International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:75 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: Ministry of Industry and Information Technology (MIIT) ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1029 ]  
 
2014-11-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to revise G.suppl.41 considering 100G application     Q8/15  
[ 1028 ]  
 
2014-11-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to revise G.973.1 considering 100G application     Q8/15  
[ 1027 ]  
 
2014-11-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to revise G.973 considering 100G application     Q8/15  
[ 966 ]  
 
2014-11-10 China Unicom , Deutsche Telekom AG Standardization , EXFO Inc. , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal to specify the EVM related parameters of 100G transmitters in G.698.2     Q6/15  
[ 950 ]  
 
2014-11-10 China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: Technical proposals for enhanced data rate and co-existence with vectored Profiles 17a     Q4/15  
[ 949 ]  
 
2014-11-10 China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: Requirements for enhanced data rate and co-existence with vectored Profiles 17a     Q4/15  
[ 946 ]  
 
2014-11-10 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal for studying node elements in optical fibre infrastructure management systems     Q16/15  
[ 927 ]  
 
2014-11-10 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal on Sync Management and OAM     Q14/15, Q13/15, Q10/15  
[ 892 ]  
 
2014-11-10 ZTE Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT)   Further clarification on EVM calculation in G.698.2     Q6/15  
[ 871 ]  
 
2014-11-09 Ministry of Industry and Information Technology (MIIT) , FiberHome Technologies Group   The OChCn signal should be updated into G. 874     Q14/15  
[ 870 ]  
 
2014-11-09 Ministry of Industry and Information Technology (MIIT) , FiberHome Technologies Group   The OTUCn signal should be updated into G. 874     Q14/15  
[ 868 ]  
 
2014-11-09 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   The proposal about adding an note to the 15.7.2.4 of G.709     Q11/15  
[ 867 ]  
 
2014-11-09 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Appendix of G.709 - considerations of phase/time synchronization over OTN     Q11/15  
[ 818 ]  
 
2014-11-06 Ministry of Industry and Information Technology (MIIT)   Create new recommendation: L.oxcon "outdoor optical cross connect cabinet"     Q16/15  
[ 816 ]  
 
2014-11-06 Ministry of Industry and Information Technology (MIIT)   Some proposal on draft revised L.36     Q7/15  
[ 814 ]  
 
2014-11-05 Ministry of Industry and Information Technology (MIIT)   Proposal of new recommendation on studying indoor high speed Visible Light Communications(VLC) system in Q2/SG15     Q2/15  
[ 813 ]  
(Rev.1) 
2014-11-05 China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT)   Test of frequency delivery over aerial-optical-cable-based network     Q13/15  
[ 812 ]  
 
2014-11-05 Ministry of Industry and Information Technology (MIIT)   Proposals for supporting alarm and performance management in G.asdtn     Q14/15, Q12/15  
[ 811 ]  
(Rev.1) 
2014-11-05 Ministry of Industry and Information Technology (MIIT)   4 Proposal on revision of Recommendation L.60     Q16/15  
[ 796 ]  
(Rev.1) 
2014-11-04 Ministry of Industry and Information Technology (MIIT)   Proposal on revision of Rec. G.654     Q5/15  
[ 795 ]  
 
2014-11-04 Ministry of Industry and Information Technology (MIIT)   OSNR test method discussion for beyond 100G     Q6/15  
[ 794 ]  
 
2014-11-04 Ministry of Industry and Information Technology (MIIT)   Further discussion on SMSR parameter     Q6/15  
[ 793 ]  
 
2014-11-04 Ministry of Industry and Information Technology (MIIT)   Considerations on G.CCA , G.8080 and G.asdtn     Q14/15, Q12/15  
[ 792 ]  
 
2014-11-04 Ministry of Industry and Information Technology (MIIT)   Some considerations and proposals to Gsup.ethpm     Q14/15, Q10/15  
[ 764 ]  
 
2014-03-11 China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: New 998ADE17 Band Plan for VDSL2     Q4/15  
Results:75 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-12-19