Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 13 : Reunión 2009-01-12 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 13  C (2009-01-12) 

UIT-T SG 13

Redes futuras, incluidas las redes móviles y las de la próxima generación

Periodo de estudios 2009

Reunión  del 2009-01-12 al 2009-01-23

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Resultados :176 documentos
Resultados :   -  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 151 ]  
 
Proposed to add an information component in Rh reference point     China Telecom, ZTE Corporation   Q4/13   2009-01-07
[ 150 ]  
 
Proposal to do add new definition, References and Abbreviations and acronyms of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 149 ]  
 
Proposal for the information flow of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 148 ]  
 
Proposal for the id-loc-split-based multihoming of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 147 ]  
 
Proposal for the id-loc-split-based mobility of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 146 ]  
 
Proposal for the architecture model of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 145 ]  
 
Proposal for add the contents of the appendix to the body of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 144 ]  
 
Proposed Initial Text for ITU-T Supplement "Evaluation of Existing Signaling Protocol Extensions to Support Y.2171 Admission Control Priority Levels"     AT&T and Telcordia   Q4/13   2009-01-07
[ 143 ]  
 
Proposed changes to sub-clause 9.3.2 of Y.iptv-control-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 142 ]  
 
Proposal to initiate a work item to study DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
[ 141 ]  
 
Proposed replacement for sub-clauses 7.2.1 and 7.2.2 of draft Y.PTDN     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 140 ]  
 
Proposed text of draft recommendation for iSCP scenarios     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 139 ]  
 
Proposed baseline text of draft recommendation for iSCP requirements     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 138 ]  
 
Proposal for additional text on routing optimization consideration for handover     China Mobile, Huawei Technologies Co. Ltd   Q5/13   2009-01-07
[ 137 ]  
 
Proposal for adding VPN identifier and VPN numbering fields in the header of the network layer user packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 136 ]  
 
Proposal to extend fields of the network layer data packet header.     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 135 ]  
 
Proposal for adding multicast identifier field in the header of the network layer data packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 134 ]  
 
The authentication architecture and requirements to provide mobility in NGN     Korea (Republic of)   Q16/13   2009-01-07
[ 133 ]  
 
Some modifications to the scenarios and flows of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 132 ]  
 
Proposed text for Draft Recommendation on IPv6 Evolvement in NGN     Huawei Technologies CO., LTD.   Q7/13   2009-01-07
[ 131 ]  
 
Proposed Draft Recommendation on prefix and address management for network access in IPv6-based NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 130 ]  
 
Proposal to initiate a work item for IPv6 evolvement in NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 129 ]  
 
Proposed text for sub-clauses 8.4.1 and 8.4.2 of draft Recommendation Y.ngnIdMreq     Huawei Technologies Co., Ltd.   Q16/13   2009-01-07
[ 128 ]  
 
Proposed text for Authentication and Pseudonym Management clauses of draft Y.idmMechanisms     Huawei Technologies Co.,Ltd.   Q16/13   2009-01-07
[ 127 ]  
 
Proposed draft text for DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
[ 126 ]  
 
Proposed changes to sub-clause 9.4.2 of Y.iptv-control-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 125 ]  
 
Clarifications of the role of the Proxy Mobility Location Management Function (P-MLMF) in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 124 ]  
 
More Information on IPTV Overlay Network     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 123 ]  
 
Location of mobility service profile in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 122 ]  
 
Layer 2 handover in Y.MMCF     CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 121 ]  
 
Proposed comments to draft Y.CMR     Huawei Technologies Co.,Ltd   Q14/13   2009-01-07
[ 120 ]  
 
Proposed content for sub-clause 7.2 of draft Y.ipv6-object     Huawei Technologies Co., Ltd.   Q7/13   2009-01-07
[ 119 ]  
 
Integrated versus split mode in Y.MMCF     CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 118 ]  
 
Clarification of the role of the HDF in Y.MMCF     China Mobile, CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 117 ]  
 
Proposed text of unicast and multicast resource reuse     Huawei Technologies Co., Ltd.   Q4/13   2009-01-07
[ 116 ]  
 
Proposed text of resource control for QoS downgrading     Huawei Technologies Co., Ltd.   Q4/13   2009-01-07
[ 115 ]  
 
Proposal of New Work Item on the Scenario of Multi-connection Architecture (Q.SCEN-MCA)     Huawei, China Mobile   Q9/13   2009-01-06
[ 114 ]  
 
Proposed work item for scenarios of DSN     Huawei Technologies Co., Ltd.   Q19/13   2009-01-06
[ 113 ]  
 
Proposed work item for Requirements and capabilities of ITU-T DSN     China Mobile   Q19/13   2009-01-06
[ 112 ]  
 
Proposed work item for requirement of multi-connection     China Mobile   Q9/13   2009-01-06
[ 111 ]  
 
Proposed work item for architecture of multi-connection     China Mobile   Q9/13   2009-01-06
[ 110 ]  
 
Proposed Study Roadmap for Q9 (Multi-Connection Question)     China Mobile   Q9/13   2009-01-06
[ 109 ]  
 
Proposed Study Roadmap for Q19 (DSN)     China Mobile   Q19/13   2009-01-06
[ 108 ]  
 
Proposed Scope of Multi-connection Question     China Mobile   Q9/13   2009-01-06
[ 107 ]  
 
Proposed scope of DSN     China Mobile   Q19/13   2009-01-06
[ 106 ]  
 
Proposal for information flow for IMS based handover control     China Mobile, Huawei   Q8/13   2009-01-06
[ 105 ]  
 
Proposed Addition to Y.secMechanisms     Telcordia Technologies and AT&T   Q16/13   2009-01-06
[ 104 ]  
 
Proposed Addition to Y.ngnIdMuse     Telcordia Technologies and AT&T   Q16/13   2009-01-06
[ 103 ]  
 
Proposed Changes and Addition to Draft Y.ngnIdMreq     Telcordia Technologies and AT&T   Q16/13   2009-01-06
[ 102 ]  
 
Proposed Addition to Y.secMechanisms     Telcordia Technologies and AT&T   Q16/13   2009-01-06
Resultados :176 documentos
Resultados :   -  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-25