Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2010-05-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2010-05-31) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2010-05-31 al 2010-06-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :23 documentos
Contribuciones  [ Origen: AT ]   Documents / Contributions
 
Número 
Fecha Origen Título Cuestiones
[ 1090 ]  
 
2010-05-21 CATR , Huawei   SD triggered protection switching in G.8031     Q9/15  
[ 1070 ]  
 
2010-05-21 FiberHome , CATR , ZTE   1588v2 transmission by OSC over OTN     Q13/15, Q11/15  
[ 1067 ]  
 
2010-05-21 Symmetricom , CATR , CMCC   GPS timing receiver characterization     Q13/15, Q11/15  
[ 1066 ]  
 
2010-05-21 CMCC , CATR , ZTE   Analysis of time synchronization performance using PTP in hybrid transport network     Q13/15, Q11/15  
[ 1065 ]  
 
2010-05-21 CMCC , CATR , Huawei , ZTE   Proposal of accelerating MTIE and TDEV mask study for time synchronization     Q13/15  
[ 1064 ]  
 
2010-05-21 CMCC, ZTE, CATR   Proposal of research on link asymmetry compensation for PTP     Q13/15  
[ 1062 ]  
 
2010-05-21 CATR   Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth     Q15/15  
[ 1061 ]  
 
2010-05-21 CATR   Proposal of revising for SSM message delay description in G.8264     Q13/15  
[ 1060 ]  
 
2010-05-21 CATR , Huawei   Objectives and Requirements for G.827x Recommendations     Q13/15  
[ 1059 ]  
 
2010-05-21 CATR   Functionality proposals about MPLS-TP OAM toolsets in G.tpoam     Q10/15  
[ 1057 ]  
 
2010-05-21 CATR   Some consideration with 40G intra-office interface parameters     Q6/15  
[ 1056 ]  
 
2010-05-21 CATR , Huawei   Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     Q6/15  
[ 1055 ]  
 
2010-05-21 CATR   40G application code for G.698.2     Q6/15  
[ 1048 ]  
 
2010-05-22 CATR   Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     Q6/15  
[ 1041 ]  
 
2010-05-20 ZTE , CATR , CMCC   Issues about metrics of network limits for time synchronization     Q13/15  
[ 1040 ]  
 
2010-05-20 ZTE , CATR , CMCC   Field test of 1588v2 time sync based on physical layer frequency sync support     Q13/15  
[ 1037 ]  
 
2010-05-20 ZTE , CATR , CMCC   1588v2 test results with different clock mode and field network     Q13/15  
[ 1025 ]  
 
2010-05-20 AT&T   Clarification on ODU Multiplexing     Q13/15, Q12/15  
[ 904 ]  
 
2010-05-18 Huawei , CATR , MII   G.827x Recommendations - High-Level Objectives     Q13/15  
[ 903 ]  
 
2010-05-18 Huawei , CATR , China Mobile Communications Corporation , MII   Pulse-Per-Second Interface     Q13/15  
[ 823 ]  
 
2010-05-17 Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China   Propose to add an appendix to describe EVPRM solution to G.8011.4     Q10/15  
[ 807 ]  
 
2010-05-16 AT&T   G.hn Management and Diagnostics Specifications     Q4/15  
[ 806 ]  
 
2010-05-16 AT&T , ASSIA Inc , Qwest , Verizon   Proposed ITU-T Rec. on remote management of CPE     Q4/15, Q2/15, Q1/15  
Resultados :23 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

 

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2013-5-19