International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:148 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: FiberHome Technologies Group ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1784 ]  
 
2016-02-02 FiberHome Technologies Group   Proposal on dual rate PMD reference design for XGS-PON     Q2/15  
[ 1781 ]  
(Rev.1) 
2016-02-02 FiberHome Technologies Group   Consideration for upstream dual-rate XGS-PON     Q2/15  
[ 1738 ]  
 
2016-02-02 FiberHome Technologies Group   Physical and logical node in G.MDSP     Q9/15  
[ 1737 ]  
(Rev.1) 
2016-02-02 FiberHome Technologies Group   ERP consideration in G.MDSP     Q9/15  
[ 1736 ]  
 
2016-02-02 FiberHome Technologies Group   Protection method for DNI scenario in G.mdsp     Q9/15  
[ 1735 ]  
(Rev.1) 
2016-02-02 FiberHome Technologies Group   Proposals for Interconnection use case in Appendix I of G.MDSP     Q9/15  
[ 1729 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Dual-rate support in XGS-PON     Q2/15  
[ 1689 ]  
 
2016-02-01 FiberHome Technologies Group   Consideration of ERP Management in G.Sup52     Q9/15, Q14/15  
[ 1685 ]  
 
2016-02-01 FiberHome Technologies Group   Proposal on smoothly upgrade requirements in the new Rec. L.oxcon     Q16/15  
[ 1684 ]  
 
2016-02-01 FiberHome Technologies Group   ERP Management Requirements of G.8032     Q9/15, Q14/15  
[ 1680 ]  
 
2016-02-01 FiberHome Technologies Group   Proposals on adding the definitions of two attributes in revision of Rec. G.650.1     Q5/15  
[ 1632 ]  
 
2016-02-01 Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposal of initial a new standardization for Port-based protection in OTN network     Q9/15  
[ 1631 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Proposal to study MPLS-TP service information model pruning and refactoring     Q14/15, Q10/15  
[ 1630 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal to restart working on G.8132 aligned with MPLS working group, IETF     Q9/15  
[ 1622 ]  
 
2016-02-01 FiberHome Technologies Group   Proposal of new section "8.4 Common interaction between architectural components" of G.cca     Q14/15, Q12/15  
[ 1621 ]  
 
2016-02-01 FiberHome Technologies Group   Proposal of move section 8.5 to 9.3 of G.asdtn     Q14/15, Q12/15  
[ 1619 ]  
 
2016-02-01 China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Proposal of new appendix about network migration of SDTN in G.asdt     Q14/15, Q12/15  
[ 1609 ]  
 
2016-02-01 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposals about centralized recovery for SDN controlled transport network     Q9/15, Q14/15, Q12/15  
[ 1604 ]  
 
2016-02-01 China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , OFS Fitel, LLC   Field trials and proposal of G.654 for terrestrial application     Q6/15, Q5/15  
[ 1603 ]  
(Rev.1) 
2016-02-01 FiberHome Technologies Group   The requirement of Yang module in MPLS-TP  
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
 
Q14/15, Q10/15  
[ 1602 ]  
 
2016-02-01 FiberHome Technologies Group   The consideration of interworking between OTUC1 and OTU4     Q11/15  
[ 1600 ]  
(Rev.1) 
2016-02-01 FiberHome Technologies Group   The suggestion about multichannel parallel interfaces in B100G  
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
 
Q6/15, Q11/15  
[ 1580 ]  
 
2016-01-31 FiberHome Technologies Group   Proposal of electrical performance for revision of recommendation L.60     Q16/15  
[ 1579 ]  
 
2016-01-31 FiberHome Technologies Group   Revision proposal for Appendix I Chinese experience of recommendation L.60     Q16/15  
[ 1578 ]  
 
2016-01-31 FiberHome Technologies Group   Propose to include pilot-tone auxiliary channel protocol as the G.ROF PON adaptation function     Q2/15  
[ 1577 ]  
 
2016-01-31 FiberHome Technologies Group   Comparison of three technical approaches of PON adaptation function in G.ROF     Q2/15  
[ 1473 ]  
 
2015-06-09 FiberHome Technologies Group   New type protection mode in G.989.1Amd1     Q2/15  
[ 1471 ]  
 
2015-06-09 FiberHome Technologies Group   Proposals to categorize type B protection for G.989.1Amd1     Q2/15  
[ 1455 ]  
 
2015-06-09 Alcatel-Lucent Shanghai Bell , China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Transport of the clockClass message over GPON     Q2/15, Q13/15  
[ 1434 ]  
 
2015-06-09 Electronics and Telecommunications Research Institute (ETRI) , Coriant GmbH & Co. KG , FiberHome Technologies Group , SK Telecom   New term and update of availability enhancement techniques     Q14/15, Q12/15  
[ 1433 ]  
(Rev.1) 
2015-06-09 FiberHome Technologies Group   Consideration on DNI fault scenarios in G.MDSP     Q9/15  
[ 1426 ]  
 
2015-06-09 FiberHome Technologies Group   Discussion of the protection types that can be supported by controller based protection in SDTN     Q14/15, Q12/15  
[ 1424 ]  
 
2015-06-09 China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal of new parameters of Single-Sided C+ Transceiver for G984.2 Amd1     Q2/15  
[ 1417 ]  
 
2015-06-09 China Unicom , FiberHome Technologies Group   Proposals for the latest draft of G.mdsp     Q9/15  
[ 1387 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration Hybrid Interconnection in G.MDSP     Q9/15  
[ 1386 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration of MCC in G.8021     Q10/15  
[ 1371 ]  
 
2015-06-09 FiberHome Technologies Group   Consideration DNI architecture in G.MDSP     Q9/15  
[ 1368 ]  
 
2015-06-09 China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement analysis of optical layer protection in metro WDM networks     Q9/15  
[ 1329 ]  
 
2015-06-08 China Mobile Communications Corporation , FiberHome Technologies Group   Consideration of network management in SDN     Q14/15, Q12/15  
[ 1300 ]  
 
2015-06-08 FiberHome Technologies Group   Proposals to architecture components classification and clarification of G.800     Q12/15  
[ 1298 ]  
 
2015-06-08 China Mobile Communications Corporation , FiberHome Technologies Group   Consideration of Sync Pacs in G.gim     Q14/15  
[ 1296 ]  
 
2015-06-08 FiberHome Technologies Group   Functional requirements for SDN CPI and M-CPI in G.asdtn     Q14/15, Q12/15  
[ 1295 ]  
 
2015-06-08 FiberHome Technologies Group   Consideration for single-end/Dual-end performance measurement in G.8052 and G.8152     Q14/15  
[ 1263 ]  
 
2015-06-08 FiberHome Technologies Group   Proposal on RTM for cable cut-off wavelength in revision of ITU-T Rec. G.650.1     Q5/15  
[ 1262 ]  
 
2015-06-08 FiberHome Technologies Group   Revision Proposal for Appendix I of recommendation L.60     Q16/15  
[ 1261 ]  
 
2015-06-08 FiberHome Technologies Group   Proposal of technical clauses for revision of recommendation L.60     Q16/15  
[ 1251 ]  
(Rev.1) 
2015-06-08 FiberHome Technologies Group   The suggestion of adding some new Abbreviations and acronyms into G.709 and G.798     Q11/15  
[ 1250 ]  
 
2015-06-08 FiberHome Technologies Group   The modification of figure 15-1B of G.709     Q11/15  
[ 1249 ]  
 
2015-06-08 FiberHome Technologies Group   Proposal of a new PTP TC layer structure diagram     Q2/15  
[ 1248 ]  
 
2015-06-08 FiberHome Technologies Group   Adding ODUCn to figures 12-2 and 12-3 of G.709     Q11/15  
Results:148 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-31