International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:79 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: China Telecommunications Corporation ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2213 ]  
 
2016-09-07 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Consideration on Functional Requirements for Transport SDN CPI     Q14/15, Q12/15  
[ 2086 ]  
 
2016-09-06 China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , Swisscom SA   G.fast: The next generation of DSL beyond current G.fast     Q4/15  
[ 2069 ]  
 
2016-09-06 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   OMCI management support for XGS-PON     Q2/15  
[ 2041 ]  
 
2016-09-05 China Telecommunications Corporation , Orange   Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     Q6/15  
[ 2018 ]  
 
2016-09-05 China Telecommunications Corporation , ETRI , Huawei Technologies Co., Ltd.   Consideration on Network Resource Slicing in G.asdtn     Q14/15, Q12/15  
[ 1940 ]  
 
2016-09-02 Broadcom Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposal of a new supplement on 25 Gb/s transmission per wavelength     Q2/15  
[ 1918 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to start a new project to specify CPRI over OTN phase 2     Q11/15  
[ 1917 ]  
(Rev.1-2) 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Intel Corporation , IP Light , Xilinx Incorporation   CPRI over OTN phase II extension     Q11/15  
[ 1915 ]  
 
2016-09-01 China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co., Ltd.   100G/B100G multi-vendor FlexO based SOTUm interface family     Q11/15  
[ 1906 ]  
 
2016-09-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Interoperability of different secure admission mechanisms     Q18/15  
[ 1729 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Dual-rate support in XGS-PON     Q2/15  
[ 1726 ]  
 
2016-02-02 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Values proposed for table B.II.1 of G.XGS-PON     Q2/15  
[ 1725 ]  
 
2016-02-02 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Updated text for parts of G.9978Recommendation     Q18/15  
[ 1705 ]  
 
2016-02-01 China Telecommunications Corporation , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Consideration on Mapping Interface Requirement in ACTN to G.asdtn     Q14/15, Q12/15  
[ 1699 ]  
 
2016-02-01 Huawei Technologies Co., Ltd. , China Telecommunications Corporation   G.vlc: Proposal for supporting the mobility and interference mitigation in G.vlc     Q18/15  
[ 1686 ]  
 
2016-02-01 Huawei Technologies Co., Ltd. , China Telecommunications Corporation , ZTE Corporation   Eye diagram Mask for XGS-PON     Q2/15  
[ 1671 ]  
 
2016-02-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Considerations of interconnection between FlexE and xGE     Q11/15  
[ 1628 ]  
 
2016-02-01 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to study OTN data plane pruning and refactoring     Q11/15  
[ 1609 ]  
 
2016-02-01 China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Proposals about centralized recovery for SDN controlled transport network     Q9/15, Q14/15, Q12/15  
[ 1591 ]  
 
2016-02-01 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom   Promote the progress of G.MDSP to address operators' urgent needs     Q9/15  
[ 1506 ]  
(Rev.1-2) 
2016-01-20 Acacia Communications, Inc , China Telecommunications Corporation , Orange , Telecom Italia S.p.A.   Metro 100G WDM interface for optical transport networks     Q6/15  
[ 1424 ]  
 
2015-06-09 China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal of new parameters of Single-Sided C+ Transceiver for G984.2 Amd1     Q2/15  
[ 1368 ]  
 
2015-06-09 China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement analysis of optical layer protection in metro WDM networks     Q9/15  
[ 1357 ]  
 
2015-06-09 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd.   Proposal of standardization for cascaded and nested protection of multiple OTN domains     Q9/15, Q11/15  
[ 1355 ]  
 
2015-06-08 Alcatel-Lucent International , Calix Networks, Inc. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. , Orange , Verizon Communication Corporation   ICTP primitives description     Q2/15  
[ 1305 ]  
 
2015-06-08 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Including nodes to an secure domain through MAC authorization     Q18/15  
[ 1304 ]  
 
2015-06-08 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Creating a new secure domain through MAC authorization     Q18/15  
[ 1303 ]  
 
2015-06-08 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   G.hn: Proposal of updated text for the use cases of MAC authorization-based secure admission.     Q18/15  
[ 1268 ]  
 
2015-06-08 China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Propose a mechanism to use flexibility of OTN based on logical channel unit model     Q11/15  
[ 1245 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , China Telecommunications Corporation   Requirements of flexible B100G OTUCn interface     Q11/15  
[ 1232 ]  
 
2015-06-08 Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , ZTE Corporation   Proposal for speed up long-haul high bitrate WDM systems Recommendation study     Q6/15  
[ 1204 ]  
 
2015-06-05 China Telecommunications Corporation   SDN&NFV Research in Optical access network evolution     Q2/15  
[ 1203 ]  
 
2015-06-05 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   XG-PON2 Requirements and Standardization Proposal     Q2/15  
[ 1201 ]  
 
2015-06-05 China Telecommunications Corporation   Test results based on ONU with integrated OTDR reflecting device for Appendix I.2 of L.53     Q17/15  
[ 1180 ]  
 
2015-06-03 China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Proposal to start a new project to define FlexO interfaces     Q11/15  
[ 1171 ]  
(Rev.1) 
2015-06-01 China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   Application scenario of flexible OTN based on logical channel model     Q11/15  
[ 1170 ]  
 
2015-06-01 China Telecommunications Corporation   Proposed text for Clause 11 of G.asdtn on Management of the applications     Q14/15, Q12/15  
[ 1019 ]  
 
2014-11-11 China Telecommunications Corporation , ZTE Corporation   Proposal for Clause 13 and Appendix II     Q2/15  
[ 1013 ]  
 
2014-11-11 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement of one to one and bidirectional switching protection of optical layer     Q9/15  
[ 946 ]  
 
2014-11-10 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal for studying node elements in optical fibre infrastructure management systems     Q16/15  
[ 937 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Implementation of protection with ONU wavelength tuning     Q2/15  
[ 913 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   B100G "L0 Service" considerations     Q11/15  
[ 886 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Proposal to modify G.989.1 to better facilitate wavelength routed ODN     Q2/15  
[ 882 ]  
 
2014-11-09 China Telecommunications Corporation , FiberHome Technologies Group   Comments on Section 7.3 of G.asdtn     Q14/15, Q12/15  
[ 881 ]  
 
2014-11-09 China Telecommunications Corporation , FiberHome Technologies Group   Inputs to G.astdn Section 9.1     Q14/15, Q12/15  
[ 819 ]  
(Rev.1) 
2014-11-06 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Proposed new Appendix I.2 of L.53     Q17/15  
[ 764 ]  
 
2014-03-11 China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: New 998ADE17 Band Plan for VDSL2     Q4/15  
[ 760 ]  
 
2014-03-11 China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Considerations on the timing of the OTN B100G amendment for G.709     Q12/15, Q11/15  
[ 739 ]  
(Rev.1) 
2014-03-11 China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     Q2/15  
[ 713 ]  
 
2014-03-11 China Telecommunications Corporation , ZTE Corporation   Proposed parameters for WDM1r in G.984.5     Q2/15  
Results:79 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-9-26