International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:32 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: Cisco Systems, Inc ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1077 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarification regarding G.8121 series Study Point 12     Q14/15, Q10/15  
[ 1074 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications for G.8121 series Study Point 10     Q14/15, Q10/15  
[ 1072 ]  
 
2014-11-11 Cisco Systems, Inc.   Editorial Issues in Gsup.ethpm     Q14/15, Q10/15  
[ 1071 ]  
 
2014-11-11 Cisco Systems, Inc.   Additional content for Gsup.ethpm     Q14/15, Q10/15  
[ 1070 ]  
 
2014-11-11 Cisco Systems, Inc.   Structure of Gsup.ethpm     Q14/15, Q10/15  
[ 1069 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications on Expected Defects in G.8021     Q10/15  
[ 1068 ]  
 
2014-11-11 Cisco Systems, Inc.   Clarifications on Bandwidth Notifications in G.8021     Q10/15  
[ 1067 ]  
 
2014-11-11 Cisco Systems, Inc.   Editorial corrections in G.8013 clause 2     Q10/15  
[ 1066 ]  
 
2014-11-11 Cisco Systems, Inc.   Use of MCC for EDM PDUs     Q10/15  
[ 1065 ]  
 
2014-11-11 Cisco Systems, Inc.   Adding reference to MEF46 in G.8013     Q10/15  
[ 1064 ]  
 
2014-11-11 Cisco Systems, Inc.   Status of references to MEF IAs in G.8011     Q10/15  
[ 991 ]  
 
2014-11-10 Cisco Systems, Inc. , Deutsche Telekom AG Standardization   Receiver implementation of measurements presented in WD06-31     Q6/15  
[ 449 ]  
 
2014-02-24 Cisco Systems, Inc.   Text changes in G.8021 for Expected Defect signalling     Q10/15  
[ 447 ]  
 
2014-02-24 Cisco Systems, Inc.   Text changes in G.8013 for Expected Defect signalling     Q10/15  
[ 446 ]  
 
2014-02-24 Cisco Systems, Inc.   Expected Defect signalling in G.8013 Ethernet OAM     Q10/15  
[ 445 ]  
 
2014-02-24 Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Text changes in G.8021 for Adaptive Bandwidth Notifications     Q10/15  
[ 444 ]  
 
2014-02-24 Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Text changes in G.8013 for Adaptive Bandwidth Notifications     Q10/15  
[ 443 ]  
 
2014-02-24 China Mobile Communications Corporation , Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Adaptive Bandwidth Notifications in G.8013 Ethernet OAM     Q10/15  
[ 258 ]  
 
2013-06-17 Cisco Systems, Inc. , Vitesse Semiconductor Corporation   PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Q13/15  
[ 18 ]  
 
2013-05-31 Cisco Systems, Inc.   Text Changes in G.8021 for At Risk signalling     Q9/15, Q14/15, Q10/15  
[ 17 ]  
 
2013-05-31 Cisco Systems, Inc.   Text changes in Y.1731 for At Risk signalling     Q9/15, Q10/15  
[ 16 ]  
 
2013-05-31 Cisco Systems, Inc.   "At Risk" signalling in Y.1731 Ethernet OAM     Q9/15, Q14/15, Q10/15  
[ 14 ]  
 
2013-05-29 Cisco Systems, Inc.   LCK/AIS Reception Process in G.8121.2     Q9/15, Q10/15  
[ 12 ]  
 
2013-05-29 Cisco Systems, Inc.   Clarification regarding Dataplane Loopback in G.8121.2     Q9/15, Q10/15  
[ 11 ]  
 
2013-05-29 Cisco Systems, Inc.   Clarification regarding Dataplane Loopback in G.8121     Q9/15, Q10/15  
Results:32 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-11-29