International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : TSAG : Meeting 2013-06-04 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T TSAG  TD (2013-06-04) 

ITU-T TSAG

Telecommunication Standardization Advisory Group

Study Period 2013

Meeting  from 2013-06-04 to 2013-06-07

held in Switzerland [Geneva]

Other Meetings : 2016-07-18  2016-02-01  2015-06-02  2014-06-17  [ 2013-06-04 ] 

Results:87 total items.
Result page:  Previous -  1 - 2
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 0037 ]  
 
LS/i on Report to TSAG from SG17 as the lead study group on identity management (IdM)     ITU-T SG17     2013-05-13
[ 0036 ]  
 
LS/i on Report to TSAG from SG17 as the lead study group on languages and description techniques     ITU-T SG17     2013-05-13
[ 0035 ]  
 
LS/i on the collaboration of cloud computing security work between SG13 and SG17 [to TSAG and ITU-T SG13]     ITU-T SG17     2013-05-10
[ 0034 ]  
 
LS/i on Nomination of JCA-AHF representatives [to ITU-T Study Groups, TSAG and ITU-R Study Groups]     JCA-AHF     2013-05-10
[ 0033 ]  
 
LS/i on Alignment of testing work between SG17 and SG11 to TSAG     ITU-T SG17     2013-05-03
[ 0032 ]  
 
LS/i on the change of Question 8/17 text to TSAG     ITU-T SG17     2013-05-03
[ 0031 ]  
 
Draft four-year Rolling Operational Plan for the 2014 to 2017 timeframe     Director, TSB     2013-05-03
[ 0030 ]  
 
LS/i on the appointment of a new IETF Liaison Manager to the ITU-T for MPLS     IETF IAB     2013-05-01
[ 0029 ]  
 
LS/i on Request to provide security contacts     ITU-T SG17     2013-05-01
[ 0028 ]  
 
LS/i on Continuation of JCA-COP with revised ToR to TSAG     ITU-T SG17     2013-05-01
[ 0027 ]  
 
LS/i on Continuation of JCA-IdM with revised ToR to TSAG     ITU-T SG17     2013-05-01
[ 0026 ]  
 
Summary Report of the Workshop on ICT as an enabler for Smart Water Management, Luxor, Egypt, 14-15 April 2013     Director, TSB     2013-05-01
[ 0025 ]  
 
Summary of WTSA 2012 outcome for TSAG from ITU TSB Director     Director, TSB     2013-04-23
[ 0024 ]  
(Rev.1-2) 
Revised version of Rec. ITU-T A.23, Annex A     ITU-T Liaison Officer to JTC 1     2013-04-19
[ 0023 ]  
 
LS/i on Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     ITU-T FG-DR&NRR     2013-04-17
[ 0022 ]  
 
TSAG Remote Participation - Adobe Connect Guide     TSB     2013-04-16
[ 0021 ]  
 
LS/i on the SG13 opinion on the separation of cloud computing security work between ITU-T SG13 and SG17     ITU-T SG13     2013-04-11
[ 0020 ]  
 
LS/i on the efforts taken and future plans on the separation of cloud computing security work between ITU-T SG13 and SG17     ITU-T SG13     2013-04-11
[ 0019 ]  
 
LS/i on Appointment of a new IETF Liaison Manager to the ITU-T     IETF IAB     2013-04-02
[ 0018 ]  
 
LS/i on Plans for implementation of Resolution 77 and recommendations to TSAG     ITU-T SG13     2013-03-26
[ 0017 ]  
 
LS/i on Study of signalling requirement and protocol on SDN     ITU-T SG11     2013-03-15
[ 0016 ]  
 
LS/i on Alignment of testing work between SG11 and SG17     ITU-T SG11     2013-03-15
[ 0015 ]  
 
LS/i on Revised ToR of JCA-CIT     ITU-T SG11     2013-03-15
[ 0014 ]  
 
LS/i on Continuation of JCA-Cloud with revised ToR     ITU-T SG13     2013-03-13
[ 0013 ]  
(Rev.1) 
Report of the ISO/IEC JTC 1 Plenary, 5-10 November 2012     ITU-T Liaison Officer to JTC 1     2013-02-26
[ 0012 ]  
 
LS/i on SG2, Lead Study Group on Service Definition, Numbering, and Routing; Lead Study Group for Telecommunication for Disaster Relief/Early Warning     ITU-T SG2     2013-02-19
[ 0011 ]  
 
LS/i on Seeking Guidance on the implementation of exchanging work progress between SG2 and FG-DR&NRR     ITU-T SG2     2013-02-19
[ 0010 ]  
 
LS/i on Creation of a new Focus Group on "Smart and Sustainable Cities" (FG-SSC)     ITU-T SG5     2013-02-13
[ 0009 ]  
(Rev.1) 
LS/i/r on Smart Grid and Home Networking (JCA-SG&HN) - OLS 2 - E about the Activities related to smart grid     ITU-T FG AVA     2013-02-11
[ 0008 ]  
 
LS/i on Telecommunication Management and OAM Project Plan     ITU-T SG2     2013-02-05
[ 0007 ]  
 
LS/i on Acknowledgement of contributors     ITU-T SG9     2013-02-05
[ 0006 ]  
 
LS/i on Correction of title of Question 9/15 (QK/15)     ITU-T SG15     2013-01-30
[ 0005 ]  
 
LS/i on Activities related to smart grid     Conveners, JCA-SG&HN   ALL   2013-01-29
[ 0004 ]  
 
LS/i on Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"     Chairman, ITU-D SG1   ALL   2013-01-29
[ 0003 ]  
 
LS/i on Electronic Working Methods     ITU-T SG 15   ALL   2013-01-29
[ 0002 ]  
 
LS/i to ITU-T Study Groups, ITU Sectors, TSAG, CWG-COP     JCA-COP   ALL   2013-01-29
[ 0001 ]  
 
LS/i to ITU-D Question 20-1 on funding persons with disabilities attending Focus Groups     Convener, JCA-AHF   ALL   2013-01-29
Results:87 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-06-29