International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 16 : Meeting 2014-06-30 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 16  C (2014-06-30) 

ITU-T SG 16

Multimedia

Study Period 2013

Meeting  from 2014-06-30 to 2014-07-11

held in Japan [Sapporo]

Other Meetings : 2015-10-12  2015-02-09  2014-02-28  2013-10-28  2013-01-14 

Results:24 total items.
Contributions  [ Questions: Q5/16 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 657 ]  
(Rev.1) 
2014-06-17 Electronics and Telecommunications Research Institute (ETRI)   F.TPS-Reqs: Proposed changes on multipoint multiview use case     Q5/16  
[ 630 ]  
 
2014-06-17 Polycom, Inc.   H.TPS-AV: TSB WinWord Comments     Q5/16  
[ 629 ]  
 
2014-06-17 Polycom, Inc.   H.TPS-AV: Requirement Terminology     Q5/16  
[ 628 ]  
 
2014-06-17 Polycom, Inc.   H.TPS-AV: Ambient Noise     Q5/16  
[ 562 ]  
(Rev.1) 
2014-06-16 Ministry of Industry and Information Technology (MIIT)   Proposed modifications to typo errors in FH.TPS-Arch     Q5/16  
[ 561 ]  
(Rev.1) 
2014-06-16 Ministry of Industry and Information Technology (MIIT)   F/H.TPS-Arch: Proposed modifications to lighting characteristics     Q5/16  
[ 560 ]  
(Rev.1) 
2014-06-16 Ministry of Industry and Information Technology (MIIT)   F/H.TPS-Arch: Proposed modifications to high level architecture     Q5/16  
[ 559 ]  
(Rev.1) 
2014-06-16 Ministry of Industry and Information Technology (MIIT)   F/H.TPS-Arch: Proposed modifications to Figure 11 "H.323 Telepresence system architecture"     Q5/16  
[ 558 ]  
(Rev.1) 
2014-06-16 Ministry of Industry and Information Technology (MIIT)   F/H.TPS-Arch: Proposed modifications to "7.1 media control functions"     Q5/16  
[ 514 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   H.TPS-SIG: Use of SCTP for CLUE signalling     Q5/16  
[ 513 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   H.TPS-AV: Use of CSE     Q5/16  
[ 511 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   H.TPS-AV: Updates to Appendix I parameter signalling analysis     Q5/16  
[ 510 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   H.TPS-AV Update of delay parameters (clause 7.1.4)     Q5/16  
[ 509 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   H.TPS-AV CLUE Alignments     Q5/16  
[ 508 ]  
 
2014-06-12 Huawei Technologies Co. Ltd.   F/H.TPS-Arch: Updates     Q5/16  
[ 507 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   F/H.TPS-Arch: Media control function updates     Q5/16  
[ 506 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   F/H.TPS-Arch: Call Process Updates     Q5/16  
[ 505 ]  
(Rev.1) 
2014-06-12 Huawei Technologies Co. Ltd.   F.TPS-Reqs: Updates     Q5/16  
[ 504 ]  
 
2014-06-12 ZTE Corporation   H.TPS-SIG: Carry the CLUE-relevant and CLUE-irrelevant capabilities     Q5/16  
[ 503 ]  
 
2014-06-12 ZTE Corporation   H.TPS-SIG: Describe the CLUE-irrelevant configurations     Q5/16  
[ 502 ]  
 
2014-06-12 ZTE Corporation   H.TPS-SIG: RAS procedures to support the CLUEControlCapability     Q5/16  
[ 501 ]  
 
2014-06-12 ZTE Corporation   H.TPS-SIG: Change the number of the clause     Q5/16  
[ 499 ]  
 
2014-06-12 ZTE Corporation   F.TPS-Reqs: Proposed several updates     Q5/16  
[ 477 ]  
 
2014-03-28 Dem. Rep. of the Congo   Telepresence systems (Volume 3)     Q5/16  
Results:24 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-10-25