International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:45 total items.
Contributions  [ Source: Futurewei Technologies US R ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1838 ]  
 
2016-02-02 Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Q4/15  
[ 1836 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Proposed Dimming Control Scheme for Low-Speed VLC     Q18/15  
[ 1835 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OOK for Indoor Low-Speed VLC     Q18/15  
[ 1834 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: On Optical Wireless Communication Channel Model     Q18/15  
[ 1833 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OFDM with Dimming Control for High-Speed VLC     Q18/15  
[ 1832 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OFDM for Indoor High-Speed VLC     Q18/15  
[ 1831 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Multiple Asymmetrically Clipped Optical OFDM     Q18/15  
[ 1830 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Feasibility of Specifying VLC as a Profile of G.hn Recommendations     Q18/15  
[ 1774 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , Futurewei Technologies US R&D Center   On G.fast based solution for Coax application     Q4/15  
[ 1729 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Dual-rate support in XGS-PON     Q2/15  
[ 1723 ]  
 
2016-02-01 Futurewei Technologies US R&D Center   G.RoF system architecture     Q2/15  
[ 1721 ]  
 
2016-02-01 Broadcom Corporation , Futurewei Technologies US R&D Center   Proposal for 10G burst profile in G.XGS-PON     Q2/15  
[ 1348 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: MIMO Processing versus FEXT Cancellation     Q4/15  
[ 1340 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: Additional retransmission parameters exchanged during initialization     Q4/15  
[ 1339 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   G.fast: Test Parameter Xlin     Q4/15  
[ 1338 ]  
 
2015-06-08 Futurewei Technologies US R&D Center , Lantiq Beteiligungs-GmbH & Co. KG   G.fast: Proposed items for G.9701 corrigendum     Q4/15  
[ 1244 ]  
 
2015-06-08 Futurewei Technologies US R&D Center   Comments to G.989.3 Draft 20150601     Q2/15  
[ 1133 ]  
 
2014-11-11 Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Clause 17.1: Announcement     Q2/15  
[ 1035 ]  
 
2014-11-11 Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   G.vdsl: New VDSL2 Band Plan for China     Q4/15  
[ 1034 ]  
 
2014-11-11 Futurewei Technologies US R&D Center   Calculation of Hlog     Q4/15  
[ 1033 ]  
 
2014-11-11 Futurewei Technologies US R&D Center   G.fast: Symbol transmission in L2.2 state     Q4/15  
[ 995 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Proposal of G.989.2 Annex C, Wavelength-Routed PtP WDM PMD     Q2/15  
[ 993 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Proposal of G.989.2 Annex A PtP WDM PMD table parameter update with FEC enabled     Q2/15  
[ 985 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Power saving with channel selection     Q2/15  
[ 982 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Proposal of G.989.3 Annex H - PtP WDM Transmission Convergence Layer     Q2/15  
[ 979 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Proposal of G.989.3 Annex on "Transcoded Framing with FEC and OAM for PtP WDM TC"     Q2/15  
[ 962 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   A possible next stage of TWDM PON: 100G-PON     Q2/15  
[ 891 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"     Q2/15  
[ 890 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"  
No file provided
 
Q2/15  
[ 889 ]  
 
2014-11-10 Futurewei Technologies US R&D Center   Aggregated Analog Radio over Fiber (AA-ROF)     Q2/15  
[ 709 ]  
 
2014-03-11 China Telecommunications Corporation , Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Comments on Clause 13 of G.989.3     Q2/15  
[ 602 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Reusing PON-ID as TWDM channel ID     Q2/15  
[ 600 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"     Q2/15  
[ 199 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation , Futurewei Technologies US R&D Center   G.fast: Initialization     Q4/15  
[ 131 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Full capacity in NG-PON2 using line coding     Q2/15  
[ 130 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Proposal to study AWG based WDM PON proposal in mobile front-haul application     Q2/15  
[ 129 ]  
 
2013-06-15 Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Q2/15  
[ 128 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   On the concept of out-of-band ranging in TWDM PONs     Q2/15  
[ 127 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Impacts of line code change on G.989.2     Q2/15  
[ 117 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   G.poc draft proposal     Q2/15  
[ 116 ]  
 
2013-06-15 ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     Q2/15  
[ 115 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Multiple rate TC extension for TWDM     Q2/15  
[ 108 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: SOS-like Scheme as Fast OLR     Q4/15  
[ 107 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Q4/15  
[ 106 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: Configuration of Gap Time Parameter Tg2     Q4/15  
Results:45 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-29