International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:222 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 1367 ]  
 
2015-06-09 ZTE Corporation   Proposal on Hold-off timer in G.873.1     Q9/15  
[ 1366 ]  
 
2015-06-09 ZTE Corporation   Proposal on SNC protection in G.808.1     Q9/15  
[ 1361 ]  
 
2015-06-09 China Unicom   Discussion on various scenarios for ODU SMP application     Q9/15  
[ 1359 ]  
 
2015-06-09 China Unicom   Network flattening application scenarios for future ODUSMP deployment     Q9/15  
[ 1358 ]  
 
2015-06-09 China Unicom   Consideration on vertical link of interconnected nodes in DNI of MDSP     Q9/15  
[ 1357 ]  
 
2015-06-09 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd.   Proposal of standardization for cascaded and nested protection of multiple OTN domains     Q9/15, Q11/15  
[ 1323 ]  
 
2015-06-08 China Unicom , Huawei Technologies Co., Ltd.   Cascaded protection     Q9/15, Q11/15  
[ 1317 ]  
 
2015-06-08 Huawei Technologies Co., Ltd.   Considerations on Centralized Recovery     Q9/15, Q14/15, Q12/15  
[ 1314 ]  
 
2015-06-08 Huawei Technologies Co., Ltd. , Infinera Corporation   ODU SMP - Automatic Protection Switching Triggers     Q9/15  
[ 1313 ]  
 
2015-06-08 Huawei Technologies Co., Ltd. , Infinera Corporation   Proposed Text for G.odusmp on Protection Characteristics and Architectures     Q9/15  
[ 1311 ]  
 
2015-06-08 Huawei Technologies Co., Ltd. , Infinera Corporation   Proposed Text for G.odusmp on APS Channel and Messages     Q9/15  
[ 1310 ]  
 
2015-06-08 Huawei Technologies Co., Ltd.   Proposed Text for Node Configuration G.odusmp     Q9/15  
[ 1309 ]  
 
2015-06-08 Huawei Technologies Co., Ltd.   Proposed Text for Node Behavior in G.odusmp     Q9/15  
[ 1206 ]  
 
2015-06-05 British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co., Ltd.   G.8031/Y.1342 - 1:1 Bidirectional Ethernet Protection Switching to Support Dual Parenting PON Protection     Q9/15  
[ 1145 ]  
 
2014-11-11 Alcatel-Lucent USA Inc.   Proposal regarding unidirectional failures in the context of G.mdsp     Q9/15  
[ 1144 ]  
 
2014-11-11 Alcatel-Lucent USA Inc.   G.mdsp scope, definitions, and network objectives     Q9/15  
[ 1142 ]  
 
2014-11-11 Alcatel-Lucent USA Inc.   Proposal regarding the null Interconnected Domain case     Q9/15  
[ 1139 ]  
 
2014-11-11 Alcatel-Lucent USA Inc.   Proposal to update the Q9/15 living list     Q9/15  
[ 1062 ]  
(Rev.1) 
2014-11-11 Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd. , Telecom Italia S.p.A.   Considerations about Terminology in G.mdsp     Q9/15  
[ 1061 ]  
 
2014-11-11 Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd. , Telecom Italia S.p.A.   Considerations about Network Objectives in G.mdsp     Q9/15  
[ 1044 ]  
 
2014-11-11 Electronics and Telecommunications Research Institute (ETRI)   Proposal on Clause 10 (OTN MDSP) of G.mdsp     Q9/15  
[ 1043 ]  
 
2014-11-11 Electronics and Telecommunications Research Institute (ETRI)   Editorial comments on G.873.2     Q9/15  
[ 1038 ]  
 
2014-11-11 ZTE Corporation   Proposal of ODU SMP     Q9/15  
[ 1037 ]  
 
2014-11-11 China Unicom , ZTE Corporation   Proposed protection for a failure of interconnected link in G.MDSP     Q9/15  
[ 1036 ]  
 
2014-11-11 China Unicom , ZTE Corporation   Consideration on network objective in G.mdsp     Q9/15  
[ 1015 ]  
 
2014-11-11 China Unicom , Huawei Technologies Co. Ltd. , ZTE Corporation   Consideration on the interconnected link at the domain boundary     Q9/15  
[ 1014 ]  
 
2014-11-11 China Unicom   Consideration on the Back-to-Back interconnection scenarios of G.MDSP     Q9/15  
[ 1013 ]  
 
2014-11-11 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement of one to one and bidirectional switching protection of optical layer     Q9/15  
[ 1011 ]  
 
2014-11-11 China Unicom , Huawei Technologies Co. Ltd.   Proposal of left questions in G.873.1 Amendment 1     Q9/15  
[ 972 ]  
 
2014-11-10 British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   G.8031/Y.1342 - 1:1 Unidirectional Ethernet Protection Switching to Support Dual parenting PON Protection     Q9/15  
[ 971 ]  
 
2014-11-10 Alcatel-Lucent USA Inc.   ODU SMP High Order Signalling Option     Q9/15  
[ 948 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Status Summary for ODU SMP Protocols     Q9/15  
[ 947 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Proposed Text for G.odusmp     Q9/15  
[ 943 ]  
 
2014-11-10 British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   High level description of a protection solution using dual parented type B (TDM/TDMA) PON     Q9/15  
[ 942 ]  
 
2014-11-10 Huawei Technologies Co. Ltd. , Infinera Corporation   ODU SMP 1-Stage Protocol     Q9/15  
[ 941 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Multi-frame Calculation for ODU SMP Proposal     Q9/15  
[ 938 ]  
 
2014-11-10 Huawei Technologies Co. Ltd.   Proposed DNI solution for Ethernet linear protection in G.mdsp     Q9/15  
[ 920 ]  
 
2014-11-10 China Mobile Communications Corporation   Proposal of Configuration Management for G.8131     Q9/15, Q14/15  
[ 908 ]  
 
2014-11-10 FiberHome Technologies Group   clarification of protected domain an protected subnetwork for G.MDSP     Q9/15  
[ 907 ]  
 
2014-11-10 FiberHome Technologies Group   Recovery scenario consideration in G.msdp     Q9/15  
[ 906 ]  
 
2014-11-10 FiberHome Technologies Group   Ethernet ring DNI function model for MDSP     Q9/15  
[ 905 ]  
(Rev.1) 
2014-11-10 FiberHome Technologies Group   Considerations about vertical links between interconnected nodes     Q9/15  
[ 860 ]  
(Rev.1) 
2014-11-09 Nippon Telegraph and Telephone Corporation (NTT)   Study points of intelligent data plane recovery based on centralized controller     Q9/15, Q14/15, Q12/15  
[ 835 ]  
 
2014-11-07 Fujitsu Limited   Trail protection support in MPLS-TP linear protection     Q9/15, Q10/15  
[ 791 ]  
 
2014-11-04 Korea (Rep. of)   Format of APC specific information in G.8131     Q9/15  
[ 789 ]  
 
2014-11-04 Korea (Rep. of)   Technical comments on G.873.2     Q9/15  
[ 754 ]  
 
2014-03-11 Electronics and Telecommunications Research Institute (ETRI)   Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Q9/15  
[ 752 ]  
 
2014-03-11 Electronics and Telecommunications Research Institute (ETRI)   Discussion of transfer time and DRNI for G.mdsp     Q9/15  
[ 741 ]  
 
2014-03-11 Alcatel-Lucent France   Comments on latest G.MDSP Living List     Q9/15  
[ 740 ]  
 
2014-03-11 Alcatel-Lucent France   Comments on latest G.MDSP draft     Q9/15  
Results:222 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-12-8