Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2008-12-01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2008-12-01) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2008-12-01 al 2008-12-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Resultados :338 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 338 ]  
 
G.8032 SF and FS     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-28
[ 337 ]  
 
G.lt: Update to SELT-PMD draft text     Alcatel-Lucent Bell N.V.   Q4/15   2008-11-28
[ 336 ]  
 
G.984.4 Implementer's Guide     Huawei Technologies Co.,Ltd.   Q2/15   2008-11-26
[ 335 ]  
 
Signal Degrade (SD) triggered protection switching     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 334 ]  
 
Proposal on the link recovery in case of multiple failures in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 333 ]  
 
Proposal on the ring node initialization in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 332 ]  
 
Proposal on flush optimization support in G.8032     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 331 ]  
 
Proposal on non-revertive mode in G.80323     Huawei Technologies Co., Ltd.   Q9/15   2008-11-26
[ 330 ]  
 
Parameters in G.lcasub     Huawei Technologies Co., Ltd.   Q8/15   2008-11-26
[ 329 ]  
 
Supplement on repeaterless optical fibre submarine cable system (G.973)     Huawei Technologies Co., Ltd   Q8/15   2008-11-26
[ 328 ]  
 
The influence of COTDR to optical signals     Huawei Technologies Co., Ltd   Q8/15   2008-11-26
[ 327 ]  
 
Comments on P-DPSK according to the test data     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 326 ]  
 
Proposal for Optical Interface Diagnostic Monitoring for Optical Transmission System     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 325 ]  
 
Optically identified wavelength in performance monitoring     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 324 ]  
 
About P-DPSK receiver performance dependence on optical filter characteristics     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 323 ]  
 
DCC and GCC usage for DCN     Huawei Technologies Co., Ltd.   Q14/15   2008-11-26
[ 322 ]  
 
DCC and GCC usage for DCN (different version)     Huawei Technologies Co., Ltd.   Q14/15   2008-11-26
[ 321 ]  
 
Additional Call attributes for VCAT/LCAS     Huawei Technologies Co., Ltd., China   Q14/15   2008-11-26
[ 320 ]  
 
G.800 Terminology and Backward Compatibility with G.805     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 319 ]  
 
G.800 Description of Media Networks     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 318 ]  
 
G.800 Interconnect Entities     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 317 ]  
 
Proposal to extend G.8012     Huawei Technologies Co., Ltd.   Q11/15   2008-11-26
[ 316 ]  
 
G.inp: Updated Working Text for Physical-Layer Retransmission     MII, China, Huawei   Q4/15   2008-11-25
[ 315 ]  
 
G.inp: Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 314 ]  
 
G.int: Proposal for Next-Generation LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 313 ]  
 
G.vector: Preventing Disruption of Existing Lines During Joining     MII, China, Huawei   Q4/15   2008-11-25
[ 312 ]  
 
G.inp: More Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 311 ]  
 
G.vdsl: Improving the Performance of Upstream Power Back-off     MII, China, Huawei   Q4/15   2008-11-25
[ 310 ]  
 
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface     MII, China, Huawei   Q4/15   2008-11-25
[ 309 ]  
 
G.int: Comments on LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 308 ]  
 
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers     MII, China, Huawei   Q4/15   2008-11-25
[ 307 ]  
 
G.8032 Flushing     Alcatel-Lucent   Q9/15   2008-11-25
[ 306 ]  
 
G.8032 WTR and WTB comments     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 305 ]  
 
G.8032 Statemachine     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 304 ]  
 
G.8032 Priority Logic and Statemachine     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 303 ]  
 
G.8032 Hidden Transitions     Alcatel-Lucent, AimValley BV   Q9/15   2008-11-25
[ 302 ]  
 
Comparison between synchronization metrics     Nokia Siemens Networks   Q13/15   2008-11-25
[ 301 ]  
 
VDSL: Noise testing with fluctuating crosstalk     BT plc   Q4/15   2008-11-25
[ 300 ]  
 
Retransmission management in the TPS-TC layer     Infineon Technologies AG   Q4/15   2008-11-23
[ 299 ]  
 
Proposal on automatic discovery requirements in WDM network in G.7714.1     ZTE Corporation   Q14/15   2008-11-23
[ 298 ]  
 
Clarifications on Key Management in GPON System     ZTE Corporation   Q2/15   2008-11-23
[ 297 ]  
 
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync     ZTE Corporation   Q13/15   2008-11-23
[ 296 ]  
 
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265     ZTE Corporation, CATR MII   Q13/15   2008-11-23
[ 295 ]  
(Rev.1) 
Proposal to consider node resource management in G.8080 for WSON     ZTE Corporation   Q12/15   2008-11-23
[ 294 ]  
 
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 293 ]  
 
Flushing behaviour in interconnected ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 292 ]  
 
FDB Flush Problem in non_revertive operation     ZTE Corporation, China   Q9/15   2008-11-23
[ 291 ]  
 
Difference between sub-ring and single ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 290 ]  
 
Comparison between shared-link and sub-ring models (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 289 ]  
 
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission     ZTE Corporation   Q6/15   2008-11-23
Resultados :338 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-24