Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : SG01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R SG01  C 

UIT-R SG01

Gestión del espectro

Resultados :197 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 72 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1753 - Radio noise measurements     WP 1C     2009-09-23
[ 71 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[DVB-COVERAGE] - DVB-T coverage measurements and verification of planning criteria     WP 1C     2009-09-23
[ 70 ]  
 
Draft new Report ITU-R SM.[HF-MMN-MEASUREMENT] - HF man-made noise measurements     WP 1C   231/1   2009-09-23
[ 69 ]  
 
Draft reply liaison statement to ITU-T Study Group 5 - Actions related to WTSA-08 Resolution 72     Chairman, SG 1     2009-09-23
[ 68 ]  
 
Draft new Report ITU-R SM.[SRD-MON] - Short-range device (SRD) monitoring     WP 1C     2009-09-23
[ 67 ]  
 
Draft new Report ITU-R SM.[PLT] - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     WP 1A     2009-09-23
[ 66 ]  
 
Report of the Joint meeting of Working Parties 1A, 1B and 1C     Chairman, SG 1     2009-09-22
[ 65 ]  
 
Draft new Report ITU-R SM.[SDR-CRS] - Definitions of Software Defined Radio (SDR) and Cognitive Radio System (CRS)     WP 1B     2009-09-22
[ 64 ]  
+Add.1-2 
Report of the Study Group 1 Rapporteur Group on Liaison with CISPR     Rapporteur Group on liaison with CISPR     2009-09-21
[ 63 ]  
 
Version 3.0 of the Spectrum Management System for developing countries     Chairman, SG 1     2009-09-21
[ 62 ]  
 
Draft editorial modification to Recommendation ITU-R SM.1757 - Impact of devices using ultra-wideband technology on systems operating within radiocommunication services     WP 1A     2009-09-21
[ 61 ]  
 
Proposed liaison statement to ITU-T Study Group 16 on vehicle gateway platform (VGP)     Korea (Republic of)     2009-09-09
[ 60 ]  
 
Status of the third stage of the Report on WTDC-06 Resolution 9 (Rev.Doha, 2006)     Chairman, SG 1     2009-09-09
[ 59 ]  
 
Proposal for Mr. Ismail A. Elghetany to serve as Vice-Chairman of Study Group 1     Chairman, ITU-R SG 1     2009-08-25
[ 58 ]  
 
Protection of aeronautical radio services against emissions of electrical and electronic apparatuses     Germany (Federal Republic of)     2009-08-21
[ 57 ]  
 
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN)     Chairman, ITU-T Focus Group on FN     2009-07-28
[ 56 ]  
 
Summary notes on the BR Workshop on the efficient use of the spectrum/orbit resource     Director, BR     2009-07-03
[ 55 ]  
 
World Telecommunication Policy Forum 2009 (WTPF-09)     Director, BR     2009-07-01
[ 54 ]  
 
Liaison statement to relevant ITU-R and ITU-T Study Groups and the ITU Coordination Committee for Vocabulary (CCV) regarding draft list of terminology on emergency telecommunications     ITU-D SG2     2009-05-07
[ 53 ]  
 
ITU-R Study Group 4 Question to be brought to the attention of Study Group 1     BR Study Group Department     2009-04-29
[ 52 ]  
 
Liaison statement on leading role of SG 2 on service definition     ITU-T SG 2     2009-04-08
[ 51 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2009-03-20
[ 50 ]  
 
Response to questionnaire from ITU-T Focus Group on ICT and climate change     Chairman, ITU-R SG 1     2009-03-10
[ 49 ]  
 
Liaison statement to all ITU-T, ITU-R and ITU-D SGs on request for multimedia contact person     ITU-T SG 16     2009-02-16
[ 48 ]  
 
Liaison statement - Establishment of Focus Group on Future Networks (FG-FN)     ITU-T SG 13     2009-02-16
[ 47 ]  
 
Liaison statement on ITU-T SG 5 actions related to WTSA Resolution 72     ITU-T SG 5     2008-12-17
[ 46 ]  
 
Liaison statement - Questionnaire from ITU-T Focus Group on ICT and Climate Change     Chairman, ITU-T FG ICT & CC     2008-12-08
[ 45 ]  
 
Liaison statement to Study Group 1 and Working Party 1A - Coordination of studies on PLT systems     WP 6A     2008-11-21
[ 44 ]  
+Add.1 
Liaison statement - Resolution 9 (REV. DOHA, 2006), draft guidelines for the establishment of a system of fees     ITU-D SG 2     2008-10-21
[ 43 ]  
+Add.1 
Liaison statement - Resolution 9 (REV. DOHA, 2006), draft analysis Report of questionnaire part II     ITU-D SG 2     2008-10-21
[ 42 ]  
 
Liaison statement from Study Group 7 to Study Group 4 (and copy to SGs 1, 3, 5, 6 and for information to RAG) - Inter-working of Study Group 4 with other ITU-R Study Groups for issues involving Working Parties of more than one Study Group     SG 7     2008-10-14
[ 41 ]  
 
Liaison statement to Study Groups in ITU and other Groups on progress achieved in the Ad Hoc - Group on Vehicle Gateway Platform (VGP)     ITU-T SG 16     2008-10-09
[ 40 ]  
 
Broadcast spectrum sharing and protection     CBS, Inc.     2008-10-08
[ 39 ]  
 
Broadcast spectrum sharing and protection     North American Broadcasters Association (NABA)     2008-10-02
[ 38 ]  
 
Liaison statement on improved geographic distribution and coordination of ITU-T Seminars and Workshops     TSAG     2008-07-23
[ 37 ]  
+Ann.1-5 
Summary Record of the meeting of Radiocommunication Study Group 1 (26-27 June 2008)     Chairman, SG 1     2008-06-27
[ 36 ]  
 
Final List of Participants (Geneva, 26-27 June 2008)     Director, Br     2008-06-27
[ 35 ]  
 
List of documents issued     BR Study Group Department     2008-06-25
[ 34 ]  
 
Proposed draft reply to Study Group 4 liaison statement - Inter-working of Study Group 4 with other ITU-R Study Groups for issues involving Working Parties of more than one Study Group     Chairman, SG 1     2008-06-25
[ 33 ]  
 
Executive Report to Study Group 1     Chairman, WP 1C     2008-06-25
[ 32 ]  
 
Executive Report to Study Group 1     Acting Chairman, WP 1A     2008-06-25
[ 31 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1723 - Automated mobile spectrum monitoring unit     WP 1C     2008-06-25
[ 30 ]  
 
Review of the ITU-R Questions assigned to Study Group 1     WP 1C     2008-06-25
[ 29 ]  
 
Proposed creation of a Rapporteur Group on Questions, assigned to Study Group 1 - Draft terms of reference     Chairman, SG 1     2008-06-25
[ 28 ]  
 
Draft new Report ITU-R SM.[INSPECTION] - Inspection of radio stations     WP 1C     2008-06-25
[ 27 ]  
 
Report of ITU-R SG 1 activities of interest to CISPR     Rapporteur Group on liaison with CISPR     2008-06-25
[ 26 ]  
(Rev.1) 
Draft liaison statement to CISPR - Limits and method of measurement of broadband telecommunication equipment over power lines     Rapporteur Group on liaison with CISPR     2008-06-25
[ 25 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1138-1 - Determination of necessary bandwidths including examples for their calculation and associated examples for the designation of emission     WP 1A     2008-06-25
[ 24 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.337-5 - Frequency and distance separations     WP 1A     2008-06-25
[ 23 ]  
 
Review of the ITU-R Questions assigned to Working Party 1A     WP 1A     2008-06-25
Resultados :197 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2011-07-20