation , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-02
[ 1812 ]  
 
G.fast: G.9701 test parameters text improvements     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1810 ]  
 
G.fast: Various text updates to G.9701 Amd1 Low power mode     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1809 ]  
 
G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Broadcom Corporation   Q4/15   2016-02-02
[ 1808 ]  
 
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1807 ]  
 
G.vdsl: Mis-estimation of SNR during MEDLEY     Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   Q4/15   2016-02-02
[ 1806 ]  
 
Future work on G.fast recommendations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1805 ]  
 
G.fast, Editorial Correction to Figure Z-2.1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1804 ]  
 
G.fast: G.fast XLOG test parameter     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1802 ]  
 
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1801 ]  
 
G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1800 ]  
 
G.ploam: Test parameter update time stamps in G.997.2 Amd1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1799 ]  
 
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1798 ]  
 
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1797 ]  
 
G.ploam: Missing lom failure in G.997.1     Alcatel-Lucent International   Q4/15   2016-02-02
[ 1792 ]  
 
G.vector: Considerations about Multi-Vendor Vectoring standardization     Telecom Italia S.p.A.   Q4/15   2016-02-02
[ 1791 ]  
 
G.fast: On data rate reporting     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1787 ]  
 
Proposal for TIGAV transmission method     Intel Corporation   Q4/15   2016-02-02
[ 1783 ]  
 
G.fast: Upstream Hlog reporting     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1782 ]  
 
G.ploam, Capability reporting in G.997.1 and G.997.2     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2016-02-02
[ 1774 ]  
 
On G.fast based solution for Coax application     British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   Q4/15   2016-02-02
[ 1744 ]  
 
On the details of TIGAV procedure     Intel Corporation   Q4/15   2016-02-02
[ 1743 ]  
 
Proposed eoc settings for Annex Q when used with G.993.5     Intel Corporation   Q4/15   2016-02-02
[ 1742 ]  
 
On the timeout of L2.1-Entry procedure (G.9701 Amd 1)     Intel Corporation   Q4/15   2016-02-02
[ 1740 ]  
 
Proposed corrigendum to G.9701     Intel Corporation   Q4/15   2016-02-02
[ 1702 ]  
(Rev.1) 
G.fast Amendment 2: Maximum Bit Loading Revisited     Huawei Technologies Co., Ltd. , Metanoia Technologies , Swisscom SA   Q4/15   2016-02-01
[ 1701 ]  
(Rev.1) 
G.fast: Exchange and determine the time out of initialization stages in handshake     Huawei Technologies Co., Ltd.   Q4/15   2016-02-01
[ 1672 ]  
 
G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management     ADTRAN , AT&T, Inc.   Q4/15   2016-02-01
[ 1668 ]  
(Rev.1) 
G.fast: FTU-R software upgrade over eoc     ADTRAN , AT&T, Inc. , CenturyLink , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-01
[ 1662 ]  
 
G.fast, G.hs: G.994.1 tone sets for coax     ADTRAN , AT&T, Inc. , Broadcom Corporation , Qualcomm, Inc. , Sckipio Technologies S.I. Ltd.   Q4/15   2016-02-01
[ 1661 ]  
 
G.Fast: Requirements for operation on copper lines extended to include coaxial cables     ZTE Corporation   Q4/15   2016-02-01
[ 1660 ]  
 
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax     ZTE Corporation   Q4/15   2016-02-01
[ 1567 ]  
 
G.fast: Framework for Dynamic US/DS Time Assignment Mechanism     Qualcomm, Inc.   Q4/15   2016-01-29
[ 1565 ]  
 
G.fast - specification of Impulse noise monitoring     Swisscom SA   Q4/15   2016-01-29
[ 1563 ]  
(Rev.1) 
G.fast: requirements for the DBA TDD DS/US ratio limits     AT&T, Inc. , ADTRAN , Sckipio Technologies S.I. Ltd.   Q4/15   2016-01-29
[ 1562 ]  
 
G.fast coax cable configurations     ADTRAN , AT&T, Inc.   Q4/15   2016-01-29
[ 1561 ]  
(Rev.1) 
G.fast 212 MHz amendment     AT&T, Inc. , Orange , TELUS Communications   Q4/15   2016-01-29
[ 1550 ]  
 
G.fast: Signalling of DBA updates over the RMC     ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd.   Q4/15   2016-01-28
[ 1549 ]  
 
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime     ADTRAN , AT&T, Inc. , Sckipio Technologies S.I. Ltd.   Q4/15   2016-01-28
[ 1526 ]  
 
G.fast - Need for improved reporting of EFTR     Swisscom SA   Q4/15   2016-01-27
[ 1524 ]  
 
G.fast - Need for seamless reconfiguration of TARSNRM     Swisscom SA   Q4/15   2016-01-22
[ 1499 ]  
 
Release of BT cable (20 pair) NEXT measurements for use in simulations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-12-10
Resultados :47 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-24