International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:42 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: China Telecommunications Corporation ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1019 ]  
 
2014-11-11 China Telecommunications Corporation , ZTE Corporation   Proposal for Clause 13 and Appendix II     Q2/15  
[ 1013 ]  
 
2014-11-11 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement of one to one and bidirectional switching protection of optical layer     Q9/15  
[ 946 ]  
 
2014-11-10 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal for studying node elements in optical fibre infrastructure management systems     Q16/15  
[ 937 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Implementation of protection with ONU wavelength tuning     Q2/15  
[ 913 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   B100G "L0 Service" considerations     Q11/15  
[ 886 ]  
 
2014-11-10 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Proposal to modify G.989.1 to better facilitate wavelength routed ODN     Q2/15  
[ 882 ]  
 
2014-11-09 China Telecommunications Corporation , FiberHome Technologies Group   Comments on Section 7.3 of G.asdtn     Q14/15, Q12/15  
[ 881 ]  
 
2014-11-09 China Telecommunications Corporation , FiberHome Technologies Group   Inputs to G.astdn Section 9.1     Q14/15, Q12/15  
[ 819 ]  
(Rev.1) 
2014-11-06 China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Proposed new Appendix I.2 of L.53     Q17/15  
[ 764 ]  
 
2014-03-11 China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: New 998ADE17 Band Plan for VDSL2     Q4/15  
[ 760 ]  
 
2014-03-11 China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Considerations on the timing of the OTN B100G amendment for G.709     Q12/15, Q11/15  
[ 739 ]  
(Rev.1) 
2014-03-11 China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     Q2/15  
[ 713 ]  
 
2014-03-11 China Telecommunications Corporation , ZTE Corporation   Proposed parameters for WDM1r in G.984.5     Q2/15  
[ 711 ]  
 
2014-03-11 China Telecommunications Corporation , ZTE Corporation   Proposal for Preconfigured Backup Channel Attributes     Q2/15  
[ 709 ]  
 
2014-03-11 China Telecommunications Corporation , Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Comments on Clause 13 of G.989.3     Q2/15  
[ 707 ]  
 
2014-03-11 China Telecommunications Corporation , ZTE Corporation   G.hn: Text Proposal for low power mechanism     Q18/15  
[ 705 ]  
 
2014-03-11 ZTE Corporation , China Telecommunications Corporation , Ministry of Industry and Information Technology (MIIT)   1588 PTP into OTUk overhead via GFP     Q11/15  
[ 697 ]  
 
2014-03-11 China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   G.hn: Discussion on method for creating a secure G.hn domain     Q18/15  
[ 691 ]  
 
2014-03-11 China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   proposal for TWDM PON Protection in G.989.1     Q2/15  
[ 690 ]  
(Rev.1) 
2014-03-11 China Telecommunications Corporation , ZTE Corporation   G.hn: New Power Saving Mechanism     Q18/15  
[ 689 ]  
 
2014-03-11 China Telecommunications Corporation   Proposed new content for L.53     Q17/15  
[ 680 ]  
 
2014-03-11 Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , China Unicom   Considerations for PTP over OTN network     Q13/15  
[ 667 ]  
 
2014-03-10 China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Component-based recursive description for software defined transport networks     Q14/15, Q12/15  
[ 666 ]  
 
2014-03-10 China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Virtualization for the software defined transport networks     Q14/15, Q12/15  
[ 663 ]  
 
2014-03-10 China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Proposal to start work on a Recommendation specifying the architecture of the software defined transport network     Q14/15, Q12/15  
Results:42 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-12-17