International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:15 total items.
Contributions  [ Source: Futurewei Technologies US R ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 709 ]  
 
2014-03-11 China Telecommunications Corporation , Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Comments on Clause 13 of G.989.3     Q2/15  
[ 602 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Reusing PON-ID as TWDM channel ID     Q2/15  
[ 600 ]  
 
2014-03-10 Futurewei Technologies US R&D Center   Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"     Q2/15  
[ 199 ]  
(Rev.1) 
2013-06-17 Broadcom Corporation , Futurewei Technologies US R&D Center   G.fast: Initialization     Q4/15  
[ 131 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Full capacity in NG-PON2 using line coding     Q2/15  
[ 130 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Proposal to study AWG based WDM PON proposal in mobile front-haul application     Q2/15  
[ 129 ]  
 
2013-06-15 Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Q2/15  
[ 128 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   On the concept of out-of-band ranging in TWDM PONs     Q2/15  
[ 127 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Impacts of line code change on G.989.2     Q2/15  
[ 117 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   G.poc draft proposal     Q2/15  
[ 116 ]  
 
2013-06-15 ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     Q2/15  
[ 115 ]  
 
2013-06-15 Futurewei Technologies US R&D Center   Multiple rate TC extension for TWDM     Q2/15  
[ 108 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: SOS-like Scheme as Fast OLR     Q4/15  
[ 107 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Q4/15  
[ 106 ]  
 
2013-06-14 Futurewei Technologies US R&D Center   G.fast: Configuration of Gap Time Parameter Tg2     Q4/15  
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-7-26