Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1B : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1B  C 

UIT-R WP1B

Metodologías para la Gestión Eficaz del Espectro y Estrategias Económicas

Resultados :250 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 175 ]  
 
White space device management     ATDI     2014-05-28
[ 174 ]  
 
Liaison statement to Working Party 1B (copied to Working Parties 5B, 5C and 5D for information) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 5A     2014-05-30
[ 173 ]  
 
Liaison statement to Working Party 1B (copied for information to ITU-R Working Parties 5A, 5C and 5D) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     WP 5B     2014-05-30
[ 172 ]  
 
Chapter 2 - Spectrum planning     Colombia (Republic of)     2014-05-28
[ 171 ]  
 
Proposal to develop a new ITU-R Report on innovative regulatory tools to support enhanced shared use of the spectrum     France     2014-05-28
[ 170 ]  
 
Liaison statement to Working Party 1B (copied for information to Working Parties 5A and 5B) - Development of a draft new Report ITU-R SM.[WHITE-SPACE] spectrum management principles and spectrum engineering techniques for the use of "White spaces" by radio systems employing cognitive capabilities     WP 5C     2014-05-28
[ 169 ]  
 
Working document towards a preliminary draft revision of the ITU Handbook on "National spectrum management " - Chapter 5 - Spectrum Engineering Practices     Argentine Republic     2014-05-28
[ 168 ]  
 
Working document towards a preliminary draft modification towards Recommendation ITU-R SM.1603-1     Korea (Republic of)     2014-05-28
[ 167 ]  
 
This document has been withdrawn     Korea (Republic of)     2014-05-27
[ 166 ]  
 
Report of the activities of the Rapporteur Group     Rapp. RG WP 1B rev. ITU H'book "N.S.M."     2014-05-27
[ 165 ]  
 
Proposed modifications to working document towards draft CPM text - WRC-15 agenda item 9.1, issue 9.1.7     Canada     2014-05-26
[ 164 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     Canada     2014-05-26
[ 163 ]  
 
Proposal regarding the update of ITU Handbook on "National Spectrum Management"     France     2014-05-26
[ 162 ]  
 
How measurement of spectrum occupancy can help spectrum management     Germany (Federal Republic of)     2014-05-26
[ 161 ]  
 
Preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles for dynamic access to spectrum by radio systems employing cognitive capabilities     United States of America     2014-05-23
[ 160 ]  
 
Working document towards a revision of Recommendation ITU-R SM.1603-1 spectrum redeployment as a method of national spectrum management - Spectrum redeployment as a method of national spectrum management     United States of America     2014-05-23
[ 159 ]  
 
Possible allocation for intra chip communication in the 200-600 GHz range     Netherlands (Kingdom of the)     2014-05-23
[ 158 ]  
 
Working document toward a preliminary draft revision of Chapter 8 - Measures of spectrum utilization and spectrum utilization efficiency     China (People's Republic of)     2014-05-21
[ 157 ]  
 
Considerations about [DIGITAL DIVIDEND] issues and modification proposal on Annex 8 of Working Party 1B Chairman's Report     China (People's Republic of)     2014-05-21
[ 156 ]  
 
Proposed contribution to the working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     China (People's Republic of)     2014-05-21
[ 155 ]  
 
Proposal for management policy of wireless power transmission devices     China (People's Republic of)   210-3/1   2014-05-21
[ 154 ]  
 
Working document towards a draft new Report ITU-R SM. [DIGITAL DIVEDEND ISSUES] - Proposals towards a draft new Report ITU-R SM.[DIGITAL DIVIDEND ISSUES]     Russian Federation     2014-05-21
[ 153 ]  
 
Proposals for revision of working document towards a PDN Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio system employing cognitive capabilities     Russian Federation     2014-05-21
[ 152 ]  
 
Working document towards draft CPM text on WRC-15 agenda item 9.1 issue 9.1.6     China (People's Republic of)     2014-05-15
[ 151 ]  
 
Working document towards draft CPM text on WRC-15 agenda item 9.1, issue 9.1.7     China (People's Republic of)     2014-05-15
[ 150 ]  
 
Liaison statement to Working Parties 1A and 1B - Revision of the ITU Handbook on "National Spectrum Management"     WP 7D     2014-05-15
[ 149 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 1A, 7B and 7C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 7D     2014-05-15
[ 148 ]  
 
Liaison statement to Working Party 1B - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 7C     2014-05-13
[ 147 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 7C and 7D for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 7B     2014-05-13
[ 146 ]  
 
NSM-HB revision of Annex 1 - Spectrum management training     Israel (State of)     2014-05-08
[ 145 ]  
 
Liaison statement to Working Party 1B (copied to Working Party 4A, 4C, 5B, IMO and WMO for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     International Civil Aviation Organization     2014-05-08
[ 144 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World Meteorological Organization     2014-04-28
[ 143 ]  
 
Liaison statement to Working Party 1B - Broadcasting for Public Warning, Disaster Mitigation and Relief     WP 6A     2014-04-23
[ 142 ]  
 
Liaison statement to Working Party 1B - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 6A     2014-04-10
[ 141 ]  
 
Liaison statement on IoT-Roadmap, IoT-work program, contacts and invitation to participate in IoT-GSI events     ITU-T JCA-IoT     2014-04-09
[ 140 ]  
 
Liaison statement to Working Party 1B (copy to Working Party 4A for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 4C     2014-03-10
[ 139 ]  
 
Liaison statement to Working Party 1B (copy to Working Party 4A for information) - WRC-15 agenda item 9.1, issue 9.1.6     WP 4C     2014-03-10
[ 138 ]  
 
FG Bridging the Gap from Innovation to Standards (FG Innovation) - Liaison statement on New Standardization Activities for ITU-T Study Groups and ICT Innovation Panel [to all ITU-T Study Groups, ITU-D Study Groups and ITU-R Study Groups]     ITU-T FG Innovation     2014-02-27
[ 137 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 5A, 5B and 5C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 5D     2014-02-25
[ 136 ]  
 
Liaison statement to Working Party 1B (copy to Working Party 4C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 4A     2014-02-14
[ 135 ]  
 
Liaison statement to Working Party 1B (copy to Working Party 4C for information) - WRC-15 agenda item 9.1, issue 9.1.6     WP 4A     2014-02-14
[ 134 ]  
(Rev.1) 
Preliminary draft revision of Recommendation ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD)     Chairman, CG on rev. RDD     2014-02-06
[ 133 ]  
 
Liaison to ITU-R on the Database for the protection of radio services     International Special Committee on Radio Interference     2014-02-06
[ 132 ]  
+Ann.1-12 
Report on the meeting of Working Party 1B (Geneva, 20-28 January 2014)     Chairman, WP 1B     2014-01-27
[ 131 ]  
 
Final list of participants - Working Party 1B (Geneva, 20-24 January 2014)     Director, BR     2014-01-27
[ 130 ]  
 
List of documents issued (Documents 1B/92- 1B/129)     BR Study Groups Department     2014-01-17
[ 129 ]  
 
Interim Report to Working Party 1B on the work of the Study Group 1 Co-Rapporteurs on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations     SG 1 Co-Rapporteurs     2014-01-17
[ 128 ]  
 
Progress Report - Correspondence Group to assist the completion of work on the preliminary draft revision of Recommendation ITU-R SM.1413-2     CG Rev. RDD     2014-01-16
[ 127 ]  
 
Working document for the revision of ITU Spectrum Management Handbook for Annex of Chapter 7     Botswana (Republic of)     2014-01-13
[ 126 ]  
 
Working document toward a preliminary draft revision of the ITU Handbook on "National Spectrum Management" - Chapter 1 - Spectrum management fundamentals     Colombia (Republic of)     2014-01-13
Resultados :250 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2020-12-16