International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:62 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  [ Source: ZTE Corporation ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 675 ]  
 
2014-03-11 Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Discussions onmulti-vendor IaDIof B100G     Q11/15  
[ 671 ]  
 
2014-03-11 Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposals for SMSR parameter in G.698.2.     Q6/15  
[ 628 ]  
 
2014-03-10 China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Proposal for studying intelligent node elements in optical fibre networks     Q16/15  
[ 585 ]  
 
2014-03-10 Broadcom Corporation , ZTE Corporation   Considerations of Error decorrelator for 100G and beyond FEC     Q11/15  
[ 584 ]  
 
2014-03-10 China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2     Q6/15  
[ 583 ]  
 
2014-03-10 ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Consideration about Spectral Excursion in G.698.2     Q6/15  
[ 581 ]  
 
2014-03-10 China Unicom , ZTE Corporation   Considerations about the EVM     Q6/15  
[ 580 ]  
 
2014-03-10 ZTE Corporation   Consideration about a requirement for consistency of switching action in G.mdsp     Q9/15  
[ 579 ]  
 
2014-03-10 ZTE Corporation   A proposed protection mechanism for a failure use case in G.MDSP     Q9/15  
[ 578 ]  
 
2014-03-10 ZTE Corporation   G.fast: Comments on link-state transition     Q4/15  
[ 533 ]  
 
2014-03-09 Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd. , ZTE Corporation   Optical layer overhead considerations and proposal for OTN B100G     Q6/15, Q11/15  
[ 529 ]  
 
2014-03-09 China Unicom , ZTE Corporation   Proposal of Multi-failure processing for ODUsmp     Q9/15  
[ 528 ]  
 
2014-03-09 ZTE Corporation   Proposal of APS signalling transmitting pattern for ODUsmp     Q9/15  
[ 461 ]  
 
2014-03-06 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Hierarchical connection control in Transport SDN     Q14/15, Q12/15  
[ 460 ]  
 
2014-03-06 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Interaction models between SDN controllers in multi-domain transport network     Q14/15, Q12/15  
[ 340 ]  
 
2013-06-18 ZTE Corporation   Protection Switching in TWDM-PON system     Q2/15  
[ 270 ]  
 
2013-06-17 ZTE Corporation   Unified ONU power management     Q2/15  
[ 268 ]  
 
2013-06-17 ZTE Corporation   Activation in TWDM-PON system     Q2/15  
[ 267 ]  
 
2013-06-17 ZTE Corporation   Proposal for PLOAM messages for tuning function in NG-PON2 TC layer during normal operation     Q2/15  
[ 266 ]  
 
2013-06-17 China Mobile Communications Corporation , China Telecommunications Corporation , ZTE Corporation   Proposal to close the item 11 in G.987.3A2 living list with answer for "ANNEX" approach     Q2/15  
[ 263 ]  
 
2013-06-17 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   proposal for study on requirements for wavelength selective reflector in in-service fibre test system application     Q17/15  
[ 221 ]  
 
2013-06-17 China Telecommunications Corporation , Sigma Designs Israel S.D.I Ltd. , ZTE Corporation   Improving Power Saving Efficiency     Q18/15  
[ 213 ]  
 
2013-06-17 ZTE Corporation   Status update for ODU SMP     Q9/15  
[ 198 ]  
 
2013-06-17 ZTE Corporation   G.hs,G.fast::Additional carrier sets for G.fast     Q4/15  
[ 187 ]  
 
2013-06-17 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ministry of Industry and Information Technology (MIIT) , Telecom Italia S.p.A. , ZTE Corporation   Proposal on initiating a new work item on transport SDN  
Withdrawn: Duplicate of C-0148
 
Q14/15, Q12/15  
Results:62 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-9-22